Tunnelling Under The Harlem River

Society for Mining, Metallurgy & Exploration
Jacek B. Stypulkowski
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
1282 KB
Publication Date:

Abstract

This paper discusses the challenges faced by the design team of the under-river crossings of electric transmission feeders in New York City, a densely populated urban area. The under-river crossing of a 345 kV feeder was initially designed as Horizontal Directional Drilling (HDD), but was redesigned as a utility tunnel because of site con¬straints on both sides of the river. Multiple studies addressed location, available tech-nologies and costs. Multiple soil investigation phases addressed design aspects of HDD, as well as tunneling. Contractual issues varied from a design build alternative with Geotechnical Data Report (GDR) to design tender approach with GDR & Geotechnical Baseline Report (GBR).
Citation

APA: Jacek B. Stypulkowski  Tunnelling Under The Harlem River

MLA: Jacek B. Stypulkowski Tunnelling Under The Harlem River. Society for Mining, Metallurgy & Exploration,

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account