Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons Learnt

    By M Weeks

    Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen

    Mar 8, 2011

  • AUSIMM
    Application of a reinforcement learning AI solution for optimisation of screening shuttles control

    By A Horeth, E Duggan, B Versiani, A Gooch

    Iron ore screening plant productivity is strongly affected by the performance of the shuttle operation, with the control system robustness and associated strategies having a direct impact on utilisati

    Nov 8, 2021

  • AUSIMM
    The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs Viewpoint

    By J-P Franzidis, M Esvelt, E V. Manla

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart

    Jan 1, 2003

  • AUSIMM
    Drilling and Blasting Techniques in Shallow Manganese Ore Deposits at Groote Eylandt û Present Performance and Future Outlook

    By Barber J

    The manganese ore of Groote Eylandt is a shallow sedimentary deposit of Cretaceous age. There are a number of deposits which vary greatly in ore texture, density, percentage of matrix and thickness

    Jan 1, 1974

  • AUSIMM
    The Modernisation and Upgradeáof Concentrator Operations at the Chelopech Mine, Bulgaria - Design, Installation and Operation of the 250 tonnes per hour Comminution Circuit

    By K Evtiminova, G Jobson, M Nolte, S Meik

    Chelopech Mining EAD (CMEAD) is a wholly owned subsidiary of Dundee Precious Metals Inc (DPM) and operates the Chelopech underground mine and processing facility located in Bulgaria. The final product

    Oct 29, 2012

  • AUSIMM
    Laboratory Flash Flotation Trends for a Variety of Gold Particles

    By T D. H McGrath, J P. Vaughan, J Heath, J J. Eksteen

    A reliable laboratory method to characterise the response of free gold particles when subjected to flash flotation conditions has been developed by AMIRA P420 researchers at Curtin University. This te

    Sep 26, 2013

  • AUSIMM
    Simulation of Flexible Circuits

    By MáAndrusiewicz, M M. Hilden, M S. Powell, P D. Kay, B Foggiatto

    Circuits with unconventional and potentially more complex designs are predicted to become more common in the future as plant designers and operators look to process ores more efficiently. Ideas have b

    Oct 29, 2012

  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017

  • AUSIMM
    Dry concentration of low-grade magnetic iron ores

    By C S. Kelsey, J R. Kelly

    Australia is presently enjoying the fruits of a booming iron ore market. Expectations are that market strength will be supported in the short to medium term by increasing feedstock demands from steel

    Nov 8, 2021

  • AUSIMM
    Developing Mineral Reporting Competency

    By J Coombes

    The JORC Code lists the three core principles of Transparency, Materiality and Competency as fundamental to how mineral estimates are publicly reported. But where the principles of Transparency and Ma

    Aug 22, 2011

  • AUSIMM
    Trends in Magnetite Ore Processing and Test Work

    By D Yan, D Connelly

    Beneficiation of magnetite is an integral part of the future of iron ore processing. Historically, the focus of Western Australian producers has been on exporting direct shipping ore (DSO) namely haem

    Jan 1, 2009

  • AUSIMM
    Modelling Full-scale Blast Heave with Three-dimensional Distinct Elements and Parallel Processing

    By A Tawadrous, B Wheeler, D S. Preece, S A. Silling

    The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Moving rock with explosives rather than mechanical

    Aug 24, 2015

  • AUSIMM
    Sulfidisation of Ilmenite Concentrates Contaminated with Chrome Spinels – A New Approach to Impurity Separation

    By M I. Pownceby

    High temperature roasting studies on chrome-spinel contaminated ilmenite concentrates showed that sulfur, introduced through a sulfidising roast treatment, selectively reacted with the chromium in the

    Oct 5, 2011

  • AUSIMM
    Elrington Colliery

    By Hindmarsh G

    The colliery is owned by the BHP Collieries Proprietary Ltd., the principal shareholders being the Broken Hill Pty. Company Ltd. and Hebburn Limited.It is situated due west of Newcastle and 6 south-ea

    Jan 1, 1935

  • AUSIMM
    Blast Design Using Measurement While Drilling Parameters

    By M Higgins

    Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio

    Jan 1, 2001

  • AUSIMM
    The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa (ee90997b-915a-4723-962c-df13e11cf8b6)

    By Kuganathan K, Potvin Y

    Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the dee

    Jan 1, 1998

  • AUSIMM
    An approach to the calibration and validation of transfer chute DEM simulations handling cohesive iron ore fines

    By T Walkemeyer, R Elliott, D Chang-Martin

    Over the past decade, discrete element method (DEM) simulations have seen increasing adoption by the resources sector to inform the design of materials handling equipment such as transfer chutes, bins

    Sep 18, 2023

  • AUSIMM
    The Impact of Pile Loading on Adjacent Metro Tunnels – Barangaroo South, Australia

    By P K. Wong, D A. F Oliveira, F M. Azad

    In situations where foundation piles are located in proximity to existing or future tunnels, it is typical for the tunnel owner to require that sleeving of the piles be carried out to at least the inv

    Sep 17, 2014

  • AUSIMM
    Water Flow in Uncovered Waste Rock ù A Multi-Year Large Lysimeter Study

    By L Smith, R Beckie

    An intermediate scale (8 m + 8 m + 5 m high) constructed waste rock pile experiment was built upon a contiguous grid of 16 gravity drainage lysimeters to investigate the flow of water in unsaturated w

    Jan 1, 2003

  • AUSIMM
    The Konongo Gold Project, Ghana – An Example of How Geology Makes All the Difference to a Resource Estimate

    By R Sterk, B Reid

    The Konongo Gold Project is located on the western margin of the 125 Moz Ashanti Gold Belt in Ghana, West Africa. It is situated 60 km along strike of the world-class mineral system at Obuasi and is i

    Aug 18, 2014