Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mineral Resource Policy Issues for Sustainable Development: Corporate and National Imperatives

    Constraints on the mineral industry are best treated as issues that have to be understood and managed in partnership rather than in conflict with communities. TheZapopan development at Mt Todd in Aust

    Jan 1, 1995

  • AUSIMM
    An Update on the Geological Resource Map (Germ) Computerised Mineral Deposit Inventory Database

    The Geological Resource Map of New Zealand (GERM) is a computerised inventory of aggregate, mineral, coal, petroleum and thermal water occurrences, containing summary information on location, producti

    Jan 1, 1991

  • AUSIMM
    Discriminating hematite/magnetite via scanning electron microscope–mineral liberation analyser in the - mesh size fraction of iron ores

    By M Shaffer, D C. Grant, D J. Goudie, P Sylvester, C Voisey

    Scanning electron microscope–Mineral Liberation Analyser SEM-MLA can be used to discriminate between hematite/magnetite in iron ores, but achieving backscattered electron (BSE) segmentation between th

    Jul 24, 2017

  • AUSIMM
    Points on Patents

    Amongst the unavoidable studies of the mining engineer who desires to reach the maximum efficiency, is the subject of patents. With the fundamental principles of the patent laws of this and other lead

    Jan 1, 1901

  • AUSIMM
    A Review of the Western Coal Fields of New South Wales

    The purpose of this paper is to cover in a general way the extent, geology, quality of product, working methods and trials of the coal mining industry. of New South Wales from 1946 to the present day,

    Jan 1, 1954

  • AUSIMM
    The Use of Electric Current and Equipment for Domestic Purposes at Mount Lyell

    OWING to the gradual depletion of the hitherto plentiful supply of firewood in the immediate vieinity of Queenstown and Gormanston, which caused a steady increase in the cost of fuel for domestic purp

    Jan 1, 1927

  • AUSIMM
    Enhancing the Business Environment for Prospecting, Exploration and Mining (Past and New Initiatives)

    By K L. Temel, W P. Player

    The underlying message of this paper is that investment in prospecting, exploration and mining in New Zealand is welcomed. The Government's policy with respect to Crown owned minerals is for cont

    Jan 1, 1997

  • AUSIMM
    Use of Backscattered Gamma Radiation for Determining Grade of Iron Ores in Blast Holes and Development Drill Holes

    By Wylie A. W, Mathew P. J, Eisler P. L

    Field studies of the radiations backscattered by iron ores from a 60Co source of primary gamma radiation located in a borehole logging probe have confirmed thatthe P" factor, a ratio of high ener

    Jan 1, 1977

  • AUSIMM
    Study on the dehydroxylation process of an ultrafine goethitic ore

    By M Camarda, A Pirson, F Vasconcelos, J Mesquita

    ArcelorMittal Prijedor is a goethitic iron ore mine located in the north-west of Bosnia and Herzegovina, which mainly supplies ArcelorMittal’s European subsidiaries. Annual production of the asset sta

    Sep 18, 2023

  • AUSIMM
    Upgrading of Indonesia's Bauxite by Washing Method

    Upgrading of Indonesia's Bauxite by Washing Method There were eight bauxite samples used in this research, three samples from Kijang contain total SiO2 18.36 - 29.16 per cent, Al2O3 40

    Sep 13, 2010

  • AUSIMM
    Concentration of Phosphate Ore by Flotation With/Without Desliming

    Concentration of Phosphate Ore by Flotation With/Without Desliming

    Sep 13, 2010

  • AUSIMM
    WaihiÆs 2020 Vision: Part B: Where to From Here?

    For the past 3 years Waihi as a community has been actively engaged in consultation about its future with regard to the environmental, cultural, economic and social viability. This has been made possi

    Jan 1, 2006

  • AUSIMM
    The Geology and Exploration of the Dead Bullock Soak Gold Deposits, The Granites - Tanami Goldfied NT

    By Edmonds W, Giles C. W, Webb R. J, Gum J. C

    Gold production from The Granites - Tanami Goldfield during 1993 is expected to exceed 8 t, eclipsing that of the traditional Northern Territory gold mining districts of Tennant Creek and Pine Creek.

    Jan 1, 1993

  • AUSIMM
    Comparing Energy Efficiency of Multi-Pass High Pressure Grinding Roll (HPGR) Circuits

    Comparing Energy Efficiency of Multi-Pass High Pressure Grinding Roll (HPGR) Circuits With increased emphasis on reducing costs and carbon emissions in mineral processing, it is becoming essential to

    Sep 13, 2010

  • AUSIMM
    Tapping Water by Diamond Drill Holes

    ON mineral lease 38 of the Sulphide Corporation Limited, Broken Hill, a shaft was sunk in the early days Ior prospecting purposes and at the present time it is accessible as far as the 1000-ft. level

    Jan 1, 1919

  • AUSIMM
    An Examination of Tertiary Screening Using Simulation

    By Whiten W. J

    A simulation model was used to study the performance of various types of screen cloth on industrial vibrating screens. The model takes into account the effect of loading upon screen performance and pr

    Jan 1, 1977

  • AUSIMM
    The Trend of Mine Ventilation Practice

    Since the last occasion on which I spoke to you on this subject there has been a considerable increase in the mechanical ventilation of Western Australian mines.The following table compares the figure

    Jan 1, 1941

  • AUSIMM
    A Few Observations on Mine Surveying and Surveying Instruments

    The principles of geometry and trigonometry are so continuously used by mining engineers for the purpose of accurately and intelligibly recording their measurements, that the writer is prompted to lay

  • AUSIMM
    Geophysical Signatures of Andesite Volcanoes in New Zealand - Contrasts and Structural Implications

    By C A. Locke

    Geophysical signatures of the Taranaki and Tongariro volcanoes reflect similarities in their age, composition and hydrothermal histories, but also reflect differences in host rock settings and edifice

    Jan 1, 1995

  • AUSIMM
    Building and Maintaining Effective Project Teams

    By J A. Wells, K G. Thomas, R F. Dewhirst

    "One of the contributing factors to the extreme cost escalation in the first decade of the 21st century was the increase in the amount and cost of engineering work that went into studies and projects.

    Mar 8, 2016