Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Development and Operation of a Continuous Tapping Lead Blast Furnace at Port Pirie

    On the 17th November, 1964, a new No., 2 lead blast furnace was blown in at Port Pirie. The furnace departed from previous designs by incorporating a centrally located continuous tapper for both l

    Jan 1, 1975

  • AUSIMM
    Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects

    By S France

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an

    Mar 8, 2011

  • AUSIMM
    Rate of Production and Cutoff Grade-A Program Systems for Teaching and Experimentation

    By Daoust G, Dubois JF

    The optimal sequence of decisions on rates of production and cutoff grades is obtained by a dynamic programming model. The main parameters are : 1. the size of the deposit, average grades and grad

    Jan 1, 1977

  • AUSIMM
    Precast Concrete Segmental Tunnel Linings – The State-of-the-art

    By A Harding, M Chappell

    Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig

    Sep 17, 2014

  • AUSIMM
    Parametric assessment of tailings liquefaction and earthquake induced embankment deformations using FLAC

    By B Ghahreman‐Nejad, M Munro

    Design of embankment dams often requires seismic analyses, or an assessment of earthquakeinduced ground and dam movements. There are a large number of cases where earthquakes have triggered sliding an

    Jul 1, 2021

  • AUSIMM
    Geophysical Techniques Applied to Blasting Design

    By J C. Koppe, L Vieira

    One common problem for blasting in iron ore mines with significant weathering is the occurrence of large blocks of hard rock mixed with softer material. This situation causes a problem for blasting de

    Aug 24, 2015

  • AUSIMM
    Can Australian Coal Alleviate Energy Poverty in India – a Case Study

    By H von Blottnitz, A C. Keith

    The influence of the life of a mine extends beyond its immediate vicinity both in geographic and temporal terms. Decisions around mine approvals are generally made based on economics, for the mine own

    Jun 28, 2016

  • AUSIMM
    Lessons learnt in geotechnical investigation and stability analysis for upstream tailings storage facility raise design

    By C Armstrong, B Wentzinger

    Upstream embankment raises often represent the lowest cost option for increasing the capacity of tailings storage facilities (TSF), but also pose the highest stability risk due to constructing on top

    Jul 23, 2018

  • AUSIMM
    Glass Earth's Greenfields Gold Discovery Strategy Using Multi-Faceted Airborne Geophysical Surveying is Poised to Rewrite the Geology Of Central Otago

    By S Henderson

    The Otago Goldfield has produced approximately 8 million ounces of alluvial gold and over 2.5 million ounces of hard rock gold and is currently home to New ZealandÆs largest producing gold mine. In th

    Jan 1, 2007

  • AUSIMM
    Ventilation Analysis for Mine Planning and Operation

    By Ralph AM, Deakin JJ

    A quantitative knowledge of underground mine ventilation requirements and conditions has become increasingly important, both to meet statutory requirements and to ensure high levels of safety and

    Jan 1, 1983

  • AUSIMM
    Iron RoadÆs Prediction of Magnetite Concentrate Production from the Central Eyre Iron Project

    By P J. Marsh, P J. Bartsch, N J. Semler

    Iron Road Limited is currently studying the feasibility of producing 20 Mt/a of high-grade (67 per cent Fe) magnetite concentrate from a 2.6 Bt resource (JORC) located at Warramboo on the central Eyre

    Aug 12, 2013

  • AUSIMM
    A study of heat and material balances in direct reduction plant with various conditions

    By H Kim, M J. Sun

    Global steel companies are actively combating climate change by reducing carbon emissions. Traditional steel production, using the blast furnace (BF) – basic oxygen furnace (BOF) process, heavily depe

    Aug 21, 2024

  • AUSIMM
    The Taranki Oil-Field

    THE Taranaki oil-field is situated on the western side of the North Island of New Zealand, at about its widest part, and may be said to be the most compact and fertile part of the Dominion, for, with

    Jan 1, 1911

  • AUSIMM
    The O.K.-A Cupreous Pyrite Volcanogenic Massive Sulphide Deposit Formed in a Marginal Sea Setting?

    The O.K. deposit occurs within a belt of cherts and spilitised basic volcanics near the western margin of the Hodgkinson Province. The tabular to lenticular shape and gross conformability of the or

    Jan 1, 1978

  • AUSIMM
    Geology - Paper No. 9 The Reassessment Of Older Mining Fields In N.S.W. Non - Metallics

    The non-metallic minerals, excluding the construc- tions and fuel materials have for long been the "poor relations" of the Mining Industry of New South Wales. The State is self-sufficient in only a

    Jan 1, 1969

  • AUSIMM
    High shear rotor trials in the Mount Isa Mines Copper Concentrator

    By H Law, M Muller

    Mount Isa Mines (MIM) Copper Concentrator currently utilises Agitair 120 banks for its roughing flotation circuit. Apart from a rotor change, the only other significant work completed to the Agitair b

    Aug 29, 2018

  • AUSIMM
    Future Trends in the Technological Revolution of the Japanese Steel Industry

    I am very grateful to have the honor of delivering this Key- note Speech to all of you here today, to the Chairman Mr Cope- man, and to all the organisers. As you heard, I was mainly involved for a v

    Jan 1, 1988

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014

  • AUSIMM
    How Robust Are Your Asset Integrity Management Processes?

    By R Cannings, J Wallace, M McCamley

    The mining industry continues to have major disasters (Bingham Canyon, Pike River, Upper Big Branch, Mount Polley and Samarco), which often have a devastating effect on the enterprise, in terms of per

    Jun 22, 2016

  • AUSIMM
    SBRE framework – application to Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    This paper describes the application of the SBRE framework to model the Olympic Dam deposit, one of the largest copper and uranium deposits in the world. Geostatistical simulations are the best practi

    May 24, 2023