Tunnel Construction For The Muck Valley Hydro Project

Society for Mining, Metallurgy & Exploration
Jorge Martinez
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
14
File Size:
1079 KB
Publication Date:
Jan 1, 1989

Abstract

The Muck Valley Hydroelectric Project in Northeastern California required construction of a 3.65 meter tunnel through 6,623 meters of mixed volcanic flow deposits within a critical time frame. As Engineer and Construction Manager for the Project, Morrison-Knudsen Engineers invited bids for both Drill and Blast as well as Tunnel Boring Machine methods, selecting a contractor proposing a TBM designed and built specifically for this project which could excavate a wide variety of materials and maintain acceptable progress rates to complete the work within schedule. Tunnel lining as required included shotcrete with metal fibers and full circle concrete.
Citation

APA: Jorge Martinez  (1989)  Tunnel Construction For The Muck Valley Hydro Project

MLA: Jorge Martinez Tunnel Construction For The Muck Valley Hydro Project. Society for Mining, Metallurgy & Exploration, 1989.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account