Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Blasting Harmonics and Controlling Peak Particle Velocity

    By T J. Laing, A B. Richards, A J. Moore

    Blastholes fired in a pattern with a constant initiation delay create a frequency in the ground vibration similar to that from a percussion instrument, such as a drum, in the air. A constant firing de

    Aug 24, 2015

  • AUSIMM
    Analysis of Twin Road Tunnels Using Numerical Modelling Techniques

    By D R. Wines

    The design of near-surface civil infrastructure requires detailed consideration of the geological/ geotechnical conditions, excavation geometry and sequence and ground support measures to ensure stabi

    Mar 8, 2011

  • AUSIMM
    Introducing and Sustaining a Continuous Improvement Program in Mines and Smelters

    By M Costa, L Polizzi

    Process optimisation and continuous improvement are usually acknowledged when making a process more effective, efficient and transparent. During the last few decades, thousands of companies around the

    Sep 1, 2014

  • AUSIMM
    The Primary Framework for the Mechanism of the Mine Reclamation Monitoring in China

    By Y Zhou, Y Liu, J-P Yang, P Wang, K Hu

    "Large-scale mine reclamation has taken place recently in response to the implementation of mining regulations in China. Effective monitoring of the progress of reclaimed land is a critical procedure

    Jul 10, 2012

  • AUSIMM
    Mine to Mill Reconciliation - Three Case Studies

    By J T. Carswell, N A. Schofield

    Fluctuations in periodic reconciliations between the mine and the mill are an expected and common experience in mining and processing operations. These fluctuations are caused in part by errors in the

    Nov 20, 2012

  • AUSIMM
    Back analysis of pit slope performance in a saturated alluvial sediment

    By J Player, G Sweby

    The material properties and hence performance of saturated alluvial sediments slope can be incorrectly forecast if the water content is not preserved, and materials properties not correctly determined

    Jun 22, 2022

  • AUSIMM
    The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave

    By A Coelho, D Bruce, H Grosser, C Parken, M Xia

    Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank

    Mar 15, 2021

  • AUSIMM
    Sustainability in New Projects - Achieving Outcomes Which are Beyond 'Business as Usual'

    Many mining companies aim to integrate sustainability principles into their new projects. There is an intention for improvement, but frequently this results in little more than 'business as usual

    Jun 1, 2010

  • AUSIMM
    "Comprehensive Mineralogical Characterisation at the Cerro Corona Cu-Au Porphyry Mine – the Fundamental Key for Geometallurgical Applications"

    By P Gomez, R Baumgartner, G Escobar

    "The Cerro Corona mine consists of a Cu-Au porphyry deposit located in the Andes of northern Peru. The deposit comprises a typical Cu-Au multiphase porphyry mineralisation that has been overprinted by

    Jun 15, 2016

  • AUSIMM
    Roof Control (7dd78a96-4f18-4459-8ee3-ed9927f2bb10)

    By Dawes S

    Efficient roof control in colliery operation is a factor that must be maintained for· the maximum reQovery and economic extraction of the mineral. It must be carefully considered in each of the f

    Jan 1, 1947

  • AUSIMM
    Sensors and Systems for the Measurement of Tunnel Movements During and After Construction

    By W Ward, J Clegg, R Barnes, T Zhong

    This paper provides an overview of methods for measuring tunnel deflection and construction’s effects on the surrounding environment during and post construction. It will also review illustrative case

    Sep 17, 2014

  • AUSIMM
    Concept Design of the Central Business District Rail Link, Auckland

    By J Q. Cooper

    The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing

    Mar 8, 2011

  • AUSIMM
    Exploration advances – MinEx CRC’s mission

    By D Giles, A C. Bailey

    In the first 20 years of the 21st century, just over 20 per cent of Australian mineral exploration expenditure was dedicated to iron ore, totalling >A$8 billion and >30 million metres of drilling (Aus

    Nov 8, 2021

  • AUSIMM
    Stratiform Lead-Zinc Mineralization in the Kuridala Formation and Soldiers Cap Group, Mt Isa Block, NW Queensland

    By Stanton RL

    Stratiform lead-zinc mineralization in the Soldiers Cap Group and Kuridala Formation of the Mount Isa Inlier is closely associated with iron-rich sedimentary units or "iron formation", and has man

    Jan 1, 1984

  • AUSIMM
    Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling Environment

    By E Corpuz, J Weissman, S Winter, R Evans

    The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli

    Aug 31, 2015

  • AUSIMM
    Cyanide Code Recertification - The Three-Year Challenge

    By R J. Beazley, M C. Woods

    "The International Cyanide Management Code (the Code) is a voluntary industry program for gold miners and associated cyanide transporters and cyanide producers. By becoming a signatory, a company comm

    Sep 26, 2013

  • AUSIMM
    Basicity of Metallurgical Slags (df15b5da-1878-4c59-91a1-a31e398aa14d)

    By Y Yang

    Despite the importance and usefulness of basicity in metallurgical slags, the optimum quantitative expression of it has remained elusive, partly due to the fact that the precise concept of basicity ha

    Jan 1, 2000

  • AUSIMM
    Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia

    By T J. Sullivan, H Pinkster, G Swarbrick

    From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o

    Nov 5, 2014

  • AUSIMM
    Ilmenite Beneficiation by Roasting and Magnetic Separation

    By J P. van Dyk

    A new crude ilmenite beneficiation process was recently proposed that allowed for the preparation of a smelter grade ilmenite from ilmenite with elevated chromium content. Magnetising roasting was not

    Jan 1, 2001

  • AUSIMM
    The Domains Concept – 20 Years on Retrospective, Obstacles and Opportunities for Effective Life-of-Mine Implementation

    By B E. McCarthy

    Red Dome Mine was a highly complex gold copper operation developed over a number of phases between mid-1986 to October 1997. With only three years of production ahead at any time, a proactive practica

    Jul 16, 2014