Tropicana Gold Mine - Mitigating the Challenges of a Mining Start-up

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 9
- File Size:
- 3064 KB
- Publication Date:
- Sep 26, 2013
Abstract
The Tropicana deposit was discovered in 2005 after AngloGold Ashanti followed up an unexplained gold-in-soil anomaly. Discovered in a remote, barely-explored area of Western Australia not previously thought prospective for gold, Tropicana is the most significant gold find in Australia for more than a decade. The new, large scale open pit gold mining operation will produce an annual production of around 330 000 to 400 000 oz over a ten year mine life mining around 60 Mt/a.Process plant construction started in early 2012 and is due to finish in the December 2013 quarter. The mining contract was awarded to Macmahon Holdings (Macmahon) and mining commenced in July 2012 using conventional drill and blast, truck and excavator open cut methods.As a construction and start-up project in a greenfields location, the establishment of mining activities at Tropicana Gold Mine (TGM) involves the implementation of technical and operational systems, including the mining contract. Some of these systems and likely challenges were identified during earlier studies, while others were not foreseen until they were encountered. Alternatively, the time frames around implementation change depending on the changing knowledge of the project and industry environment. These systems include those common to the industry and those specific to the operation and location.This paper examines the implementation and development of a number of the systems specific to the establishment of mining operations, including the history, process and some outcomes. Although expected to be discrete systems to implement, they become interdependent. This linkage between systems further offers challenges and opportunities for the continuous progress of each system and for TGM as a whole.CITATION:Chow, J, Fitzpatrick, S, Greenup, D and Lloyd, S, 2013. Tropicana Gold Mine - mitigating the challenges of a mining start-up, in Proceedings World Gold 2013 , pp 51-60 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Citation
APA:
(2013) Tropicana Gold Mine - Mitigating the Challenges of a Mining Start-upMLA: Tropicana Gold Mine - Mitigating the Challenges of a Mining Start-up. The Australasian Institute of Mining and Metallurgy, 2013.