Wet Heavy Mineral Pilot Plant Design, Assembly, Commissioning And Operation For A Remote Location

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 8
- File Size:
- 1208 KB
- Publication Date:
- Jan 1, 2007
Abstract
Processing confidence for a bankable feasibility study on a green field heavy mineral deposit is inmost cases achieved only through bulk sample processing. Bulk sample is classified as a large enough concentrate sample that is processed into final products to satisfy market sample demand as well as further processing demands such as smelting. In this case study the demand was to produce 500 tons of heavy mineral concentrate from more than 5 000 tons run-of-mine on are mote location with limited to no infrastructure. The various challenges faced and lessons learned are documented as an outcome of the success of this mission.
Citation
APA:
(2007) Wet Heavy Mineral Pilot Plant Design, Assembly, Commissioning And Operation For A Remote LocationMLA: Wet Heavy Mineral Pilot Plant Design, Assembly, Commissioning And Operation For A Remote Location. The Southern African Institute of Mining and Metallurgy, 2007.