Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Development of an Ore Milling Traineeship

    Traditionally mill operators have been employed with varying educational backgrounds with little if any formal training in aspects of mineral processing. Pasminco Mining-Rosebery, in line with other

    Jan 1, 1991

  • AUSIMM
    The Status of Oil Exploration in Western Australia

    Despite extensive oil exploration in"Western Australia over the past 12 years no commercial oil fields have yet been found. A total ' of 66 test wells have been drilled throughout the State but

    Jan 1, 1964

  • AUSIMM
    Environmental Concerns in Operating a Mine

    The passage of a vast array of new State and Federal environmental legislation over the last couple of years has required many mine operators to sharpen their focus on environmental requirements. Esta

    Jan 1, 1993

  • AUSIMM
    Calculation of Hydrodynamic Interaction of a Mineral Particle with a Bubble Under Conditions of Mixed Sorption Coating of Collector

    The attachment of a spherical particle to a bubble is theoretically investigated under the condition of a mixed sorption coating of a collector. It is shown that the attachment is determined primari

    Jan 1, 1993

  • AUSIMM
    Integrated Approach to Mining

    Economic recovery of valuable natural resources is enhanced through an integrated approach to establishing and operating the mine.Gordonstone has a unique and valuable high quality coal and the basic

    Jan 1, 1993

  • AUSIMM
    Cannington Mine - Back to the Cradle for BHP

    The Broken Hill Proprietary Company Limited (BHP) started as a silver-lead-zinc mining company in Broken Hill, New South Wales, Australia in the 1880s. Since then it has diversified into the resource

    Jan 1, 1998

  • AUSIMM
    Reporting Mineral Resources and Mineral Reserves in the United States of America -Technical and Regulatory Issues

    The Committee for Mineral Reserves International Reporting Standards (CRIRSCO) was formed in 1994 to promote development and adoption of international standards for estimation and reporting of explora

    Jan 1, 2006

  • AUSIMM
    Geotechnical Factors Affecting the Surface Placement of Process Tailings in Paste Form

    By D J. A Van Zyl, J C. Cunning

    Technological advances associated with the expanded application of paste technology in underground mine backfilling are now stimulating an interest in the disposal of process tailings as paste in the

    Jan 1, 1998

  • AUSIMM
    Global Materials Flows in Minerals Processing

    Transformations of minerals to processed mineral products fundamentally involve wholesale chemical change, and therefore have a high potential for the release of chemicals and wastes. In this regard m

    Jan 1, 2002

  • AUSIMM
    Assessing the effectiveness of erosion predictions from a landform evolution model with field observations from a rehabilitated landform

    By G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard

    Landform evolution models (LEMs) can assess the effectiveness of landform designs applied to a rehabilitated landform by predicting where erosion may occur. Here, we compare erosion predictions produc

    Aug 2, 2023

  • AUSIMM
    The Application of the Floatability Characterisation Test Rig (FCTR) in Flotation Research

    By J-P Franzidis

    Mill operators have traditionally been forced to rely on grade-recovery curves and overall flotation rate constants when analysing proposed improvements to plants. This has led to loss in money and ti

    Jan 1, 2000

  • AUSIMM
    Predicting the Performance of a Flotation Circuit that Incorporates Flash Flotation

    By D Wiseman, R Dunne

    Flash flotation is a process that is included in many new mineral processing plants as part of the grinding circuit. Some of the valuable minerals can often be liberated at coarse sizes and will remai

    Jan 1, 2005

  • AUSIMM
    Geology, Metallurgy and Mining Engineering - Why We Must Strengthen the Links

    Recent well-publicised problems with the start-up of new mining projects have continued to feed the perception that the mining business in general and Ore Reserves in particular are a poor risk. New m

    Jan 1, 2002

  • AUSIMM
    Subcritical Crack Growth in Brittle Sandstones under Cyclic Tensile Load

    By Moelle KHR

    The successful operation of a longwall face depends significantly on the efficient actions by support systems and on the ability to form a supported beam for a limited time span.The mechanical action

    Jan 1, 1991

  • AUSIMM
    Designing the Optimal Flotation Circuit - The Prominent Hill Case

    By P J. Colbert, P D. Munro

    OZ Minerals' Prominent Hill copper-gold concentrator in South Australia was built in 2008 with commercial production commencing in early 2009. In addition to recovery of valuable minerals, the fl

    Jan 1, 2009

  • AUSIMM
    An integrated and balanced approach to developing pre-concentration technologies across the mining value chain

    By G J. Wilkie, P A. Revell

    The R&D landscape for ore pre-concentration technologies within mining is characterised by the development of individual technologies and point solutions. This presents METS and mining companies with

    Nov 10, 2020

  • AUSIMM
    Coalmine ventilation – examining the past, looking to the future

    By J M. Galvin

    History attests to the catastrophic consequences that fire, explosion and contaminated, noxious andirrespirable atmospheres can have for workplace health and safety in underground coal mining. It also

    Oct 12, 2022

  • AUSIMM
    Pasminco Century Mine Open Pit Slope Design ù A Geotechnical Perspective

    The geotechnical factors controlling the design of the open pit slopes of the Pasminco Century Mine near Lawn Hill, Queensland are presented below. Pasminco Century is a stratiform shale hosted zinc d

    Jan 1, 2000

  • AUSIMM
    A new cut-off grade method to maximise resource utilisation of underground metalliferous mining operations

    By M Nehring, M Kizil, P Knights, A Mousavi, F Sotoudeh

    A cut-off grade is used to distinguish an economically viable block of ore from non-economical ones in mining operations. In order to obtain a high Net Present Value (NPV), a strategic and precise det

    Nov 10, 2020

  • AUSIMM
    Recent Investigations into Some Cellroom Problems at Risdon

    By Palmer DJ, Bain JH, Pullen JB

    Over the last ten years at Risdon, zinc production capacity has almost doubled. This has resulted in modifications, many of which have affected zinc deposition operating conditions in the cells. So

    Jan 1, 1975