Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Study on Integration of Real-Time Atmospheric Monitoring System Data and MFIRE Simulation

    By L. Yuan, J. H. Rowland, R. A. Thomas, D. Bahrami, G. P. Cole

    "The past several decades have seen a steady increase in the use of atmospheric monitoring systems (AMS) in underground mines as sensor technology has advanced and costs for this technology have decre

    Jan 1, 2019

  • CIM
    The Integration of Condition Monitoring into the Maintenance Process

    By Joel Werner

    Weak metal prices, declining head grade, and increased operational costs are forcing many open pit mining companies to look to their balance sheets for significant cost reductions in order to remain c

    May 1, 2003

  • CIM
    Physical Separation Process for Recovering Tantalum Capacitors from Electronic Devices Mounted on Printed Circuit Boards

    By Tatsuya Oki

    Tantalum capacitors can be found mounted on printed circuit boards of domestic appliances such as personal computers. These capacitors contain a considerable quantity of expensive metal tantalum and c

    Jan 1, 2011

  • CIM
    Structural transformations of magnesium alloys during Thixomolding

    By F. Czerwinski

    Mechanically fragmented chips of an AZ91D magnesium alloy were transformed into a semisolid slurry within the Thixomolding® system. Microstructural analysis of a material at various processing stages

    Jan 1, 2004

  • CIM
    Experience in the Heat Treatment of Pressure Die Cast Brackets

    By N. Giguère

    Until recently, the heat treatment of pressure die cast parts has always been considered unpractical because the solution heat treatment resulted in unacceptable blistered parts. This was due to the p

    Jan 1, 2011

  • CIM
    A Simplified Approach for Evaluating Concrete Deterioration in Vertical Shaft Lining

    By G. Q. Zhou, H. C. Liang, X. D. Zhao

    "This study describes the strain behavior in vertical shaft lining (VSL) embedded in thick soil deposits and its application in assessment of concrete deterioration. The observed strain in VSL continu

    Jan 1, 2019

  • CIM
    Some Notes on Uranium in British Columbia

    By John S. Stevenson

    "Although we have no uranium- producing mines as yet in British Columbia, uranium, associated with gold and cobalt, has been found in two deposits in amounts such that the combined value of the metals

    Jan 1, 1950

  • CIM
    Deformation Structures and Yield Asymmetry in Extruded Mg-Zn-Y Alloys Containing Quasicrystal Phase

    By A. Singh

    Deformation structures after tensile and compression tests on Mg926Zn64Y alloy extruded at 250°C and 400°C are studied, in as-extruded and heat treated conditions. The icosahedral phase particles stim

    Jan 1, 2006

  • CIM
    Optimising Open Pit to Underground Cut-over

    By Anthony Finch

    Many mines combine open pit with underground mining, and on many occasions the underground mine is an extension of the open-pit. In these circumstances the decision about where the open-pit stops and

    May 1, 2011

  • CIM
    National Instrument 43-101, standards of Disclosure for Mineral Projects (NI 43-101)

    "NI 43-101 is a rule that governs how issuers disclose scientific and technical information about mineral projects to the public in Canada. The disclosure standards apply to oral statements as well as

    Jan 1, 2003

  • CIM
    Process for Integrating Surface Drainage Constraints on Mine Planning

    By Les F. Sawatsky

    Surface drainage, particularly mine closure drainage, must be properly considered during all stages of mine planning because it presents constraints that are critical to economic mine operation, minim

    May 1, 2009

  • CIM
    Grinding Circuit Design for Similco Mines

    By Anita Marks

    In 2007 Copper Mountain Mining determined that there were sufficient resources to consider reopening the Similco Mine near Princeton, BC. The mill facility that had been built by Newmont Mining in 197

    Jan 1, 2012

  • CIM
    Stump Lake Deposits

    By W. E. Cockfield

    "The Stump Lake mining camp is in Nicola mining division of southern British Columbia. It lies about halfway between the cities of Kamloops and Merritt.The deposits at Stump Lake are among the earlies

    Jan 1, 1954

  • CIM
    Influence of Sample Geometry (Scale Effects) on Mine Backfill Properties

    By Kristie D. Tarr

    Ideally, in situ monitoring would supply the input data for numerical modeling of backfill material property requirements. However, clue to production requirements and costs of conducting field tests,

    May 1, 2008

  • CIM
    Design and Construction of a 1/40th Scale Longwall Mine Model for Physical Testing of Methane Explosions

    By R. C. Gilmore, J. McMack, G. E. Bogin, J. F. Brune, C. DeRosa

    "Researchers at the Colorado School of Mines are designing and building a 1:40 scaled physical model of a fully operational longwall coal mine. The purpose of the model is to minimize the occurrence o

    Jan 1, 2019

  • CIM
    Improving Rockbolting Efficiency And Performance With The Jumbolt At Cannington Mine

    By Geoffrey C. Streeton

    A continual objective of mine operations is to reduce ground control costs without compromising the overall safety or performance of the installed ground support. Any change in the ground support regi

    May 1, 2001

  • CIM
    Radiation Detectors for Prospecting

    By R. F. Errington

    "Radioactive minerals are found together with the more familiar ore minerals in veins, gossans, and pegmatites, Since they have a peculiar property, that of giving off penetrating radiation, the simpl

    Jan 1, 1950

  • CIM
    Filter Washing Efficiency Increased at Bralorne to Reduce Dissolved Losses

    "In mills, metallurgical efficiency is important in every step of the operation through to the tails. Different problems which hinder metallurgical efficiency exist in different mills. One such proble

    Jan 1, 1967

  • CIM
    Validation of Rolling and Steer Resistance of Articulated Tracked Robot

    By M. J. Lopatka

    This paper presents the results of field test and theoretical analysis driving resistance articulated 4x4 tracked robot test-bed. Tests were made on four different grounds. Designated elastomeric trac

    Aug 1, 2013

  • CIM
    Fractured Bedrock Investigation by Using High-Resolution Borehole Images and the Distributed Temperature Sensing Technique

    By R. Charlier, G. Radioti, J. -P. Radu, S. Delvoie, F. Nguyen

    "In order to investigate the fracturing of the bedrock and its possible heterogeneous distribution in situ, four boreholes equipped with double-U geothermal pipes of 100 m long were installed on the c

    Jan 1, 2015