Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Facilitating Decision Making Using 3D Technologies on the West Edmonton Sanitary Sewer Project

    The North Saskatchewan River flows southwest to northeast through a 22-km-long valley in the City of Edmonton, supplying the drinking water to dozens of downstream communities. During heavy rains, com

    Aug 1, 2013

  • CIM
    Development and Construction of the Antamina Surface Water Management Facilities

    By Matt Schuett

    Antamina Mine Facts • Surface Water Design Principles • Drainage Areas • SEDCAD Modeling • Impacted Runoff Collection • Clean Runoff Collection • System Flexibility • Outfall Construction

    May 1, 2004

  • CIM
    Évaluation de la performance technique des chantiers d’abattage pendant l’exploitation par chambres vides

    By J. K. Szymanski

    "RÉSUMÉPour maintenir de bonnes performances technique et économique dans l’exploitation par chambres vides (open stope) il est primordial d’assurer un contrôle efficace des limites réelles des chanti

    Jan 1, 1997

  • CIM
    Electric Resistance Heating for Thawing of Frozen Uranium Tailings

    The Rabbit Lake In-Pit Tailings Management Facility contains frozen layers of tailings due to subaerial deposition during the coldest periods of winter. Thawing is required to ensure full consolidatio

    Aug 1, 2010

  • CIM
    Uranium Supply from Low Grade Ores in Poland

    By Grazyna Zakrzewska-Trznadel

    The paper outlines the main objectives of the project that concern the evaluation of the possibility of uranium production from indigenous resources since Poland enters the nuclear program. The best a

    Aug 1, 2010

  • CIM
    Exploration and Mining Activities at the Uranium Province of Lagoa Real

    By E. C. De Matos

    The Uranium Province of Lagoa Real is located in the mid-south region of Bahia State, Brazil. Uranium is the only mineral wealth, occurring mainly in the form of uraninite. The region has been searche

    Aug 1, 2010

  • CIM
    Analysis of Potential Failure Mechanisms during the Construction of a Rockfill Dyke on a Submerged Tailings Beach

    By Edouard Masengo

    A long dyke will be constructed in a lake with rockfill placed by end dumping method. Its crest will be at elevation 521.5 m compared to the nominal lake level at 520 m. In the first portion, its heig

    May 1, 2003

  • CIM
    Mine and tailings effluent treatment at the Kimberley, B.C. operations of Cominco Ltd.

    By W. J. Kuit

    "Complex facilities which provide for the collection, management and treatment of effluents emanating from the Sullivan mine and concentrator tailings were made operational in October 1979. Key featur

    Jan 1, 1980

  • CIM
    Fluid Flow of Shirahama Sandstone on Laboratory Permeability Test and Numerical Approach by LBM under Stressed Condition to 25MPa

    By Naoki Takada, Dae-Sung Cheon, Minoru Sato, Masaji Kato, Manabu Takahashi, Weiren Lin

    "The permeability and specific storage of rocks and sedimentary layers deep underground are critical parameters for issues related to the buried evaluation of natural gas and oil, CO2 aquifer storage,

    Jan 1, 2015

  • CIM
    Infrastructure Development in Highly Jointed Ground at the New Afton Block Cave Mine

    By Ferrin Prince

    New Gold?s New Afton mine is an 11,000 tonne per day block caving mine, located 8 km west of the city of Kamloops, British Columbia. The reserve is estimated at 52.5Mt with grades of 0.65 g/t Au and 0

    Aug 1, 2013

  • CIM
    Introduction to the Valley copper project

    By R. P. Taylor

    "This paper covers the development of the property to its present production level of20,000 tonnes per day from the Valley Mine. It will also review the analysis of various case studies for the expans

    Jan 1, 1986

  • CIM
    Mine Shaft Wire Rope Sockets- Certification Program at the Materials Testing Laboratory (MTL), Sudbury, Ontario

    By Marcel M. Djivre

    The paper will outline historically the different materials used for pouring sockets and illustrate the current trend due to inherent advantages. A section will be devoted to engineering stress analys

    May 1, 2003

  • CIM
    The use of flotation rate data to evaluate reagents

    By G. E. Agar, J. J. Barrett

    "Traditionally, batch bench-scale flotation tests have been used for evaluating flotation reagents by comparing the results of tests done with various additions of the reagent in question. Usually, co

    Jan 1, 1983

  • CIM
    Kimberley Fatalities Incident- Technical Investigations and Findings

    Fatalities Incident Four people perished May 15 ? 17, 2006 ??Doug Erickson ??Bob Newcombe ??Kim Weitzel ??Shawn Currie Incident details available at: ??http://www.mediaroom.gov.bc.ca/sullivan_m

    May 1, 2008

  • CIM
    Overview of SEDEX Pb-Zn deposits

    By Suzanne Paradis

    Geographic distribution ? Deposit economics ? Temporal distribution ? Tectonic settings ? Basin architecture ? Morphology ? Ore-fluid chemistries Key exploration criteria

    May 1, 2006

  • CIM
    Gamma-ray spectral logging for uranium

    By J. G. Conaway, P. G. Killeen

    "Gamma-ray spectral logging, a useful technique for uranium exploration and evaluation, has generally been underutilized by the Canadian mining industry. Provided that the technique is properly applie

    Jan 1, 1980

  • CIM
    Undergronnd ore handling and hoisting system at the Williams Mine

    By Henry Smith, Stu Brown

    "The Williams Mine is Canada's largest gold producer, with annual production of some 500 000 ounces of gold from two million tonnes of ore. Highly mechanized and automated underground mining prac

    Jan 1, 1991

  • CIM
    Modelling load and product distribution in autogenous and semi-autogenous mills: Pilot plant tests

    By Frédéric Flament, Mary Goldman, Gille Barbery

    "Pilot plant testwork on autogenous and semi-autogenous grinding was conducted at the Centre des Recherches Minérales du Québec (CRM) to investigate the effect of ball addition, solids concentration i

    Jan 1, 1991

  • CIM
    Influence of the CaO, Al2O3 and Fe3O4 Content in the Slag of the Isasmelttm Furnace at Southern Peru Ilo Smelter

    By E. Herrera, L. Mariscal

    "Ilo Copper Smelter operates since 2007 with an ISASMELTTM furnace as a single smelting unit (1,200,000 tpy) associated with two Rotary Holding Furnaces for separation of matte and slag, and which dir

    Jan 1, 2012

  • CIM
    Coal slurry pipeline flow: a review of transport options

    By R. G. Gillies, C. A. Shook, W. H. W. Husband

    "The current state of knowledge concerning pipeline transport of coal in water slurry form is summarized for the four categories: coal-water fuels, conventional fine coal slurries, coarse coals and st

    Jan 1, 1990