Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mining Geology - Geology of the Zaruma Gold District, EcuadorBy Paul Billingsley
The Asientos-Tepezala district is in the north of the State of Aguasca-lientes, about 30 miles north of the city of Aguascalientes, the capital. The district is reached by a standard-gage railway on t
Jan 1, 1927
-
Utilization Problems of Metallurgical Limestone and DolomiteBy Oliver Bowles
WHILE vast quantities of limestone and dolomite. are used in metallurgy, the estimated production in 1926 being 23,860,000 tons, there are many problems connected with their use which have not receive
Jan 1, 1928
-
San Francisco Paper - Ventilation of the Copper Queen Mine (with Discussion)By Charles A. Mitke
The Copper Queen mine is composed of seven divisions which are operated through the following shafts: The workings of the different shafts are connected by motor-haulage drifts on the even numbered
Jan 1, 1916
-
Medals and Awards (7f9a5266-7d09-4bf5-aa6a-dbafc5439704)FRIENDS of the late Charles F. Rand presented in 1930 a sum of money from which. the income is available to support various phases of the work of the Institute in which Mr. Rand was so deeply interest
Jan 1, 1952
-
Production - Domestic - Oil and Gas Developments in New York for 1939By C. A. Hartnagel
In 1939 the production of crude oil in New York totaled 5,105,000 bbl. This marks the third consecutive year production of crude oil has exceeded 5,000,000 bbl. and only once has this total been surpa
Jan 1, 1940
-
Production - Domestic - Oil and Gas Developments in New York for 1939By C. A. Hartnagel
In 1939 the production of crude oil in New York totaled 5,105,000 bbl. This marks the third consecutive year production of crude oil has exceeded 5,000,000 bbl. and only once has this total been surpa
Jan 1, 1940
-
The History and Legal Phases of the Smoke ProblemBy Ligon Johnson
ONLY the acute phase of the smelter fume problem is new. The problem itself is older than the Christian era. While both lead and copper were mined and crudely smelted ; on: 3,000 years ago, it was no
Jan 5, 1917
-
Papers - Drying and Calcining - Flash Drying and Calcining as Developed from Mill Drying (T. P. 1897, Min. Tech., Sept. 1945)By William B. Senseman
For reasons well known to mining engineers, wet grinding is quite universal in plants having to do with the extraction of metallic values from crude ores. In the processing of the nonmetallic and indu
Jan 1, 1947
-
Papers - Drying and Calcining - Flash Drying and Calcining as Developed from Mill Drying (T. P. 1897, Min. Tech., Sept. 1945)By William B. Senseman
For reasons well known to mining engineers, wet grinding is quite universal in plants having to do with the extraction of metallic values from crude ores. In the processing of the nonmetallic and indu
Jan 1, 1947
-
Institute of Metals Division - Measurement of Dihedral AnglesBy Charles A. Stickels, Edward E. Hucke
The dihedral angle, formed by the intersection of three interfaces, is often determined by measuring a sample of apparent angles of intersection seen on a random plane of polish, then comparing the ex
Jan 1, 1964
-
New York Paper - The Segregation and Classification of the Natural Resources of the Public Domain (with Discussion)By Frederick F. Sharpless
The term "segregation," as here used, means the separation of certain natural resources into groups, consisting of one or more members, with the idea that when thus segregated, each group may be more
Jan 1, 1915
-
Extractive Metallurgy Division - Arc Melting of Titanium MetalBy S. F. Radtke, J. A. Snyder, R. M. Scriver
An automatic, continuous casting arc furnace employing a nonconsum-able electrode and a direct current arc has been constructed and operated successfully for titanium. A comparison of the properties o
Jan 1, 1952
-
Metal Mining - An Analysis of Mine Opening Failure by Means of ModelsBy Bernard York, John J. Reed
Mine opening stability was investigated by loading model openings to failure. Eight-inch plaster blocks were cast with small uniform section openings passing through the centers. After curing, the mod
Jan 1, 1954
-
Cleaning Table Middlings From A Coal Washery With The Humphreys Spiral ConcentratorBy W. M. Bertholf
IN 1945 tests were made in the coal washery of the Colorado Fuel and Iron Corporation, at Pueblo, Colo., to determine the value of the Humphreys spiral. So far we have demonstrated that it is of defin
Jan 1, 1946
-
Simultaneous First and Second Mining on Steep PitchesBy Dever C. Ashmead
COAL companies in the anthracite region are studying various methods of mining that will permit a considerably shorter life of gangway and therefore a decrease in the maintenance charges. Maintenanc
Jan 1, 1925
-
New York Paper - Static and Dynamic Tension Tests on Nickel Steel (with Discussion)By J. J. Thomas, J. H. Nead
This investigation was undertaken to determine, if possible, the relation between static and dynamic tensile tests as measured by the work required to break test specimens slowly, in a tensile testing
Jan 1, 1922
-
New York Paper - Static and Dynamic Tension Tests on Nickel Steel (with Discussion)By J. H. Nead, J. J. Thomas
This investigation was undertaken to determine, if possible, the relation between static and dynamic tensile tests as measured by the work required to break test specimens slowly, in a tensile testing
Jan 1, 1922
-
Mine Drainage at Eureka Gorp. Ltd., Eureka, Nev.By George W. Mitchell
THE property of Eureka Corp. Ltd. is located in the approximate geographic center of Nevada, 2 miles from Eureka, the county seat. The great sources of power, the Colorado, Snake, and Salmon Rivers an
Jan 8, 1953
-
Mining Practice at the Bell Mine Limestone MineBy Samuel Shallcross
THE principal function of the Bell limestone mine, of the American Lime & Stone Co., at Bellefonte, Pa., is to supply raw material to the company's modern rotary kiln plant at Bellefonte. Because
Jan 1, 1936
-
Production Methods At Hiwassee Dam Aggregate Plant (5382f9f4-a95e-4cb7-8c79-3c5de8797d21)By F. Cadena
HIWASSEE Dam, now under construction by the Tennessee Valley Authority on the Hiwassee River, a tributary of the Tennessee River, will require aggregate for approximately 800,000 cu. yd. of concrete.
Jan 1, 1939