Abstract
Design and construction techniques used to develop two highway tunnels in inaccessible mountainous terrain are described. Measures used to adapt the design to the unusual geology and topography are discussed, as well as measures to adapt the construction methods to available equipment, materials, and skills. Sharp local variations in geoloqic conditions resulted in field modifications to both design and construction techniques. The geology is a volcanic ash and breccia-agglomerate at one site, a jointed andesite at the other, which is also the site of a major landslide. Both rock reinforcement in the form of pretensioned and grouted rock bolts with a shotcrete lining,and rock support by struc- tural steel sets with a reinforced concrete lining were used. A canyonside location and high lateral in-situ stresses required modification of design procedures. Pilot tunnels at both sites resulted in adapting the designs to site conditions with large savings in lining costs, disclosing problem areas in advance of the main excavation, and cushioning of blasting pressure to minimize stability problems.
Citation
APA: (1976) Undersea Tunnel Design with Reference to the Channel Tunnel
MLA: Undersea Tunnel Design with Reference to the Channel Tunnel. The Australasian Institute of Mining and Metallurgy, 1976.