The Waihi GoldfieldSOME 70 miles south-east of the of Auckland lies the town of Waihi-the centre of the Waihi goldfield, at present the mining pride of New Zealand. That the glory of most mining camps is evanescent form
Jan 1, 1911
-
Benefits of Feed Changes on Nickel Refining Operation at Kwinana Nickel RefineryWestern Mining Corporation (W.M.C.) operates a nickel refinery at Kwinana, 30 km south of Perth. The refinery commenced pro- duction in May 1970, with a rated capacity of 15 000 tpa of nickel metal
Jan 1, 1984
-
Pit-Blend Optimisation - A Case Study in Iron OreBy Piotto P
Pit optimisation algorithms are designed to produce a pit with maximum value, but for certain minerals like iron ore, limestone, coal, etc, it is also necessary that the designed pit contains ore whic
Jan 1, 1996
-
Control and Distribution of Face Air by Water Sprays on Mining MachinesBy Muldoon T
Water sprays on mining machines are generally put there to reduce dust; however, research by the Bureau of Mines and others has shown that considerable airflows may also be generated by these spray
Jan 1, 1983
-
Twenty Five Million Tonnes of Ore and Ten Metres of RainBy Maconochie A. P
The copper-gold orebodies of the Ok Tedi project and located in an area of climatic and topographic extremes, where both the landforms and the rocks from which they have developed are so young that it
Jan 1, 1990
-
From Target Generation to Two Billion Tonnes in 18 Months ù The Re-Invention of the Chichester RangeBy D A. Kepert, D Clark
During early 2004, Fortescue Metals Group (FMG) began an aggressive exploration and drilling program in the Chichester Range, targeting iron enrichment developed in the Nammuldi Member at the base of
Jan 1, 2005
-
Selection of Variables in Air Pressure Dewatering of Mineral SlurriesThis paper describes the effects of physical variables in dewatering of mineral slurries with air as the filtrate displacing medium. Using a mathematical model with material related constants measu
Jan 1, 1989
-
An Investigation into Spoil Stability at MouraBy Dunbavan M, Mallett C. W
The sequence of development and back analysis of the failure of a spoil pile in the 1B pit of the Moura Mine are given. The mode of failure was a two-wedge mechanism with a basal slip plane passin
Jan 1, 1981
-
Disposal of Run-Off Water by Land Application at Ranger Uranium Mine, Northern Territory: Geochemical and Radiological ConsiderationsBy Watters R
Modem open cut and underground mining in the tropics inevitably expose partially weathered and unweathered rocks to oxygen and water, leading to weathering and the release of solutes and often acidi
Jan 1, 1994
-
Resources and Reserves at Z.C. Mines Broken HillBy Hulton SJ, MacKenzie DH
The Broken Hill orebody within the leases of ZC Mines is still a major lead-silver-zinc resource after over 80 years of mining. It illustrates particular problems encountered in resource and reserve
Jan 1, 1987
-
Implementation of Flash Flotation in the Ok Tedi Grinding CircuitBy Erepan P. C
Flash flotation technology was introduced by Outokumpu in 1985. Considerable success was achieved in other plants with similar operations to OTML. Conclusions from site visits and amenability tests
Jan 1, 1997
-
Mathematical Model for Simulation of Seam Gas DrainageBy Reichman J, Chapman G
The features of seam gas drainage from the point of view of mathematical modelling are outlined and discussed: 1. The use of conventional single phase gas reservoir simulator for very simplified mode
Jan 1, 1982
-
Support of Longwall Workings in Thick Seam ExtractionBy Smith PE
The main components of face design are the power loader, face conveyor and powered support system and the interaction of these components determines the effectiveness of strata control. A major in
Jan 1, 1986
-
Mine Owner and Explosives Supplier - Partners in Controlling the Environmental Effects of BlastingBy Hagan T. N, Tucker A. J
The Cumnock Open Cut Mine (COCM) is located in the Hunter coalfield in New South Wales. Five coal seams are being mined, mostly by drilling and blasting, loaders and excavators, and trucks. The ann
Jan 1, 1995
-
A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out TestsThis study is to compare reinforcement of rebar and spiral bolts using laboratory pull-out test. For this purpose, the pull-out test was performed in laboratory for a curing period of 7- and 28-days.
Dec 6, 2010
-
Ore Reserves Estimation For Copper Orebodies At Mount Isa Mines LimitedOre Reserves estimation for the two producing copper orebodies at Isa Mine, Mount Isa, Queensland is discussed. The principal estimation techniques used and discussed are first, a computer based in
Jan 1, 1979
-
Metalliferous Mineralisation in Northeast Queensland: A Review of the Eighties and a View Towards the NinetiesFollowing unprecedented high market prices for tin and gold in 1980, significant advances in both mining technology and geological knowledge took place in northeast Queensland. These led to a rapid gr
Jan 1, 1990
-
The Role of Geologists in the Mining of Structurally Complex Narrow Vein Ore DepositsThe narrow quartz vein deposits at Konongo and Ghana Main Reef gold mines in Ghana were emplaced during the plastic flow cross folding of pre-existing sub-isoclinally folded volcanic and perivolcanic
Jan 1, 1993
-
Monitoring Equipment Productivity Improvements in Coal MinesBy Sengstock G. W, Spathis A. T
Benchmarks of mine equipment involved in the excavation process of coal mines would suggest that such equipment is not always operating at an optimum level. Dragline operations and truck/shovel oper
Jan 1, 1995
-
Application of Linear Shaped Charges for Pre-SplittingBy Sen G
An amount of explosives, whether it be cylindrical, spherical, etc in configuration, with a hollow cavity in one face or end is known as a hollow or shaped charge. When this charge is initiated, a f
Jan 1, 1995