Underground Mine Project Development

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 9
- File Size:
- 407 KB
- Publication Date:
- Jan 1, 1983
Abstract
This paper reviews factors involved in the feasibility stage of underground mine project development. Emphasis is placed on the need to first select the best method of extraction and make the most accurate assessment of the expected output even with the uncertainties which may exist in structural interpretation, ground stress, geotechnical factors, and industrial conditions. The subsequent engineering planning should be undertaken from the point of view of the face requirements and is subject to constraints imposed by the method of work and nature of the deposit and, in the case of access, to surface constraints and services.
Citation
APA: (1983) Underground Mine Project Development
MLA: Underground Mine Project Development. The Australasian Institute of Mining and Metallurgy, 1983.