Abstract

The Hedley and Grant pillar strength formula is widely used within the South African mining industry to calculate pillar strengths in bord and pillar mining layouts, and is currently being used at Bathopele Mine. Bathopele is an operation of Anglo American Platinum near Rustenburg, mining the UG2 reef at depths ranging from 40 m to 300 m below surface. The formula includes a parameter K, which is a downrated uniaxial compressive strength value of the rock, used to calculate the strength of a pillar. At Bathopele Mine, for the shallower areas Less than 150 m the value was 33 MPa, but this was increased to 44 MPa due to the fact that rock mass conditions improved and there were no incidence of failure in the shallower areas. Underground observations showed pillars to be stable with no signs of failure, and it was questioned whether the design was not still too conservative, resulting in sub-optimal extraction ratios and consequently a loss of revenue to the mine. A trial mining section was started at the mine where the pillars were reduced from 6 m x 6 m to 5 m x 5 m and the pillar behaviour was monitored for the onset of failure. Numerical modelling was conducted using the TEXAN code to back-analyse pillar stresses in order to find a more realistic value for K. Results from the trial section indicated that the pillar design was in fact too conservative, and the value for K was adjusted to 54 MPa for future designs. This paper details the findings from underground monitoring and numerical modelling results, and includes details for further calibration of the K value in order to further optimize the extraction of the orebody.
Citation

APA: Y. Rajpal  (2012)  Towards An Improved Pillar Design Methodology At Bathopele Mine

MLA: Y. Rajpal Towards An Improved Pillar Design Methodology At Bathopele Mine. The Southern African Institute of Mining and Metallurgy, 2012.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account