Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Development of the System for Furnace Integrity Monitoring Based on Real-Time Continuous Acoustic Emission Data Acquisition and Analysis

    By A. Saki, P. Gebski, W. Ying

    Industrial smelting furnaces are subjected to significant structural changes and deterioration caused by the conditions under which they operate. The current methods for the structural assessment of f

    Jan 1, 2011

  • CIM
    Anisotropic Closure Analysis of a Drift in Callovo-Oxfordian Claystone based on In-Situ Convergence Data

    By L. M. Guayacán-Carrillo, G. Armand, A. Noiret, D. Seyedi, S. Ghabezloo, J. Sulem

    "The main purpose of this paper is to analyze the convergence measurements in a drift excavated in the Callovo-Oxfordian claystone. The drift axis is in the direction of the major principal horizontal

    Jan 1, 2015

  • CIM
    Freezing Method for Consolidation of Saturated Rock Mass - Development of Knowledge and Technology in Polish Copper Mines

    By S. Fabich

    Since the very beginning of Polish copper mining, special consideration of sink shaft techniques through highly saturated Cenozoic rocks was required. Shaft freezing has been chosen as a method to con

    Aug 1, 2013

  • CIM
    Mine to Mill Approach to Optimize Power Consumption in a Process Plant Operation by Modelling and Simulation

    By D. Runnels, Daniel Roy, Ricardo Esteban, J. Torrealba-Vargas

    "An intuitive way to reduce power consumption in grinding operations is to feed the grinding circuit with finer feed by enhancing blasting and fragmentation control. The optimization of blasting with

    Jan 1, 2016

  • CIM
    Construction and Manufacture of Steel Wire Rope

    By G. C. Hodgson

    Specification and Tests of Rope Wire Chemical Analysis: The range in composition of steel used in the manufacture of wire rope is as follows: Carbon 0 4 to 0.9 per cent Manganese 0 4 to 0.8 Su

    Jan 1, 1931

  • CIM
    Some Accident Hazards and Preventive Measures at Mines

    By E. C. Keeley

    Some Safety Measures at Ontario Mines The following safety precautions have of late been taken by several of the Ontario mines: installation of water crossovers; washing clown of faces to show-up mis

    Jan 1, 1931

  • CIM
    Modeling of Agglomerate Size Distribution for Heap Leaching

    By Raj K. Rajamani, Nikhil Dhawan

    "Agglomeration has become common pre-treatment step to improve heap leach percolation thereby recovery, the fundamental understanding of the agglomeration process for crushed ores is still lacking. Ag

    Jan 1, 2016

  • CIM
    Geology of limestone and dolomite deposits Cape Breton Island, Nova Scotia

    By Donald J. MacNeil

    The commercial carbonate industry of Cape Breton Island, Nova Scotia, began about eighty years ago with the opening of the Sydney steel plant. Significant carbonate deposits are confined to the Precam

    Jan 1, 1984

  • CIM
    The Design of High Pressure Piping in Vertical Shafts

    By W. Kempson

    "As has been noted on numerous occasions, the vertical shafts being sunk around the world are all tending to get deeper as we seek to take advantage of higher grades of minerals which can sometimes be

    Jan 1, 2019

  • CIM
    Pickle Lake-Crow River Area, District of Kenora (Patricia Portion), Ontario

    By M. E. Hurst

    Introduction Between 1903 and 1905, W. Mclnnis, of the Geological Survey of Canada, made a micrometer traverse of the Kawinogans (Crow) river from Kapkichegimaga lake to its junction with the Otosk

    Jan 1, 1930

  • CIM
    Precision of Sampling Systems and Regimes

    By J. W. Merks

    "The accuracy of a measurement on minerals and ores can be assured by applying suitable and unbiased procedures but its precision is a function of the number of primary increments and their mass, the

    Jan 1, 1985

  • CIM
    Gold Mineralization during Progressive Deformation at the Main Reef Complex, Sheba Gold Mine, Barberton Greenstone Belt, South Africa (70be661f-0ee2-40a0-abd8-94be7e748fa0)

    By E. G. C Charlesworth, M. J. Robertson

    "Gold mineralization in the Main Reef Complex at Sheba Gold Mine is hosted within shear zones in a sequence of shales and greywackes of the Fig Tree Group. Competency contrasts between these rocks and

    Jan 1, 1994

  • CIM
    Solvent extraction circuits

    By N. Dave

    "IntroductionIn the mineral processing industry, certain minerals such as uranium, thorium and vanadium, etc., are selectively extracted with high degree of purity from solutions containing variety of

    Jan 1, 1989

  • CIM
    Cold Drawing of Magnesium Alloy Wires and Tubes

    By K. Yoshida

    Recently, light magnesium alloy with superior heat radiating ability has been attracting attention in various fields. However cold plastic working of the alloy is very difficult and hot working necess

    Jan 1, 2006

  • CIM
    Altered Mining Extraction Sequence and Rock Mass Response in Vale 402 OB at Creighton Mine

    By C. Denis Thibodeau

    Outline Introduction 402 OB Mining Sequence Trial to Verify Sequence Change Monitoring Observations Numerical Modelling Conclusion

    May 1, 2013

  • CIM
    Monitoring Perspective of Underground Lined Rock Caverns for High Pressurized Gas Storage

    By H. M. Kim, J. Rutqvist, D. W. Ryu

    "Demand of high pressurized gas storage in underground rock caverns is increasing. Compressed natural gas (CNG) and compressed air energy storage (CAES) are one of the promising examples after since l

    Jan 1, 2015

  • CIM
    Thermo Adhesive Separation of Different Plastics from WEEE Streams

    By Imre Gombköto, Barnabás Csoke

    "Raw material management means not only mining and processing of primary raw materials like ores, but means also collecting and processing secondary sources of raw materials. Recycling is one of the m

    Jan 1, 2016

  • CIM
    A Mineralogical Investigation into the Optimum Grind Size of the Nechalacho Rare Earth Ore for Selective Comminution of Zircon

    By K. E. Waters, C. Marion, T. Grammatikopoulos, A. Jordens

    "The Nechalacho deposit, located in the Northwest Territories, Canada, is a heavy rare earth element (REE) deposit. The main REE-bearing minerals in the deposit are zircon, allanite, bastnäsite, synch

    Jan 1, 2016

  • CIM
    Recovery of Magnetite from Spiral Tailings at Labrador City

    By T. C. Murphy, W. Taciuk

    In 1966, the Iron Ore Company of Canada commissioned a wet magnetic scavanging plant for the recovery of fine magnetite values p.resent in spiral tailings discharged from a spiral gravity separation p

    Jan 1, 1972

  • CIM
    Stability Analysis for Large Scale Underground Caverns Based on Microseismic Monitoring and Numerical Simulation

    By N. W. Xu, C. Sha, F. Dai, Y. G. Zhu, B. Li

    Underground caverns stability and excavatability of rock masses are of significance in geotechnical engineering, in both design and construction stages. Risks associated with underground group caverns

    Jan 1, 2015