Tunnel Excavation At The Bad Creek Project

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 737 KB
- Publication Date:
- Jan 1, 1987
Abstract
This presentation will describe the underground excavation at the Bad Creek Pump Storage project. It consists of approximately 3,650 m of various size tunnels ranging from 4.2 m to 9.0 m finished diameter, a powerhouse cavern 45 m high by 135 m long by 22.5 m wide, and 422 m of 9 m diameter shaft. A total of 350,000 m of rock will be excavated, hauled, and placed in a submerged wier. Temporary rock support consisting of shotcrete and/or rockbolts is installed as required.