Total Yield Pillar Longwall Development-Experimental Results, No. 4 Mine, Brookwood, Alabama

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 7
- File Size:
- 333 KB
- Publication Date:
- Jan 1, 1986
Abstract
Jim Walter Resources No. 4 mine produces coal through retreat longwall mining at 610 to 670 m (2000 to 2200 ft) of depth. A three entry, total yield pillar, longwall development experimental region was established for three adjacent longwall panels utilizing 6.1 m (20 ft) wide gate section pillars. Presently, the first longwall panel is completed with roadway deformational behavior monitored for a ground control assessment of the mining system. Data illustrate that the total yield pillar gate section design at No. 4 mine is presently comparable to gate section designs having large equal size chain pillars. Ground conditions will continue to be monitored during the mining of subsequent longwall panels in order to determine the ground control implications from multiple panel extraction.
Citation
APA:
(1986) Total Yield Pillar Longwall Development-Experimental Results, No. 4 Mine, Brookwood, AlabamaMLA: Total Yield Pillar Longwall Development-Experimental Results, No. 4 Mine, Brookwood, Alabama. Society for Mining, Metallurgy & Exploration, 1986.