Tunnel Boring Under Stockholm City

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
4
File Size:
499 KB
Publication Date:
Jan 1, 1987

Abstract

Boring of a 7.5Km long tunnel under the city of Stockholm commenced in January, 1987. The 3.5m diameter tunnel will pass under the buildings and as no ground settlement is allowed, the regulation for water leakage into the tunnel is very strict. Probe drilling will be carried out continuously ahead of the boring and when water is encountered the rock has to be grouted before passing with the TBM. The tunnelling system enables probe drilling to be carried out during boring with the TBM. This has earlier been a capacity reducing factor as the whole operation has been stopped during probe drilling. The project is using a new generation TBM especially developed for hard rock formations which require higher thrust per cutter to get a high penetration rate.
Citation

APA:  (1987)  Tunnel Boring Under Stockholm City

MLA: Tunnel Boring Under Stockholm City. The Australasian Institute of Mining and Metallurgy, 1987.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account