Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Analysis And Enhancement Of Cracking Resistance In Thermal Barrier Coatings By Functionally Graded Layers

    Thermal barrier coating (TBC) systems provide thermal insulation to high temperature for aero¬propulsion. A fracture mechanical model developed earlier for multilayer systems is applied on TBC to real

    Jan 1, 2010

  • CIM
    Improving Densification of Fine Coal Refuse Slurries to Eliminate Slurry Ponds

    By Frank Baczek, R. Q. Honaker, D. P. Patil, B. K. Parekh

    Fine refuse slurry impoundment is a requirement for the coal industry to dispose the fines. Impoundment maintenance is an on going problem for the coal industry and its breakage creates environmental

    Jan 1, 2004

  • CIM
    Carmen De Andacollo – Start-up of Teck’s New Copper Concentrator

    By L. Torres, C. S. R. Rondestvedt, M. Bustos

    In February 2010, Teck’s newest Concentrator at Mina Carmen de Andacollo (CDA), Andacollo, Chile was commissioned. The Concentrator is a single line configuration, comprising of one 36 ft diameter x 2

    Jan 1, 2012

  • CIM
    Recycling Low Grade Waste Heat to Electricity

    By N. Razavinia

    Most mining and metallurgical industries produce relatively large quantities of low grade waste heat which they vent, for the most part, to the environment. To date, little is being done to recover so

    Aug 1, 2013

  • CIM
    Production of nano-Structured 5083 Aluminum Alloy by ARB Process and Evaluation Microstructure and Mechanical Properties

    By Saeid Akhavan

    Accumulative roll bonding (ARB) is a severe plastic deformation process for achieving ultrafine grains in metallic sheets without changing the sample dimensions. In this study, ARB process was carried

    Oct 1, 2011

  • CIM
    Evolution of Texture During Accumulative Roll Bonding (ARB) of Nanostructured 5083 Aluminum Alloy

    By Saeid Akhavan

    Accumulative roll bonding (ARB) is a severe plastic deformation process for achieving ultrafine grains in metallic sheets without changing the sample dimensions. In this study, ARB process was carried

    Oct 1, 2011

  • CIM
    Improving Management at Mine Site Pit Lakes

    By John Crusius

    ? 3-year research program overview ? initial results- MainZone pit Waterline pit ? questions raised ? increasingly common in western N. America ? frequently low-pH waters with elevated concentra

    May 1, 2002

  • CIM
    The Anatomy of an Archean Greenstone Belt

    The Red Lake greenstone belt is an irregular mass of lavas sedimentary rocks and intrusives which is approxiately 35 miles long 18 miles wide and 7 miles deep. Basaltic volcamcs are the oldest rocks w

    Jan 1, 1965

  • CIM
    Autonomous Modeling of Pipes Within Point Clouds

    By Mahmoud Ahmed

    Three-dimensional models are in increasing demand for design, maintenance, operations and construction project management. Point-clouds are the main output of automatic data collection using laser-sca

    Aug 1, 2013

  • CIM
    Port of Vancouver Expects a Huge Increase in Mineral Shipments

    By G. S. Crawford

    Forecasts prepared by the B.C. Research Council for the National Harbours Board suggest that mineral shipments through B.C. Lower Mainland port facilities will increase more than four-fold, from 6 to

    Jan 1, 1968

  • CIM
    The Quintette Coal Project

    By D. C. Rance

    "The Quintette Coal Limited property is located in the northeast coal area of British Columbia.A basic agreement with the Japanese steel industry was executed on January 27, 1981 for the sale of 69.5

    Jan 1, 1983

  • CIM
    Matching mining methods to complex coal geology

    By B. J. Morash

    "The six mineable coal seams at Quintette Coal Limited (QCL) vary in thickness from 0.75 m to 9.5 m and include waste partings varying from 0.2 m to 4 m thick. They are highly faulted and folded in so

    Jan 1, 1988

  • CIM
    Controlled blasting in hard intense jointed rock in tunnels

    By Törbjorn Naarttijärvi, Bengt Ludvig, Agne Rustan

    "Falling rock is one of the major causes of serious injuries and deaths in Swedish mines. The research at the Division of Mining and Underground Construction was therefore directed toward controlled b

    Jan 1, 1985

  • CIM
    Maintenance planning and material management systems in productivity improvement in large mining operations

    By S. Srinivasan, R. Coté

    "India is undergoing a massive electrification program using local coal to provide fuel for thermal generating plants. The Rajmahal mine in northern Bihar is scheduled to produce coal at the rate of 1

    Jan 1, 1991

  • CIM
    Innovative liner support trials in underground hardrock mines

    By Chri Langille, Dougal McCreath, Samantha Espley

    "In 1993, trials of two innovative applications of liner support involving the replacement of bolts in the ground support system were undertaken at Inco mines. The first trial involved an evaluation o

    Jan 1, 1995

  • CIM
    Use of Radioactive Tracers to Support Mass Balances in Secondary Grinding Circuits

    By L. Vinnett, T. Ledezma, F. Contreras, F. Díaz

    "Mass balances in secondary grinding are subject to critical constraints mainly because of the unknown load distribution from the SAG mills, the uncertainties in the hydrocyclone split estimations and

    Jan 1, 2016

  • CIM
    An Integrated Approach to Iron Ore Recovery at the Iron Ore Company of Canada

    By Brian Penney

    "The Iron Ore Company of Canada (IOCC} has mined and processed an iron deposit in Western Labrador along the Labrador-Quebec border since the early 1960' s. Current capacity is approximately 19 millio

    Jan 1, 1996

  • CIM
    Diavik ? The Art of the Possible

    By Doug Ashbury

    Diamond Miners? Challenges ? Remote ? 300 kilometres from Yellowknife ? Sub-Arctic conditions ? permafrost, climate ? No power ? No all-weather roads ? Ore bodies difficult to find ? Caribou, fi

    Apr 1, 2005

  • CIM
    Effective Integration of Environmental Leadership and Environmental Management Systems within Cameco?s Mining Division

    By K. Nagy

    To support the implementation of its integrated SHEQ Policy, Cameco has undertaken an environmental leadership initiative with the goal of moving beyond regulatory compliance and significantly reducin

    Aug 1, 2010

  • CIM
    Geomechanical Assessment for Drifts and Chambers Development in the Athabasca Basin

    By Theophile Yameogo

    Much has been said about the methodology of geomechanical design in underground excavations. However, the geological, hydrogeological and geotechnical complexities encountered at t

    Aug 1, 2010