  • AUSIMM
    Eight years of ACARP research on rehabilitation of challenging mine sites – practical application in the era PCRPs

    By L McCallum, G Dale, B Silverwood, T Roscoe, A Costin

    The introduction of Progressive Closure and Rehabilitation Plans (PCRPs) in Queensland from 2019 places greater importance on planning and implementation of mine rehabilitation activities. The progres

    Aug 2, 2023

  • AUSIMM
    Adopting Quality Systems to Train Blast Crews and Control the Use of Explosives at Gunpowder Copper

    While, in the past, a great deal of attention has been focussed on technical issues and the performance of explosives in rock, the explosive user, an essential link in the chain, has often been negl

    Jan 1, 1995

  • AUSIMM
    Solving the Problems of Precharging Sublevel Caving Rings at Ridgeway Gold Mine

    By P Trout, B Macaulay

    Ridgeway Gold Mine (RGM) is an underground sublevel caving (SLC) operation that is owned and managed by Newcrest Mining Limited (NML). Production drill and blast practices are critical to the success

    Jan 1, 2005

  • AUSIMM
    IsaMill™ Design Improvements and Operational Performance at Anglo Platinum

    By C Rule

    In 2003, Anglo Platinum, in a joint development with Xstrata Technology, installed the world’s first 10 000 litre IsaMillTM in a concentrate regrind duty at the Western Limb Tailings Re-treatment Plan

    Aug 8, 2011

  • AUSIMM
    The challenges of removing sulfur from magnetite ores to meet direct reduction specifications

    By D Connelly

    Magnetite ores can be used to produce very high-grade concentrates that are suitable feed for the direct reduction process route but the high sulfur content of some concentrates can cause substantial

    Sep 18, 2023

  • AUSIMM
    Ball Mill Poly-Met Liner Evaluation at PT Newmont Nusa Tenggara – Batu Hijau Mine

    By G Pasin, F Wirfiyata, G Khomaeni, W Valery, A Maclean, A Jankovic

    The grinding circuit at PT Newmont Nusa Tenggara (PTNNT) – Batu Hijau mine consists of two SABC (semi-autogenous milling, ball milling, pebble crushing) trains, including four 20'?×?33'6? ball mills t

    Sep 1, 2014

  • AUSIMM
    A preliminary benchmarking numerical modelling exercise for tailings‐flow runout analysis

    By S Liu, N M. Rana, A Take, N Ghahramani, D Clohan, S McDougall, S G. Evans, H J. Chen

    Tailings dam breaches have caused significant life loss, social, economic and environmental damage in recent years. The term "tailings-flow" refers to various forms of tailings outflow movement result

    Jul 1, 2021

  • AUSIMM
    Design and Specification of Permanent Shotcrete Tunnel Linings

    By D Mather

    Fibre reinforced shotcrete has long been accepted as temporary ground support in both mining and civil tunnel linings. Greater knowledge and understanding of shotcrete as an engineering material and a

    Mar 8, 2011

  • AUSIMM
    Orepass Monitoring and Management at Olympic Dam Mine

    By J Rose, D O’Toole, D Grant

    Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed

    May 9, 2016

  • AUSIMM
    Productivity Enhancement Driver Assistance for Mining Machinery Based on Unique Two-Dimensional Radar Sensor Fusion Concept

    By C Augustin, M Hahn, K Nienhaus

    Operators of mining machinery like haul trucks or excavators have very limited information about the exact distance to other equipment as well as to the natural boundaries like berms, walls and struct

    Sep 26, 2011

  • AUSIMM
    Using Electronic Detonators to Improve Fragmentation, Diggability and Crusher Throughput

    This paper reports on the field results of using electronic detonators to improve blast outcomes. OricaÆs electronic detonator, the i-konTM Digital Energy Control System, allows exact and precise timi

    Jan 1, 2003

  • AUSIMM
    Unlocking value chain optimisation with a digital mining system

    By S Gulati, N Sarkar, T Vink, S Battersby, L Okada

    This paper examines a successful project implemented by BHP Mitsubishi Alliance (BMA) and the Polymathian team at Deswik, aimed at enhancing short-term scheduling processes to reduce vessel turn times

    Sep 1, 2024

  • AUSIMM
    Catalysing lower-carbon mining supply in Australia

    By M Rea, E O’Connell

    Decarbonising explosives manufacturing and catalysing low-carbon mining supply is a significant global challenge. Low-carbon manufacturing precincts – clusters of geographically close businesses acros

    Sep 1, 2024

  • AUSIMM
    Depositional Behaviour of Coal Tailings, Co-Disposed Coal Washery Wastes, and Loose-Dumped Coarse Reject (AuslMM '98 - The Mining Cycle)

    By D J Williams

    Coal washery wastes comprise tailings, finer than 0.5 to 0.1 inn depending on the sophistication of the washery, and coarse reject, typically finer than 50 mm. Subaerial disposal of coal tailings sl

    Jan 1, 1998

  • AUSIMM
    Secondary Copper Processing using Outotec Ausmelt TSL Technology

    By J Wood

    Steady depletion of the world’s primary copper reserves coupled with a meteoric rise in electronic waste (e-waste) generation has led to secondary copper processing assuming an ever-increasing importa

    Aug 8, 2011

  • AUSIMM
    The Geomorphology of the Channel Iron Deposit in Bungaroo Valley - The Formation of an Irregular Basal Topography and its Impacts on Resource Recovery

    By L Terrusi

    The Bungaroo Valley hosts a concealed Tertiary channel iron deposit (CID) along a 17 km stretch of its length. Bungaroo Valley is approximately 0.5 km wide upstream at its easternmost extent, and 3.5

    Jan 1, 2007

  • AUSIMM
    The Application of Heavy-Media Separation and Static Dry Cleaning of Coal at the Broken Hill Pty. Co. Ltd. Steelworks, Newcastle

    By Martin C. H, Met B

    INDEX OF CONTENTS:1. Introduction, Explanatory; and Reasons for Coal Cleaning.2. Principles on which Coal Cleaning is based.3. Location of Broken Hill Proprietary Co. Ltd. Plant.4. Description of Proc

    Jan 1, 1946

  • AUSIMM
    Prediction of Longwall Support Loading at Southern Colliery, Queensland

    By McNabb KE, Ward B, Dyer G

    Roof conditions at Southern Colliery, the second longwall mine to be established at German Creek, were found to be much stronger and more massive than at the earlier longwall mine on the lease. In

    Jan 1, 1992

  • AUSIMM
    Stable Isotope Relationships in Epithermal Gold Deposits, Queensland

    By Wilson AF

    Gold-silver mineralization at Cracow and Ukalunda in Queensland comprise quartz-filled veins, fissures and breccia zones hosted by propylitically altered volcanics and epizonal intrusions which are st

    Jan 1, 1984

  • AUSIMM
    Data Mining Mining Data - Ordered Vector Quantisation and Examples of its Application to MIne Geotechnical Data Sets

    By B L. Dickson, E, M F. Lee, P A. Mikula

    Computational techniques are needed to assist in the analysis and interpretation of the increasing amounts of geoscientific and mining related data and information that are routinely gathered at mine

    Jan 1, 2006