Tuluwaka Mine – From Greenfield to Production in 14 Months

Canadian Institute of Mining, Metallurgy and Petroleum
Ross Nairn
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
12
File Size:
1462 KB
Publication Date:
Jan 1, 2006

Abstract

"Tulawaka Mine is a joint venture between Pangea Minerals Limited 70% (a wholly-owned subsidiary of Barrick Gold Corporation) and Northern Mining 30%. Tulawaka Mine is located in North West of Tanzania in the Lake Victoria Goldfields. Tulawaka Mine is scheduled to process 360,000 tonnes per year at an average 11.5 g/t head grade over a 4 year mine life.The Tulawaka Process Plant uses single stage crushing, single stage SAG milling, gravity, intensive leach of gravity concentrates, CIL, Zadra desorption and cyanide detoxification to process the ore. Gold recovery exceeds (or is expected to) 95%.The Process Plant was designed and constructed under the supervision of Ausenco Engineering of Australia. Site works commenced in January 2004, Process Plant construction commenced in July 2004 and the first ore was presented to the Process Plant 26th February 2005. The first gold was poured on 15th March 2005. All construction contractors were demobilized from site 7th April 2005. Major achievements have been 3.4 million hrs LTI free during construction and operation to date, training of the Tanzanian workforce at Bulyanhulu Mine prior to commissioning, a succession plan to replace expatriate personnel with Tanzanian staff and significant over performance of the Process Plant against design.INTRODUCTIONTulawaka Mine is situated approximately 160 km south west of Mwanza in the western Lake Victoria Goldfields District of north western Tanzania. The property is held under a joint venture between Pangea Goldfields Inc (70%), a wholly owned subsidiary of Barrick Gold Corporation, and Explorations Minieres Du Nord Ltée (30%). A location map showing the position of the operation in Tanzania is shown in Figure 1.Mine site staff at Tulawaka comprises a combination of Tanzanian and Expatriate personnel. All Pangea personnel live on site and commute to their place of residence for their R&R on a 9 weeks on 4 weeks off roster."
Citation

APA: Ross Nairn  (2006)  Tuluwaka Mine – From Greenfield to Production in 14 Months

MLA: Ross Nairn Tuluwaka Mine – From Greenfield to Production in 14 Months. Canadian Institute of Mining, Metallurgy and Petroleum, 2006.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account