Abstract
The Muck Valley Hydroelectric Project in Northeastern California required construction of a 3.65 meter tunnel through 6,623 meters of mixed volcanic flow deposits within a critical time frame. As Engineer and Construction Manager for the Project, Morrison-Knudsen Engineers invited bids for both Drill and Blast as well as Tunnel Boring Machine methods, selecting a contractor proposing a TBM designed and built specifically for this project which could excavate a wide variety of materials and maintain acceptable progress rates to complete the work within schedule. Tunnel lining as required included shotcrete with metal fibers and full circle concrete.
Citation
APA:
(1989) Tunnel Construction For The Muck Valley Hydro ProjectMLA: Tunnel Construction For The Muck Valley Hydro Project. Society for Mining, Metallurgy & Exploration, 1989.