Tunnel Protection by Ground Improvement Prior to Track Lowering

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 11
- File Size:
- 5752 KB
- Publication Date:
- Jan 1, 2001
Abstract
To accommodate larger double-stack rail cars through a tunnel, the existing active tracks were to be lowered. The tunnel is an elliptical, horseshoe-shape with concrete base support, removal of which would jeopardize the tunnel integrity, particularly since the soils beneath part of the tunnel floor included soft, saturated silt overlying rock. Grouted bar anchors combined with a SuperJet soilcrete strut replaced the existing support in situ prior to floor lowering. Close cooperation and detailed timely engineering support provided a quality project. Project design and construction, ground improvement methods, and the performance of the work are described.
Citation
APA:
(2001) Tunnel Protection by Ground Improvement Prior to Track LoweringMLA: Tunnel Protection by Ground Improvement Prior to Track Lowering. Society for Mining, Metallurgy & Exploration, 2001.