Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Embedding Geometallurgy into Mine Planning Practices – Practical Examples at Olympic DamBy H Bruyn, K Ehrig, V Liebezeit, A Robertson, M Smith, D Grant
"The Olympic Dam geometallurgy program has generated a large quantity of data that has been used to create a geometallurgically enabled block model. An ongoing challenge is to convert data into usable
Jun 15, 2016
-
Carrapateena Crows Foot Level Layout – Safety in design to support sub level cave production efficiency and automationBy A Mooney, J Marsden, H Grosser, G Dunstan
Carrapateena is a copper-gold deposit hosted in a brecciated granite complex, located 500km North of Adelaide, South Australia. The deposit is being mined using the Sub Level Caving (SLC) Mining metho
Mar 15, 2021
-
Evaluation of the Blue Cube MQi Slurry Analyser for Application in an Advanced Control System for the Optimisation of a Gold Sulfide Flotation CircuitBy D van der Spuy, T Kewe, K Keet, N Moffatt, A P. Paine
The Blue Cube Mineral Quantifier Inline (MQi) instrument uses reflective light spectroscopy and advanced chemometrics to measure mineral or elemental grade in a slurry line. The instrument takes scans
Sep 1, 2014
-
State-of-the-Art in Tunnel Ventilation Systems Design – Applicable Options to Meet Fire-Life-Safety Code RequirementsBy P C. Miclea
Transportation networks extend every day around the world, requiring safe and well-maintained structures for efficiency and for users’ safety. Due to specific features of the infrastructure, such as l
Mar 8, 2011
-
An evolution of drill hole spacing studies at Newmont CorporationBy A Jewbali, L Allen
At Newmont Corporation drill hole spacing studies are done to support the business in understanding the cost of collecting additional information (with a specific focus on drill hole sampling density)
May 24, 2023
-
The integration of mine-to-mill and grade engineering at Anglo American’s Los Bronces Mine using IESBy J Rutter, E Amini, D La Rosa, N Beaton, M Scott, F Faramarz, L Keeney
Anglo American’s Los Bronces copper mine in Chile has been conducting detailed assessments investigating value adding options for their asset. The mine has conducted several detailed Mine-to- Mill and
Nov 10, 2020
-
Using SAP Business Objects to Deliver Actionable Information for Operators to ManagementReal-time data collection and plant historians are becoming common place in mining and processing plants. This vast quantity of data must be turned into easily accessible and actionable information fo
Sep 26, 2011
-
Design and Construction of Sydney’s South West Rail Link Hume Highway UnderpassBy B Chapman, R Nievergelt, J Hill
A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume
Sep 17, 2014
-
Managing Geological Complexity - Beta Hunt Mine, Kambalda, Western AustraliaBy K P. Crameri
The Beta Hunt orebody is situated on the south western limb of the Kambalda dome. It is one of the nickel occurrences in the area which fall into the category of æKambalda Style OrebodiesÆ. These oreb
Jan 1, 2006
-
Design, Inspection and Rehabilitation of the New Croton Aqueduct, New York CityBy A Fareth
Constructed between 1885 and 1891, the New Croton Aqueduct (NCA) in New York State is a 50 km long (31 mi) brick-lined tunnel conveying water from the Croton watershed north of New York City to distri
Jan 1, 2008
-
Transforming dust control – lessons from tunnellingBy A De, B Palmer, rade, P Stowasser, A Fanning
Mining and tunnelling share many commonalities (eg confined working environments, excavation equipment and processes), but of significance is an overarching commitment to provide safe work conditions
Apr 16, 2024
-
Coarse Liberation and Recovery of Free Gold and Gold Sulfide Carriers for Energy Reduction in Process PlantsBy M Davies, G Theletsane, A H. Gray
Recovery of gold from gold ores has been driven by the available technology and its configuration in the process plant flow sheet.Conventional practice in test work programs has the ore being ground f
Sep 1, 2014
-
Liberated 0 - 10 ¦m Particles From Sulfide Ores, Their Production and Separation ù Recent Developments and Future NeedsThe general types of industrial behaviour of liberated valuable sulfide minerals in the 0 - 10 ¦m size fraction are described and tests to explore on site at a concentrator the general nature of any d
Jan 1, 2005
-
CHPP waste pumped co‐disposal – some myths and truthsBy S J. Henderson
Pumped co-disposal of coal processing waste was promoted in the 1990-2000s as a low-cost highperformance alternative to tailings dams. In particular it would avoid high up-front capital for rejects tr
Jul 1, 2021
-
Receiving Environment Monitoring Programs - Making the Most out of Biological Indicators and Direct Toxicity Assessments for Monitoring of Aquatic EcosystemsBy L Thorburn
In 2009, the Queensland Government developed a series of amendments to environmental authorities (EAs) for mines throughout the Fitzroy Basin in response to studies that assessed the cumulative impact
Nov 26, 2013
-
The Benefits of Using SmartEar™at Pueblo ViejoBy D Shuen, R Sales, D La Rosa
Semi-autogenous grinding (SAG) mill control is complex and depends on many dynamic process variables. Good control strategies ensure that a mill is operating as close to optimal as possible, resulting
Sep 1, 2014
-
Environmental Leaching - Predicting Real Long-Term Site-Specific Leaching PerformanceEnvironmental leaching methods such as the toxicity characteristic leaching procedure (TCLP) test or the ASLP test are used to assess wastes including mining and mineral processing by-products. These
Jun 1, 2010
-
Unlocking resource confidence in coal through use of conditional simulationBy B Haase, R Saha
Conditional simulation (CS) has been extensively used in metal industry to assess uncertainty of geo metallurgical variables to build robust distributions around grade tonnages across different time h
Mar 22, 2022
-
Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted AnnulusBy M Norbert, P Mok
The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double
Sep 17, 2014
-
Spatial distribution of geohazards in Western Australia and Imposed risks to tailings storage facility inventoryBy J Penman, N Turner, H Liu
This paper aims to present a snapshot of the risk profile for tailings storage facilities within Western Australia by comparing the spatial distribution of known facilities against common geohazards s
Jul 1, 2021