Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil Dump

    By R Van Laeren, G Langerak, S Fityus, K Koosmen

    Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal

    Jul 27, 2015

  • AUSIMM
    Risk assessment of iron mineral resources using conditional simulations

    By W Patton

    Investment decisions in the mineral resources sector are made on the basis of an assessment of the economic potential for a mineral deposit. Given the supporting information for the location, scale, a

    May 24, 2023

  • AUSIMM
    Recovery Improvement Project for the Ridgeway Concentrator at Newcrest's Cadia Valley Operations

    By F Cesnik

    The past few years has seen a concerted effort to improve the recovery of gold along with its co-product copper from the æhigh-gradeÆ Ridgeway concentrator at Newcrest Mining LtdÆs Cadia Valley Operat

    Jan 1, 2007

  • AUSIMM
    The Introduction of Axis at Black Star Open Cut

    By M Gabbitus, B Young, T Lukins, M Slater

    This paper details the implementation of a new type of grade control system at the Black Star open cut mine in Mount Isa, Queensland. It explores the site requirements for grade control, what as previ

    Sep 18, 2012

  • AUSIMM
    Using technology to support best practice for tailings storage facilities (TSF) management, governance and disclosure

    By H Arvidson, A Walker, N Pollock

    Following the recent tailings tragedy in Brumadinho, the Investor Mining and Tailings Safety Initiative was formed representing institutional investors in the mining industry. This Initiative, led by

    Jul 1, 2021

  • AUSIMM
    Long-Term Water Management - The Forgotten Legacy of Mine Closure

    By G Byrne

    Long-term water management is typically ignored in mine closure planning. A review of 73 mine closure plans dating from 2007 to 2013 shows that, on average, relinquishment is proposed to be achieved i

    Nov 26, 2013

  • AUSIMM
    Tunnel Design in an Alliance for Waterview Connection, New Zealand

    By D Maconochie, S Pradhan, M Reed

    The Waterview Connection will provide a high-quality strategic alternative to State Highway One and complete Auckland’s Western Ring Route connecting State Highways 20 and 16. The project includes twi

    Sep 17, 2014

  • AUSIMM
    Sulfide Flotation at the Renison Tin Concentrator, Tasmania

    By Grano S. R, Kilgariff B

    The Renisun Tin concentrator treats an ore containing I's per cent till as cassiterite and 22 per cent sulphur in a range of sulphide minerals. predominantly pyrrhotite. The sulphide minerals a

    Jan 1, 1997

  • AUSIMM
    Geometallurgical Modelling of the Dumont Deposit

    By M Sciortino, J Korczak, J Muinonen, A St-Jean

    The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir

    Sep 29, 2013

  • AUSIMM
    Training our New Starters – Between a Rock and a Hard Place

    By M Davis

    Increasing growth in the minerals industry over the past decade has raised the question of whether the standard of training for new geologists has been negatively impacted. This hypothesis was tested

    Aug 22, 2011

  • AUSIMM
    Mist Diffusion Experiment and Evaluation of Water Tube for Blasting Demolition Dust Control

    By H-S Yang, H Park, S-J Kim, Y-H Ko, H-S Kim, S-H Cho, J-K Kim

    An investigation was undertaken to devise a new method for reducing dust spread during blasting demolition utilising water tube and detonating cord. Modelling of smooth particle hydrodynamics (SPH) wi

    Aug 24, 2015

  • AUSIMM
    Impact of Initiation Mode of Explosives on Energy Release Characteristics

    By P K. Singh

    Recent advancements in understanding the detonation process are noteworthy, but they are still based on somewhat hypothetical situations. The actual variables that are essential parts of normal blasti

    Nov 8, 2011

  • AUSIMM
    Mary Mac Hill - The Challenges and Strategies of Successful Open Cut Mining: A Complex Underground Gold Deposit Riddled with a Network of Complicated Voids

    By H Chalcraft, T D. Mullen

    Conditions encountered at a recently completed brownfields mining project provided valuable insight into, and development of, techniques for working in and around known underground mining voids in an

    Sep 18, 2012

  • AUSIMM
    In Plant Sampling for Gravity Recoverable Gold - ABSTRACT ONLY

    The implementation of robust, reliable and accurate sampling systems is the key to the successful management of any mineral processing plant. The representative sampling of a mineral processing plant

    Aug 1, 2010

  • AUSIMM
    The Contribution of BHP BillitonÆs Ekati Diamond MineTM to Sustainable Development in CanadaÆs North

    By R Beaulieu, D Burlingame, C Hanks

    The Ekati Diamond MineÖ is CanadaÆs first diamond mine and is located 300 kilometres northeast of Yellowknife in the Northwest Territories. The development of the mine supports sustainable development

    Jan 1, 2002

  • AUSIMM
    Ventilation Upgrade at the FrogÆs Leg Mine - Case Study

    By A Llewellyn, M Varvari

    The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.

    Jul 1, 2013

  • AUSIMM
    A Multibody Simulation Solution to Analyse Attachment Kinematics of Hydraulic Excavators andáOther Linkages

    By M Dietrich

    The paper describes an efficient method for analysing the different attachment kinematics of excavators and other linkages by taking into account digging forces, the workspace and the stability of the

    Sep 26, 2011

  • AUSIMM
    Optimisation of an Image Analytical System for Bulk Materials Using the Theory of Sampling

    By K H. Esbensen

    Optimisation of a real-time at-line monitoring system for control of industrial granule coating quality is presented. The system is based on a fluorescence imaging system, because fluorescence origina

    Jan 1, 2005

  • AUSIMM
    Reconciliation Principles for the Mining Industry

    Reconciliation involves the collection of tonnage, grade (quality) and contained metal (product) data from disparate and hopefully independent sources. Examples are exploration data, production sampli

    Sep 26, 2011

  • AUSIMM
    The relationship between the magnitude of impact velocity per impulse and cumulative absorbed energy capacity of a rock bolt

    By B Crompton, A Berghorst, G Knox

    Laboratory-based dynamic testing provides an invaluable tool in the development of rock bolts for use in highly stressed, burst prone rock masses. While in most cases the laboratory-based test method

    Nov 30, 2018