Tunnel Excavation At The Bad Creek Project

Society for Mining, Metallurgy & Exploration
Thomas H. Holley
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
737 KB
Publication Date:
Jan 1, 1987

Abstract

This presentation will describe the underground excavation at the Bad Creek Pump Storage project. It consists of approximately 3,650 m of various size tunnels ranging from 4.2 m to 9.0 m finished diameter, a powerhouse cavern 45 m high by 135 m long by 22.5 m wide, and 422 m of 9 m diameter shaft. A total of 350,000 m of rock will be excavated, hauled, and placed in a submerged wier. Temporary rock support consisting of shotcrete and/or rockbolts is installed as required.
Citation

APA: Thomas H. Holley  (1987)  Tunnel Excavation At The Bad Creek Project

MLA: Thomas H. Holley Tunnel Excavation At The Bad Creek Project. Society for Mining, Metallurgy & Exploration, 1987.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account