Abstract
THE underground haulage system in the lead-silver mine of the-Bunker Hill & Sullivan Co., situated at Kellogg, Idaho, is the most extensive in the Coeur d'Alène district, comprising about 35,000 ft. of tunnels, drifts, and cross-cuts where locomotive haulage is in use. The main working adit, known as the Kellogg tunnel, or No. 9 level, is approximately 10,000 ft. in length from the portal to the main working shaft and extends beyond that about 4,500 ft. in each of two directions. On this level all the ore from the Bunker Hill & Sullivan, the Sierra Nevada Consolidated, and the Caledonia Mining Co. an average of 44,600 tons per month-is hauled to the mills, located a short distance from the portal. Electric haulage by the trolley-type locomotive is used on this level throughout. Below this level, at intervals of 200 ft. vertically, are five other working levels (Nos. 10, 11, 12, 13, and 14); and the total haulage distance on these, where electric locomotives are used, is approximately 16,000 ft. No. 13 level has but recently been opened up and is not working-to capacity; while the main cross-cut on No. 14 has just been started, and has no need of power haulage. Of the four levels equipped with electric haulage, Nos. 11, 12, and 13 have storage-battery locomotives, and No. 10 still retains the trolley type by reason of the small and decreasing tonnage produced.
Citation
APA:
(1915) Underground Haulage By Storage-Battery Locomotives In The Bunker Hill & Sullivan MineMLA: Underground Haulage By Storage-Battery Locomotives In The Bunker Hill & Sullivan Mine. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1915.