Tunnel Boring Machine Experience In The Milwaukee Program

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 27
- File Size:
- 2144 KB
- Publication Date:
- Jan 1, 1987
Abstract
One-half of the $607 million Conveyance construction portion of the Milwaukee Metropolitan Sewerage District's Water Pollution Abatement Program is completed or under contract. 12,200 m (7.5 miles) of tunnel boring machine (TBM) driven rock tunnel from 2.5 m (8.0 ft) to 9.9 m (32.3 ft) diameter has been completed. This paper presents a review of TBM performance and a discussion of the pertinent geological conditions of the area.