Upgrading the Gravity Circuit at Marvel Loch

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 7
- File Size:
- 434 KB
- Publication Date:
- Jan 1, 2000
Abstract
This paper outlines the design, justification and performance of a gravity circuit upgrade at the Marvel Loch treatment plant. The design of the upgrade was simple but effective. The key components of the upgrade were the addition of a sluice and a second Knelson Concentrator. The sluice was installed as a pre-concentration step. The upgrade also included the purchase of a Mineral Cone to treat the increased quantity of gravity concentrate. The cost was low because of the use of mostly second-hand equipment. The result was that for a cost of $75 000 the gravity recovery doubled and the overall recovery increased by over one per cent. This paper shows that you do not need to spend millions of dollars to be innovative and successful.
Citation
APA:
(2000) Upgrading the Gravity Circuit at Marvel LochMLA: Upgrading the Gravity Circuit at Marvel Loch. The Australasian Institute of Mining and Metallurgy, 2000.