Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Skills and Characteristics for Success

    And it takes more than good organisation. You may read or heard this poignant reflection: We tried hard, but it seemed that every time we were beginning to form up in teams we would be reorganised. I

    Jan 1, 1990

  • AUSIMM
    Tailing Thickener Operability and Control Improvements at ProminentáHill

    By J Lombardi, M Weidenbach

    "OZ MineralsÆ Prominent Hill copper-gold concentrator is located 650 km north-east of Adelaide, 130 km north-east of BHP BillitonÆs Olympic Dam operation and 130 km south-east of the regional township

    Oct 29, 2012

  • AUSIMM
    Common Law Damages Claims-Their Implications on Mining Management

    Throughout industry in Australia, time lost through work accidents and illness is three times greater than strikes. In 1978 in New South Wales alone, 400 workers died, 125,000 were injured, 6,000

    Jan 1, 1982

  • AUSIMM
    Accurately estimating heat load from conveyed rock

    By M A. Tuck

    The dominant heat loads in a deep underground mine are the surrounding rock mass, autocompression and machinery. In addition heat can be contributed to by other sources. Many block cave, sublevel cave

    Aug 28, 2017

  • AUSIMM
    Mine productivity and equipment selection impacts with operational grade engineering

    By A F. von Wielligh, M Scott, L Keeney

    Operational Grade Engineering (GE) is the early (pre-processing) discard of low-grade mineralised and/or barren rock to improve the ore grade and/or reduce deleterious elements within the run of mine

    Nov 10, 2020

  • AUSIMM
    Dust Mitigation - Changing the Paradigm

    By J Visser

    Dust mitigation has long been seen as nothing more than managing a nuisance issue, but the reality is that poor dust management can lead to one or more of the following negative consequences: an incre

    Aug 12, 2013

  • AUSIMM
    Reconstruction Project Pechenganickel Combine Metallurgical Operations

    By B Lindqui, M V. Knyazev, L S. Tsemekhman

    Gipronickel Institute JS that is a Research and Development Centre affiliated to the worldclass Norilsk Nickel Mining and Metallurgical Company, and Outokumpu Technologies AB (Boliden Contech AB) have

    Jan 1, 2004

  • AUSIMM
    Oxygenation System Upgrades and Leach Plant Performance Improvements at Morila Gold Mine - 2009 to 2012

    By D M. Verster, P L. Gillot, A Kone

    Randgold ResourcesÆ MorilaÆs gold leach plant is subjected to uncommon æoxygen stressesÆ. Feed ores exhibit very high oxygen demands, primarily caused by iron sulfides. In addition, ore oxygen demand

    Sep 26, 2013

  • AUSIMM
    Justifying Slope Design Risks and Costs

    By N M. Player, R P. Varden, E Jones

    "An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t

    Nov 15, 2016

  • AUSIMM
    Mineral Resource Assessment of the Coromandel Region, New Zealand

    By D N. B Skinner, R L. Brathwaite, M S. Rattenbury

    The Institute of Geological and Nuclear Sciences Ltd has carried out a mineral resource assessment of the Coromandel region, one of the most mineral-rich regions of New Zealand. The assessment focusse

    Jan 1, 2001

  • AUSIMM
    How Particles Stick to Bubbles - The Influence of pH and Hydrophobicity in Flotation

    How Particles Stick to Bubbles - The Influence of pH and Hydrophobicity in Flotation

    Sep 13, 2010

  • AUSIMM
    Phase equilibrium study in the sodium metasilicate primary phase field of PbO-Na2O-SiO2 system between 800 and 1000°C

    By X Ling, M Barati, E Moosavi-Khoonsari

    In the pyrometallurgical process of secondary lead recycling, a desulfurising agent, such as Na2CO3 is added to minimise the emissions of sulfur into the atmosphere, while silica is introduced into th

    Jun 19, 2024

  • AUSIMM
    Flow Sheet Development of Three Geographically Distinct Chromium-Bearing Ores

    Flow Sheet Development of Three Geographically Distinct Chromium-Bearing Ores

    Sep 13, 2010

  • AUSIMM
    Vibration energy harvesting for self-powered sensors at mine sites

    By H Zhang, M Karimi, M Hassan, S Saydam, B Li

    With the prevalence of Mine Internet of Things (MIoT), different types of sensors have been widely deployed in mine sites for environmental monitoring and operational management. Currently, sensors in

    Sep 1, 2024

  • AUSIMM
    Friction bolt performance over the past ten years in Australian mines

    By T M. Nester, D J. Reardon, A N. Page, B J. Barsanti

    The load capacity of a friction bolt has long been regarded as 4 t/m of embedment for ground support design analysis and supported by in situ pull test results. In recent years, the authors have obser

    Nov 29, 2022

  • AUSIMM
    Coal Mine Ventilation and the Law

    By M Parcell

    "Ventilation risks in an underground mine have essentially remained the same for centuries, yet theevidence suggests that there are many coal mines that have failed to adequately control these risks.T

    Jun 1, 2012

  • AUSIMM
    Case Study on the Remediation of a Remote Acid Mine Drainage Site in South Africa With Emphasis on Low Cost Measures and Cost Benefit Assessments

    By N Swiegelaar

    Loubert Witbank is a defunct coal mine situated near Ermelo in South Africa. Mining ceased in 1992, and within a short period acidic decant occurred, with a significant impact on the regional catchmen

    Jan 1, 2003

  • AUSIMM
    The Golden Mile – 125 years of mining and the challenges posed for today’s mine geologist

    By M Watson, A V. Engelbrecht, E Murray-Hayden

    Whereas mine reconciliation is a well-established month-end process for most modern mining operations, the resource sector has yet to endorse uniform reporting factors against which model accuracy and

    Mar 22, 2022

  • AUSIMM
    The Solvent Extraction - Electrowinning Recovery of Zinc from Eskay Creek Pressure Oxidation Solutions Using Cyanex 302 Extractant

    By West-Sells P, King J. A, Patel C

    The Eskay Creek orebody is located in north-central British Columbia (Canada). The ore contains major gold and silver values and minor but economically significant quantities of zinc. The refractory

    Jan 1, 1993

  • AUSIMM
    Speiss Lump Formed at the Bottom of Copper Blast Furnace

    Completing its historical role the opera tion of copper blast furnace of the Saganoseki Smelter was terminated in 1970, but it left some interesting data on metal lumps formed at the furnace bottom

    Jan 1, 1980