Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Waihi Goldfield

    SOME 70 miles south-east of the of Auckland lies the town of Waihi-the centre of the Waihi goldfield, at present the mining pride of New Zealand. That the glory of most mining camps is evanescent form

    Jan 1, 1911

  • AUSIMM
    Benefits of Feed Changes on Nickel Refining Operation at Kwinana Nickel Refinery

    Western Mining Corporation (W.M.C.) operates a nickel refinery at Kwinana, 30 km south of Perth. The refinery commenced pro- duction in May 1970, with a rated capacity of 15 000 tpa of nickel metal

    Jan 1, 1984

  • AUSIMM
    Pit-Blend Optimisation - A Case Study in Iron Ore

    By Piotto P

    Pit optimisation algorithms are designed to produce a pit with maximum value, but for certain minerals like iron ore, limestone, coal, etc, it is also necessary that the designed pit contains ore whic

    Jan 1, 1996

  • AUSIMM
    Control and Distribution of Face Air by Water Sprays on Mining Machines

    By Muldoon T

    Water sprays on mining machines are generally put there to reduce dust; however, research by the Bureau of Mines and others has shown that considerable airflows may also be generated by these spray

    Jan 1, 1983

  • AUSIMM
    Twenty Five Million Tonnes of Ore and Ten Metres of Rain

    By Maconochie A. P

    The copper-gold orebodies of the Ok Tedi project and located in an area of climatic and topographic extremes, where both the landforms and the rocks from which they have developed are so young that it

    Jan 1, 1990

  • AUSIMM
    From Target Generation to Two Billion Tonnes in 18 Months ù The Re-Invention of the Chichester Range

    By D A. Kepert, D Clark

    During early 2004, Fortescue Metals Group (FMG) began an aggressive exploration and drilling program in the Chichester Range, targeting iron enrichment developed in the Nammuldi Member at the base of

    Jan 1, 2005

  • AUSIMM
    Selection of Variables in Air Pressure Dewatering of Mineral Slurries

    This paper describes the effects of physical variables in dewatering of mineral slurries with air as the filtrate displacing medium. Using a mathematical model with material related constants measu

    Jan 1, 1989

  • AUSIMM
    An Investigation into Spoil Stability at Moura

    By Dunbavan M, Mallett C. W

    The sequence of development and back analysis of the failure of a spoil pile in the 1B pit of the Moura Mine are given. The mode of failure was a two-wedge mechanism with a basal slip plane passin

    Jan 1, 1981

  • AUSIMM
    Disposal of Run-Off Water by Land Application at Ranger Uranium Mine, Northern Territory: Geochemical and Radiological Considerations

    By Watters R

    Modem open cut and underground mining in the tropics inevitably expose partially weathered and unweathered rocks to oxygen and water, leading to weathering and the release of solutes and often acidi

    Jan 1, 1994

  • AUSIMM
    Resources and Reserves at Z.C. Mines Broken Hill

    By Hulton SJ, MacKenzie DH

    The Broken Hill orebody within the leases of ZC Mines is still a major lead-silver-zinc resource after over 80 years of mining. It illustrates particular problems encountered in resource and reserve

    Jan 1, 1987

  • AUSIMM
    Implementation of Flash Flotation in the Ok Tedi Grinding Circuit

    By Erepan P. C

    Flash flotation technology was introduced by Outokumpu in 1985. Considerable success was achieved in other plants with similar operations to OTML. Conclusions from site visits and amenability tests

    Jan 1, 1997

  • AUSIMM
    Mathematical Model for Simulation of Seam Gas Drainage

    By Reichman J, Chapman G

    The features of seam gas drainage from the point of view of mathematical modelling are outlined and discussed: 1. The use of conventional single phase gas reservoir simulator for very simplified mode

    Jan 1, 1982

  • AUSIMM
    Support of Longwall Workings in Thick Seam Extraction

    By Smith PE

    The main components of face design are the power loader, face conveyor and powered support system and the interaction of these components determines the effectiveness of strata control. A major in

    Jan 1, 1986

  • AUSIMM
    Mine Owner and Explosives Supplier - Partners in Controlling the Environmental Effects of Blasting

    By Hagan T. N, Tucker A. J

    The Cumnock Open Cut Mine (COCM) is located in the Hunter coalfield in New South Wales. Five coal seams are being mined, mostly by drilling and blasting, loaders and excavators, and trucks. The ann

    Jan 1, 1995

  • AUSIMM
    A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out Tests

    This study is to compare reinforcement of rebar and spiral bolts using laboratory pull-out test. For this purpose, the pull-out test was performed in laboratory for a curing period of 7- and 28-days.

    Dec 6, 2010

  • AUSIMM
    Ore Reserves Estimation For Copper Orebodies At Mount Isa Mines Limited

    Ore Reserves estimation for the two producing copper orebodies at Isa Mine, Mount Isa, Queensland is discussed. The principal estimation techniques used and discussed are first, a computer based in

    Jan 1, 1979

  • AUSIMM
    Metalliferous Mineralisation in Northeast Queensland: A Review of the Eighties and a View Towards the Nineties

    Following unprecedented high market prices for tin and gold in 1980, significant advances in both mining technology and geological knowledge took place in northeast Queensland. These led to a rapid gr

    Jan 1, 1990

  • AUSIMM
    The Role of Geologists in the Mining of Structurally Complex Narrow Vein Ore Deposits

    The narrow quartz vein deposits at Konongo and Ghana Main Reef gold mines in Ghana were emplaced during the plastic flow cross folding of pre-existing sub-isoclinally folded volcanic and perivolcanic

    Jan 1, 1993

  • AUSIMM
    Monitoring Equipment Productivity Improvements in Coal Mines

    By Sengstock G. W, Spathis A. T

    Benchmarks of mine equipment involved in the excavation process of coal mines would suggest that such equipment is not always operating at an optimum level. Dragline operations and truck/shovel oper

    Jan 1, 1995

  • AUSIMM
    Application of Linear Shaped Charges for Pre-Splitting

    By Sen G

    An amount of explosives, whether it be cylindrical, spherical, etc in configuration, with a hollow cavity in one face or end is known as a hollow or shaped charge. When this charge is initiated, a f

    Jan 1, 1995