Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Tonnes, Grade and Economics - The ZC Mine Experience 1985-1988From the mid-1970s ZC Mines at Broken Hill had a policy to increase ore production rates at progressively lower head grades. In the mid-1980s the mine suffered crippling losses at a time of low metal
Jan 1, 1990
-
A Comparison of Two Methods for Calculating the Constants K and Alpha in a Broken OreBy R Minnitt
Two methods of calibrating the parameters K and Alpha for use in Gy’s formula for the fundamental sampling error were investigated. Approximately 480 kg of broken ore from Harmony’s Target gold mine i
Jul 29, 2014
-
Mechanisms Involved in Thermal ComminutionBy Chaves AP, Delboni H. Jr
Thermal comminution is an industrial process specially suited to very abrasive material, when contamination with Fe from wearing parts of conventional crushing and grinding equipment must be avoided
Jan 1, 1993
-
Saving Money on SafetyA major problem with many items of underground equipment is that they have either been converted or adapted from surface equipment, or that they have been designed and assembled in comfortable offices
Jan 1, 1992
-
Study on a New Technology of Separating Seabeach Placer with Mixed CollectorsBy Baoqi S, Zhengbing C, Wenguang L
A new flotation method is introduced for separating zircon from rutile and other Ti-bearing minerals at normal temperature, using a mixture of cationic and anionic collectors without any acid, alkal
Jan 1, 1993
-
The Geochemical Exploration for Golf Using Instrumental Neutron Activation AnalysisVarious factors influence the exploration geologist or geochemist in his choice of.an analytical method for gold and other elements which may help him find the elusive gold deposit. One of the fir
Jan 1, 1987
-
Errors in Sampling Rock Fragmentation from ImagesThe basic purpose of blast design is to produce rock in a size range which is within the requirements of the materials handling system. Once this is achieved, one would like to find the fragmentation
Jan 1, 1976
-
A Safety RegulatorÆs Perspective of Risk ManagementBy R Billingham
QueenslandÆs new safety legislation for metalliferous and coal mining (Mining and Quarrying Safety and Health Act 1999 and Coal Mining Safety and Health Act 1999, together with the Regulations) came i
Jan 1, 2002
-
Developing an Attractive Climate for Responsible Resource Development in a Socially-Sensitive Environment - The Victorian Experience as a ModelBy Jiricek F
Legislative change has reformed the licensing process in Victoria. The Mineral Resources Development Act 1990 and the two stage system of licensing with the authority to commence work is discussed.
Jan 1, 1997
-
Educating Future Mine Managers - Maintaining the Gene PoolBy J Galvin
This paper addresses the actions of the Australian mining industry, its regulators and educational providers towards ensuring that a pool of competent mine managers is maintained in Australia and that
Jan 1, 2006
-
Development of New High-Strenght Zinc AlloysBy Kubo H, Ninomiya R, Ojiro T, Sato T
New high-strength Zn alloys for moulds are demanded from the automobile and electric industries in Japan, because the s rength of Zn moulds is still not high enough for the mass production. There ar
Jan 1, 1993
-
Metamorphic core complexes - "hot spots" in the continental crust?Magmatism is of first order significance in the extension process. Continental extension is terminated when sea-floor spreading commences, but sea-floor spreading will not commence if magmas do not be
Jan 1, 1990
-
Zinc-Rich Massive Sulphide Deposits in TasmaniaBy Gemmell J. B
Zinc-bearing massive sulphide deposits have been mined in Tasmania since 1900. The current major producers are Hellyer and Rosebery, with total resource tonnages (mined plus reserves) of 16 Mt (mill
Jan 1, 1993
-
Mount Isa Mines Limited Activities and Responsibilities Mechanical Engineering DepartmentThe organization of this department is as shown in the following chart:Chief Mechanical EngineerPowerGenerationWorkshopsNew ConstructionMaintenanceTransportCommunity ServicesMineMillSmelterDesign and
Jan 1, 1953
-
On State Assistance to Mining: Methods, Expenditure, and Some Particulars of ResultsJUDGING from the attitude of past and present Parliaments in Australia, it is a' reasonable assumption that encouragement of the principal industries has been adopted as a main principle in the g
Jan 1, 1911
-
Optimization of Bench blast Design with the Aid of ComputerA new bench blast design method and its realization with the assistance of the computer is introduced. The basic design principle is to define a rhomb cell, called fully- fractured zone, through a s
Jan 1, 1992
-
Introducing deep learning and interpreting the patterns – a mineral deposit perspectiveBy I Sucholutsky, D M. First, D Mogilny, F Yusufali
Machine learning is creating value in all facets of the mining industry, from exploration to production. The authors provide an accessible, high-level introduction to artificial intelligence (AI), mac
May 24, 2023
-
Statical Calculation of Curved Wall for the Horseshoe Shaped Tunnel LiningThe behavior of a curved wall under earth pressures for a horseshoe shaped tunnel lining is considered to be closely related to the beha vior of a vertical beam with variable flexural sti-"ness on
Jan 1, 1987
-
Site Investigation, Instrumentation and Results of a Trial Embankment on Coal TailingsBy Morris P. H
A trial embankment was constructed using coarse coal mine reject on a deposit of crusted coal mine tailings at New Hope Colliery, located in the Bundamba District of the West Moreton Coalfields in Sou
Jan 1, 1990
-
Converter Slag Flotation Practice at Mount Isa Mines LimitedBy Watsford RMS, Schache IS, Slaughter PJ
As part of the overall Copper Smelter expansion activities at Mount Isa Mines from 1970 - 1975, a decision was made to open circuit the converter slag from the Smelter and treat this product by flo
Jan 1, 1978