Treating Low Grade Solutions At The Crofoot Mine

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 4
- File Size:
- 176 KB
- Publication Date:
- Jan 1, 1990
Abstract
Commercial operations at the open pit, heap leach Crofoot Mine commenced in April, 1988. Approximately 13,600 tonnes (15,000 st) of low grade pregnant solution are treated daily using a Merrill-Crowe circuit. Acceptable gold recoveries from these low grade solutions can be obtained by optimizing solution pre-treatment prior to zinc addition.
Citation
APA:
(1990) Treating Low Grade Solutions At The Crofoot MineMLA: Treating Low Grade Solutions At The Crofoot Mine. Society for Mining, Metallurgy & Exploration, 1990.