Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geochemical and Mineralogical Characterisation of Two Contrasting Waste Rock Dumps ùThe INAP Waste Rock Dump Characterisation Project

    By P Fines, D J. Williams, G W, S Miller

    This paper presents the results and findings of geochemical and mineralogical testwork conducted on samples collected from waste rock dumps at two mine sites, located in South Carolina, USA (Site 1) a

    Jan 1, 2003

  • AUSIMM
    Development and Application of the SHOTPlan TM Blast Sequence Design Software

    By Evans R, McCallum P

    Modem blast initiation systems allow users many options for connection and application in the field, and have resulted in more innovative and complex uses of sequencing to influence blast outcomes.

    Jan 1, 1995

  • AUSIMM
    The Development of Pyritic Smelting: An Outline of its History

    There is a well-known saying, variously attributed to the great King Solomon and other sages of antiquity, to the effect that 'there is nothing new under the sun'. The inventive genius of ma

    Jan 1, 1994

  • AUSIMM
    The Effect of Residence Time and Aeration on Coal Recovery Within the High Intensity Zone of a Flotation Machine

    By J A. Cowburn

    The high intensity zone within the Jameson Cell is the downcomer. It is largely external and separated from the flotation tank. This, together with operation of the downcomer under vacuum, rather than

    Jan 1, 2005

  • AUSIMM
    The Handling of Materials at the Risdon Works of the Electrolytic Zinc Co. of Australasia Ltd.

    THIS paper deals with the handling of the various materials used in the 100-ton zinc plant at Risdon, and, in view of the magnitude of the works, the configuration of the ground covered by these works

    Jan 1, 1923

  • AUSIMM
    Production Scheduling Using Linear and Integer Programming

    By T GRAHAM-TAYLOR

    A trend towards mining more complex and economically marginal orebodies, often combined with increasingly tight product specifications, increases the number of variables which need to be considered

    Jan 1, 1992

  • AUSIMM
    Special Development of KHD in Communition Technology

    The winning and upgrading of mineral raw materials necessarily includes size reduction, which serves the liberation and production of marketable products from highly valuable and bulk materials. Fo

    Jan 1, 1993

  • AUSIMM
    Reducing the Cost of Drill and Blast Tunnel Work by Use of Tunnel Operations Analysers

    By Maidl B

    A tunnel operations analyser is a new high technol- ogy instrument for use in underground work. By remotely sensing the acoustic emissions from operating machines and processes in a tunnel or shaft

    Jan 1, 1987

  • AUSIMM
    The Mechanisation and Development of the New South Wales Coal Industry Over the Last Twenty Years

    The New South Wales coal industry is a highly mechanised well organised industry which has developed from an annual production of slightly less than 13 million tons in 1950 to over 33 million tons i

    Jan 1, 1980

  • AUSIMM
    A New Method for Estimating the Full-Scale Grind Target for Flotation from Laboratory Batch Grinding and Flotation and Reference Full-Scale Tests

    By Liu Y, Campbell K. R

    The paper shows how breakage parameters may he extracted from laboratory batch grinding results and how they may used with reference full-scale hall mill circuit data to estimate the likely size dis

    Jan 1, 1997

  • AUSIMM
    Longwall Mining at Appin Colliery

    A four monthly period was analysed for each retreating longwall face which indicated that output increased from 1140 tonnes/day for Longwall 1, to 1620 tonnes/day for Longwall 2 and to 2090 tonnes

    Jan 1, 1976

  • AUSIMM
    The Lake Rotokaua Sulphur Deposit

    The Lake Rotokaua sulphur deposit, near Taupo, New Zealand, is a lacustrine sedimentary ore body, 220 acres in area and from 7 ft to 96 ft thick, containing, within the area drilled to date, some 20

    Jan 1, 1971

  • AUSIMM
    Processing and Potential Utilisation of Variable Grade Western Australian Diatomite Deposits

    The Engineering Chemistry Division of the Government Chemical Laboratories of WA initiated an ongoing investigation into the possible utilisation of diatomites of this State. The work has shown th

    Jan 1, 1979

  • AUSIMM
    TQM Principles at Work at Nickol Bay Quarry - A Case Study

    By Marton A

    The Readymix Group have a Quarry Improvement Program - 'Building in Quality (BIQ) which has many parallels to the ICI Explosives' total quality management - 'Quality Improvement Progr

    Jan 1, 1994

  • AUSIMM
    Pressure Filtration of Hellyer Concentrates

    By Francis R. S, Campbell J. J

    Aberfoyle's Hellyer Division has filtered very fine flotation concentrates using two different makes of pressure filter. At the Luina concentrator a Larox pressure filter was used to treat a c

    Jan 1, 1989

  • AUSIMM
    The Practice of Engineering Geology in the Planning and Construction of the City of Canberra, A.C.T., Australia

    By de Vries D, Wilson EG, Henderson GAM, Carter EK

    Canberra is a planned city in which the natural environment, rather than existing development and land tenure, has until recent times at least, imposed the major constraints to development. Even r

    Jan 1, 1986

  • AUSIMM
    Instantaneous Outbursts of Coal and Gas

    The phenomenon of Instantaneous Outbursts, although not new to Australia, was sharply drawn to the attention of the local coal-mining industry by two isolated fatal occurrences on widely separated fie

    Jan 1, 1958

  • AUSIMM
    Parachute Stoppings for Rapid Ventilation Control

    By Buizen M

    The results of calibration trials conducted on parachute stoppings under a recently completed NERD&DC grant are presented. Applications of parachute stoppings, for rapid regulation and control of

    Jan 1, 1988

  • AUSIMM
    Subsidence Associated With Mining At Mt. Lyell (cf0f232d-f5b5-4382-b423-238bcf9ce7bd)

    By Callaghan R. P

    Underground production from the low grade copper orebodies at Mount Lyell in recent years has involved surface subsidence of open cut areas. Relevant structural and lithological features of the geo

    Jan 1, 1980

  • AUSIMM
    Continuous Monitoring Techniques for Environmental Control of Waste Water Discharge at Northern Territory Mine Sites

    By Mine F. J, Woods P. H

    The Top End of the Northern Territory lies in the monsoonal zone and receives rain during the November-April period. Initially, at the start of the wet season, rain storms are localised, but, follow

    Jan 1, 1994