Design and Construction of the New VDOT Midtown TunnelBy Rick Ellman, Ian Chaney
"The Hampton Roads area encompassing the Norfolk, Virginia Beach and Newport News metropolitan region experiences some of the worst traffic congestion in Virginia. With continued growth of the ports a
Jan 1, 2014
-
Effect of Sand Density on Load Sharing Mechanism of Piled Raft FoundationBy Rouzbeh Vakili, Adel M. Hanna
"The application of piled raft foundations has significantly increased during the last few years. In this system, the raft and the pile group collectively transfer the applied building load to the und
Jan 1, 2017
-
DFI and NDT – Parallel Histories and Mutual BenefitsBy Bernard H. Hertlein
"When the Deep Foundations Institute (DFI) was founded, quality assurance and quality control (QA/QC) of foundation construction was rudimentary. Nondestructive testing (NDT) was a nascent technology,
Jan 1, 2017
-
Mansueto Library: Drama below Ground and AboveBy Patrick J. Lydon, Gregory A. Terri
"The recently opened Mansueto Library at the University of Chicago campus was a 2012 OPA runner-up. The dramatic elliptical shaped dome of this structure tells only part of this structure’s story. The
Jan 1, 2013
-
A Tale of Two Very Different MSE Wall StructuresBy Dov Leshchinsky
Mechanically stabilized earth (MSE) walls are composed of three main elements: soil, reinforcement and a facing. If any of these elements are not functioning, its internal performance would be unaccep
Jul 1, 2024
-
An Alternative Pile TechnologyBy Rimas Veitas, James Panton, Erich Steinlechner
"Ductile Iron Piles (DIPs) are a proven, viable alternative to conventional piles, and for the past five years have been successfully used throughout New England. The installation process of DIPs lend
Jan 1, 2017
-
Lateral Response of Pole on Engineered Driven Timber Pile Footing at Ararat Windfarm Terminal StationBy Frank Albrecht, Brian McCarthy
"The Ararat Terminal Station (ARTS) is located 190km to the north-west of Melbourne, approximately 1.7km to the north of Elmhurst Township in the Pyrenees region of western Victoria, Australia. The si
Jan 1, 1900
-
Levee Repair and Upgrade by Dual Sheet Pile Walls and Accordion Sheet Pile WallBy Takefumi Takuma, Ali Fayad, Shigeru Kambe
"This paper discusses the unique design and construction circumstances of the cantilevered dual sheet pile walls and the Accordion Sheet Pile Wall for the repair and upgrade of the East Garden Grove-W
Jan 1, 2017
-
Behavior Of Friction Piles In Soft ClaysBy Safwan Labanieh
An experimental set-up is specially designed to study the behavior of a friction pile of 3 cm diameter in contact with the soft clay of Mexico City in a small calibration chamber (CC) of 30 cm diamete
Jan 1, 2002
-
PMF Remediation of Oxford DamBy Scott Dodds
"The Oxford Hydroelectric Station was a unique project that incorporated a variety of dam strengthening methods to stabilize the facility in order to meet the standards required by Federal Energy Regu
Jan 1, 2005
-
Augercast Piles - History And AdvancementsBy Larry Rayburn
Augercast piles evolved in the late forties from the process of pressure grouting open holes backfilled with stone. In 1956, a patent was issued for a cast in situ pile by pumping high pressure grout
Jan 1, 2005
-
Applications of Diaphragm Wall Technology for Deep Foundations and Permanent Underground Structures for the Transbay Transit Center and the Transbay DevelopmentsBy Mikael Calando, Thomas Joussellin
"San Francisco's rapid growth has caused the city to plan for the Transbay Transit Center Project, a visionary transportation and housing project, that will transform downtown San Francisco and the Sa
Jan 1, 2016
-
Soil-Structure Interaction For A Tension Pile Pulled With StrandBy Chandramohan P. V
A unique tension pile where the pull is at a point a certain distance below the top of the pile. The pull is transferred by a cable consisting of high tensile strands. The HDPE duct of the cable preve
Nov 1, 2022
-
Trench Cutter - The Multi Purpose SolutionBy Alexander Blatt, Franz-Werner Gerressen
Power Point Presetation at DFI 2022
Sep 1, 2022
-
Comparison of 2D and 3D Anchor Analysis MethodologiesBy Ruth McKeown, Gilson de F. N. Gitirana, Murray Fredlund, HaiHua Lu
The current design standards for the use of anchors in slopes is based on two-dimensional (2D) limit equilibrium analyses. Anchors are considered as discrete loads and the 2D anchor, factored based on
Jan 1, 2019
-
Deep Foundation Challenges for a Combined Sewer Overflow StationBy Tina Hastings, Karen Dawson, Ryan Dunne, Patricia Bennett
The Georgetown Wet Weather Treatment Station is located in Seattle and will treat up to 70 million gal {265 L) per day of combined sewage that would have otherwise discharged directly to the Lower Duw
Mar 1, 2024
-
Design and Construction of Nysted Offshore Wind Farm, DenmarkBy Jørn Thomsen, Christoffer Brodbaek
"As governments increasingly accord high priority to sustainable energy, policymakers are finding that wind energy has a long track record as a proven alternative to conventional energy supply.Over th
Jan 1, 2009
-
An Innovative Use Of Bored Tension Piles In Embedded Retaining Wall Design & ConstructionBy Abid O. Adekunte
The design, construction and monitoring of the deep excavation support for the basement of a large-scale commercial development in Cavan, Ireland is presented. Excavation area was adjacent to existing
Jan 1, 2008
-
Sonic Drilling and Sensitive InfrastructureBy George Burnhart
"Sonic drilling is a relatively new technology even though it has been in development since the late 1940s. It was initially funded by the U.S. petroleum industry and then, in the late 40s, Russian sc
Jan 1, 2008
-
Experiences Using A Leader System For Long Cfa(Acip) Piles In HawaiiBy Damien Enright, Franz-Werner Gerressen
CFA/ACIP pile is the most used single pass drilling method for deep foundation installations. It is constructed by rotating and driving a Continuous Flight Auger (CFA) into the ground at a controlled
Oct 1, 2022