Ventilation Design and Practice at the Olympic Dam Mine, South Australia

The Australasian Institute of Mining and Metallurgy
Clarke B. N
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
800 KB
Publication Date:
Jan 1, 1988

Abstract

The Olympic mine is currently and development to 1988. The mine practice is, and number of factors. Dam copper-uranium-gold undergoing construction start production in May ventilation design and will be determined by a These include: 1. Mining method and degree of mechanization. 2. Presence of radon emanating material. 3. High virgin rock temperatures at relatively shallow depths. 4. High ambient air temperatures in Summer.
Citation

APA: Clarke B. N  (1988)  Ventilation Design and Practice at the Olympic Dam Mine, South Australia

MLA: Clarke B. N Ventilation Design and Practice at the Olympic Dam Mine, South Australia. The Australasian Institute of Mining and Metallurgy, 1988.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account