Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The dynamic behaviour of the load in a pilot ball mill as a function of axial position and design and operating variables

    By Montini A

    The dynamic behaviour of the load in a pilot-scale ball mill has been measured as a function of axial position within the mill, end plate lifter design, load volume J (percent of mill volume), per

    Jan 1, 1986

  • AUSIMM
    Evolution of rock fill consolidation at Pajingo Gold Mine

    By J Carswell, K McTyer

    The Pajingo gold operation in Queensland is approximately 50 kilometres south of Charters Towers and 134km south-west of Townsville. The resource was discovered in 1983 and first open pit gold product

    Nov 30, 2018

  • AUSIMM
    Case Study of Iron Ore Value Chain Optimisation

    By J Foo, T Kleinschmidt, B Reynolds, K Kennewell

    The consideration of complex supply chains often highlights multiple system bottlenecks that are localised and dynamic – they shift depending on what variability last influenced the system. Using the

    Jul 13, 2015

  • AUSIMM
    Cooling on demand – the next step in ventilation automation

    By F C. D Michelin

    As mines get deeper, the critical underground temperature limits will be exceeded, and an increasing number of mines will need to implement, expand or modify cooling systems. Surface cooling plants ha

    Oct 12, 2022

  • AUSIMM
    A Note on Kitaev et al Fomulation of the Gas Flow with Tuyere Wind Entry

    By Propster M, Choudhry M

    THIS note gives comments on the paper by Kitaev et al on p. 68 of this book and compares results with those obtained by ourselves. We wish to say that the authors are to be congratulated on their s

    Jan 1, 1975

  • AUSIMM
    Sampling û Current Practices and Challenges

    There are many different challenges when sampling mineral commodities. Sampling is part of many decision-making processes, from control of the number of drops of a reagent to all aspects involved in d

    Jan 1, 2008

  • AUSIMM
    The Effect of Weak Acid Dissociable Cyanide on Gold and Silver Flotation in Hidden Valley Mine

    By Y Peng, B Guo

    In gold processing plants, the water from the cyanidation stages is treated to detoxify cyanide species and this recycle water becomes the main part of the process water. Despite the low concentration

    Sep 26, 2013

  • AUSIMM
    Trigger Action Response Plans for Diesel Exhaust Exposures

    By J Jeffery, P G. Knott, F Velge, C Evans

    A trigger action response plan (TARP) provides a structured response to escalating levels of risk. In mining, TARPs are typically applied to primary hazards such as inrush, strata failure or heating.

    Aug 31, 2015

  • AUSIMM
    Geotechnical Management at the AGL Loy Yang Mine

    By S Cyphers, J Missen, B Jansen

    The AGL Loy Yang Mine is one of the largest and most significant coalmines in Australia. Commencing in 1982, this mine produces 30–35 Mt/a to supply more than 50 per cent of Victoria’s electrical powe

    Nov 5, 2014

  • AUSIMM
    Presentation of the Presidents Award, 1976 to Elliott Sylvester Timothy O'Driscoll

    ADDRESS BY THE PRESIDENT OF THE INSTITUTE (MR. J. G. SYMONS) IN PRESENTING THE AWARD TO ELLIOTT SYLVESTER TIMOTHY O'DRISCOLLTim O'Driscoll comes from a mixture of Irish and Scottish stock. H

    Jan 1, 1977

  • AUSIMM
    Using Quantile Regression in Cloud Transform Simulation

    The cloud transform simulation is a technique used to generate realisations of correlated attributes. The principle of this technique is to partition the scatter diagram between the input attributes i

    Sep 26, 2011

  • AUSIMM
    Intelligent Mine Technology Program and its Implementation

    By P SSrkkS

    Mining is commonly seen as a typical basic industry with rough and even dangerous working conditions, heavy environmental load, and a low level of high-technology and automation with much manual work

    Jan 1, 2000

  • AUSIMM
    Life cycle GHG emission considerations in overland conveyor design

    By T Hicks

    Designers of mining facilities play a significant role in defining the overall mine greenhouse gas emissions performance. This demands an appreciation of all the greenhouse gas emissions sources, incl

    Sep 1, 2024

  • AUSIMM
    Production Variance Benchmarks and Their Use in Project Evaluation and Due Diligence

    "Cash flow modelling during project evaluation is enhanced when probabilistic methods are applied to the inputs. One of the important inputs is the quarterly production profile. Typically, the steady-

    Mar 8, 2016

  • AUSIMM
    Dynamic Displacements from a Blast-triggered Seismic Event

    By D P. Blair

    Various analysis techniques are used to determine the nature of a large seismic event that was triggered by a mass blast in an underground mine. This event was recorded by surface accelerometer arrays

    Aug 24, 2015

  • AUSIMM
    Improved Recovery in Highwall Mining using Backfill ACARP Project C3052

    By G K. Searle

    In Australia, coal mines have generally not adopted filling to increase mining recovery. The aim of this project, entitled æImproved recovery in highwall mining using backfillÆ, was to examine the fea

    Jan 1, 1998

  • AUSIMM
    An assessment of the rate of construction of an upstream raised tailings dam

    By J J. Moreno, J Willis, P Garvey

    Many of the tailings storage facilities (TSFs) in Australia are upstream raised facilities for which the consolidation of the hydraulically deposited tailings is essential to the stability of the TSF.

    Jul 1, 2021

  • AUSIMM
    A New Approach to Mining Research in Canada

    By A Galley, M Plouffe, T Hynes

    Canadian mining research has recently been reinvigorated through a pan-Canadian research strategy driven by the industry, the research community and government departments. These organisations have co

    Jul 10, 2012

  • AUSIMM
    The Effects of Considering the Spatial Bulk Density Variability in Mineral Resources and Reserves

    By J F. C L Costa, J C. Koppe, C Diedrich

    Currently mineral resources evaluation is firstly expressed in terms of volume. Next the resources are transformed into tonnes by using an average bulk density applied to the whole deposit or, in some

    Sep 26, 2011

  • AUSIMM
    Optimisation of Slope Angles at Rosario Mine, Collahuasi

    By A R. Bonani, M P. Pe±a

    The optimisation of slope angles, that is to say, increasing them, compared to the original design is always the subject of analysis of stability for geotechnical engineers and economic analysis for p

    Jan 1, 2007