Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Dynamic grade control modelling processes at the Waihi Underground Gold Mine

    By A Whaanga, W Vigor-Brown

    IGO Ltd’s (IGO’s) Nova-Bollinger Deposit (Nova-Bollinger) is a magmatic nickel-copper-cobalt (NiCu-Co) sulfide deposit found 160 km east-north-east of the town of Norseman in Western Australia (WA). T

    Mar 22, 2022

  • AUSIMM
    Active explosion barrier conformance to the Australian Recognised Standard 21 – a total mine solution

    By A Späth

    Active explosion barriers are used to contain and suppress a methane gas and/or coal dust explosion propagation, including localised mine fires. Early research indicated that these active explosion ba

    Oct 12, 2022

  • AUSIMM
    Alternative Access, Mining and Hoisting for Underground Deposits

    It is proposed to consider a new access, mining and hoisting system for underground deposits, as an alternative to the commonly used decline or vertical shaft access. The proposed system offers fundam

    Jan 1, 2000

  • AUSIMM
    Management' as Presented to Engineering Students

    Currently all engineering schools face a common problem, an ever expanding technological base which must be presented to students within a fixed time period. Traditionally the programmes of study

    Jan 1, 1980

  • AUSIMM
    Improving Open Stope Productivity at Sunrise Dam

    By K Guilfoyle

    AngloGold Ashanti Australia Ltd operates an underground mine below a large open pit at the Sunrise Dam Gold Mine near Laverton in Western Australia. Operations are based on an extensive mineralised zo

    Nov 8, 2011

  • AUSIMM
    Breakthrough in elliptical motion screen trial delivers significant performance

    By D Teyhan, J Kirsch

    Traditionally, most Australian iron ore mining operations have been surface-based. Processing plants were designed to handle dry ores. In recent years mining operations in the Pilbara have progressive

    Aug 24, 2022

  • AUSIMM
    New Discrete Element Modelling Calibration Technology to Facilitate the Increased Efficiency of Ore Handling and Processing Operations

    By P W. Wypych, D Curry, A P. Grima

    The market has become highly competitive for engineering and equipment vendors, who are challenged to reduce costs while improving efficiency and productivity of mine operations through plant improvem

    Jul 13, 2015

  • AUSIMM
    Coarse processing of South African banded iron formation (BIF)

    By N Maistry, C Carelse, A Singh

    Banded Iron Formations or more commonly known as BIF are sedimentary rock formations with alternating silica-rich layers and iron-rich layers that are mainly composed of iron oxides (hematite and magn

    Sep 18, 2023

  • AUSIMM
    Concentrator design – standard engineering practice versus geometallurgy and simulation

    By G Harbort, K Quan

    Traditional engineering practice for concentrator design uses a mixture of risk minimisation options and capital minimisation approaches. Often this is based on the preferences and experiences of the

    Sep 11, 2017

  • AUSIMM
    Reconciliation of Orebody Model Predictions – System and People

    By T Burns, P Savory

    In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data

    Aug 18, 2014

  • AUSIMM
    Real-Time Image Analysis of Iron Ore Cores and Drill Chips to Complement Spectral Measures

    By T Belligoi

    Diamond cores and drill chips provide the only direct physical evidence for ore containing rocks. Early characterisation of cores and drill chips is important as it provides critical information for d

    Jul 11, 2011

  • AUSIMM
    Social responsibility solutions provided by WebGen™ wireless initiation system in open cut mines

    By L Muñoz, L Steffen, W Vilas Boas, G Gontijo, R Macedo, C Braga, d D Machado, G Stevenson

    Mines operating close to communities face growing challenges, especially with their drilling and blasting activities. Proper management of environmental and community impacts is critical to provide su

    Sep 1, 2024

  • AUSIMM
    Maldon to Dombarton Rail Link – Design Development of the Avon Tunnel

    By A Bagis, T Baker

    In 1983 the New South Wales (NSW) Government began to construct a 35 km freight rail line to provide additional rail capacity to Port Kembla in the Illawarra region, south of Sydney, through a direct

    Sep 17, 2014

  • AUSIMM
    Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, Indonesia

    By H Indirawati, R Ayres, A Nur Kasnanto, S Konopa

    As a project moves through the mine life cycle, the quantity of data available increases and the understanding of the orebody matures. Incorporating new information quickly and efficiently in current

    Nov 21, 2018

  • AUSIMM
    Project Evaluation – A Non-Executive Director’s Perspective

    By R Knight

    "In project evaluation there are two matters of keen interest to non-executive directors: the process by which an investment recommendation is reached, as well as the investment itself, as presented.

    Mar 8, 2016

  • AUSIMM
    What is Relative about Energy?

    By A Scott, A C. Torrance

    Explosive properties are typically summarised on manufacturers’ technical data sheets. The values most commonly referred to are the density of the explosive, the energy it is expected to release and i

    Aug 24, 2015

  • AUSIMM
    Modelling Blast Movement for Grade Control at an Open Cut Gold Mine

    By E J. Sellers, A Cocker

    Movement of the fragmented rock mass is an inevitable consequence of open cut blasting. Uncontrolled, unaccounted movement from blasting commonly causes ore loss and dilution from waste mixing. Theref

    Aug 18, 2014

  • AUSIMM
    Deformation Mechanisms of the South West Rail Link Underpass beneath the Hume Highway

    By S J. Clarke, C S. Walker

    The South West Rail Link (SWRL) project involved construction of a rail line to service new residential areas in south-west Sydney. The 11 km rail line is conveyed through a short tunnel at shallow de

    Sep 17, 2014

  • AUSIMM
    Environmental Impact Modelling for In Situ Leaching of Uranium

    By A Roshal

    It is anticipated that many future uranium mines in Australia will be using the in situ leaching mining process. It is fair to say that close to one third of uranium production will be generated by th

    Jan 1, 2008

  • AUSIMM
    Innovative Approaches to ‘Wicked’ Problems – Resource Development and Communities in Western Australia’s Mid West

    By A Buckley

    Many policy issues facing the mining industry and affected communities are at a level of complexity that they can be called ‘wicked’ problems. The term ‘wicked’ in this context is used, not in the sen

    Nov 22, 2011