Vibration Control in a Tunnel Project under an Existing Hospital

- Organization:
- International Society of Explosives Engineers
- Pages:
- 9
- File Size:
- 134 KB
- Publication Date:
- Jan 1, 1997
Abstract
This paper describes a very exacting tunneling project. Planning and technical realization of this service and transportation tunnel was especially difficult as a matter of vibration control, because the tunnel is situated only a few meters under Maria Hospital, which is one of the most busiest hospitals in Helsinki. In this hospital there are many departments for bedpatients, research and treatment with high-tech equipment, operational surgery and a big laboratory. Besides access tunnels are situated near several apartment buildings. The functionality of the tunnel required the placement of the access tunnels to be straight towards these apartment buildings for which special care for blast induced air pressure had to be taken.
Citation
APA:
(1997) Vibration Control in a Tunnel Project under an Existing HospitalMLA: Vibration Control in a Tunnel Project under an Existing Hospital. International Society of Explosives Engineers, 1997.