Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Impact of Classification on the Energy Efficiency of Grinding Circuits - The Hidden Opportunity

    By W Valery, A Jankovic

    A growing demand within the minerals industry for sustainable development and the introduction of carbon taxes have resulted in a significant focus on improving the energy efficiency of comminution ci

    Oct 29, 2012

  • AUSIMM
    A tailored solution to determine plant capacity using strategic analysis

    By J Nortier, J Dray

    There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi

    Jun 22, 2022

  • AUSIMM
    Issues in Capital Raisings and Disclosure

    By B Dodd

    This paper details how the Australian Securities and Investments Commission (ASIC), as a disclosure and conduct regulator, approaches regulation of continuous disclosure, capital raising and control t

    Nov 20, 2012

  • AUSIMM
    Practical Considerations for Multimine Grade Reconciliation

    This paper discusses the implementation and potential limitations of the method for estimating sampling and analytical errors of multiple source mine output blended into a shipping product, described

    Mar 1, 2010

  • AUSIMM
    Wide area mapping of ground instabilities from space: InSAR for geotechnical risk assessment and hazard monitoring

    By J Morgan

    Regular monitoring of surface deformation over mine sites is important for providing updated information to managers regarding geotechnical risks related to ground instabilities. This is particularly

    Nov 30, 2018

  • AUSIMM
    Commercial Underground Space – Planned Development for the Future

    By A C. Robertson

    World urban expansion puts constraints on the available land surface area of our major cities both for accommodating people as well as providing infrastructure and services whilst at the same time att

    Sep 17, 2014

  • AUSIMM
    Defining Residual Risk for Successful Mine Closure – a Geochemical Perspective

    By T Baumgartl, B Noller, B Forsyth, J Park, M Edraki, P Pham

    Understanding and quantifying residual risk is the key to the successful closure and rehabilitation of mines. An important aspect of residual risk is predicting the long-term chemistry of mine water a

    Jun 28, 2016

  • AUSIMM
    High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, Philippines

    By C Harrison, A Bowskill

    The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to

    Sep 17, 2014

  • AUSIMM
    The Determination of Dust Losses in Metallurgical Processes, As Practised at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.

    IN carrying out experiments to determine the amount of metal taken away by fume or fine dust the apparatus used requires to be strong and compact, as it is generaIIy necessary to work on a staging fix

    Jan 1, 1922

  • AUSIMM
    Towards the Elimination of Conventional Surface Slurried Tailings Storage Facilities

    By D J. Williams

    The approach to the disposal and storage of mine tailings is slowly evolving. Tailings disposal has been based on minimising short-term capital and operating costs, with rehabilitation costs discounte

    Jul 27, 2015

  • AUSIMM
    Improving Blasting by a Team Approach at the Henty Gold Mine

    By R Wedmaier

    Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û

    Jan 1, 2001

  • AUSIMM
    Bit to Bag - The Importance of a Total Coordinated System in Reverse Circulation Drilling

    By M Goers, M Almond

    "The use of reverse circulation (RC) drilling for grade control sample collection was selected by the Pueblo Viejo Mine Geology department at the recommencement of the operation in 2010. This method w

    Aug 21, 2012

  • AUSIMM
    Improving dust management in gate road development – a computational fluid dynamics-virtual reality based training tool for mine workforce

    By M Qiao, A Sugden, W Zong, J Hines, J Roberts, T Ren

    Long-term exposure to respirable dust continues to present an occupational health and safety hazard to mine workers in underground mines. Workers who are exposed to mine dust can develop occupational

    Apr 16, 2024

  • AUSIMM
    Management of Acid Drainage in the Australian Minerals Industry

    Confirmation that acid drainage (AD) was a significant environmental issue for the Australian minerals industry came in 1992 with the first national workshop on the topic. Subsequently the extent of A

    Jan 1, 2003

  • AUSIMM
    Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper Operations

    By D Kent, J Bullock, M Wilkinson

    Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su

    Oct 16, 2017

  • AUSIMM
    Process modelling and high-throughput thermochemical calculations using ChemApp for Python

    By F Tang, Ö K. Büyükuslu, M Baben, S Petersen

    GTT-Technologies’ ChemApp for Python was developed to provide a powerful, easy to use interface to ChemApp for a programming language highly popular with scientists and engineers. It is used, for inst

    Jun 19, 2024

  • AUSIMM
    Cover System Performance Monitoring for Tailings – Are We Doing It Correctly?

    By R Barritt, P Scott

    Across the globe, it is a common scenario that tailings storage facilities (TSFs) are being decommissioned; however, their subsequent impact on the local environment and landscape can often be overloo

    Jul 27, 2015

  • AUSIMM
    Evolution and technical considerations to manage tailings at the RPP- 140 mining title (Antioquia - Colombia)

    By García B., Wolff E.

    In Colombia, northeast of Antioquia, there is a gold deposit that has produced continuously since the middle of the XIX century, located within mining title RPP-140, property of Gran Colombia Gold Seg

    Jun 17, 2024

  • AUSIMM
    The Python - An Underground Processing Plant for Narrow Vein Mining

    By N J. Grigg

    Gekko Systems has developed an underground pre-concentration plant (Python) to reduce mine operating costs. Many ores liberate favourably using either high pressure grinding rolls (HPGR) or vertical

    Jan 1, 2008

  • AUSIMM
    Research on the Shape and Particle Size Distribution of Caved Ore Mass in Sublevel Caving

    By G J. Zhang

    The shape and particle size distribution of caved ore mass in sublevel caving were investigated in this study. The paper first reviews the main factors affecting the shape and characteristic of caved

    Jul 11, 2011