Tunneling At Forest Glen Station Washington, D.C. Metro

Society for Mining, Metallurgy & Exploration
W. W. Roberts
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
15
File Size:
559 KB
Publication Date:
Jan 1, 1983

Abstract

Key elements to the successful excavation and support of the Forest Glen Station and Tunnels for the Washington Area Metropolitan Transit Authority are discussed. Excavations encompassed a twin-vault station; 2339.3 m (7675 feet) of conventional drill and shoot tunnel; and 810.8 m (2660 feet) of mixed faced tunnel. The use of dewatering, boom type continuous miner and shotcrete in the mixed faced tunnel, along with hydraulic drills, bolts, and shotcrete in the rock tunnels and station proved to be effective methods.
Citation

APA: W. W. Roberts  (1983)  Tunneling At Forest Glen Station Washington, D.C. Metro

MLA: W. W. Roberts Tunneling At Forest Glen Station Washington, D.C. Metro. Society for Mining, Metallurgy & Exploration, 1983.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account