Tunneling At Forest Glen Station Washington, D.C. Metro

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 15
- File Size:
- 559 KB
- Publication Date:
- Jan 1, 1983
Abstract
Key elements to the successful excavation and support of the Forest Glen Station and Tunnels for the Washington Area Metropolitan Transit Authority are discussed. Excavations encompassed a twin-vault station; 2339.3 m (7675 feet) of conventional drill and shoot tunnel; and 810.8 m (2660 feet) of mixed faced tunnel. The use of dewatering, boom type continuous miner and shotcrete in the mixed faced tunnel, along with hydraulic drills, bolts, and shotcrete in the rock tunnels and station proved to be effective methods.
Citation
APA:
(1983) Tunneling At Forest Glen Station Washington, D.C. MetroMLA: Tunneling At Forest Glen Station Washington, D.C. Metro. Society for Mining, Metallurgy & Exploration, 1983.