Yield Pillar Behavior At Jim Walter No. 7 Mine Stress And Strata Measurements Of Yield And Abutment Pillars

International Conference on Ground Control in Mining
J. Brasfield
Organization:
International Conference on Ground Control in Mining
Pages:
9
File Size:
1714 KB
Publication Date:
Jan 1, 1994

Abstract

Jim Walter Resources, along with the Rock Mechanics Branch of British Coal and Strata Control Technology Pty. Ltd., is presently studying the yield-stable-yield pillar design in use at the Blue Creek No. 7 Mine located in Brookwood, Alabama. This paper describes the steps taken to determine stresses on the strata surrounding the pre-driven development entries. It also describes the installation and monitoring of stress cells and extensometers used to quantify the stress build-up and strata movement associated with the headgate pass of a longwall panel. The findings of this study will be used to design and predict the performance of a 2 entry yield pillar system in the Parkgate Seam at Welbeck Colliery in the United Kingdom. Stress measurements and strata movement data from No. 7 Mine and Welbeck will be used to develop a computer model that can predict the performance of such a pillar system in British mines. Jim Walter Resources will use this data to study the performance of the present yield-stable-yield pillar system in order to determine if conditions will allow the stable pillar width to be decreased while maintaining current standards of safety and production.
Citation

APA: J. Brasfield  (1994)  Yield Pillar Behavior At Jim Walter No. 7 Mine Stress And Strata Measurements Of Yield And Abutment Pillars

MLA: J. Brasfield Yield Pillar Behavior At Jim Walter No. 7 Mine Stress And Strata Measurements Of Yield And Abutment Pillars. International Conference on Ground Control in Mining, 1994.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account