Design and Installation of Helical Piles for Support of Bridge Pier FoundationBy David L. Borusiewicz, M. Suri Surendra
"Abstract Helical piles have been used as anchors and for supporting lightly loaded structures as a method of underpinning, etc in the past. Recently, helical piles are being used to support new struc
Jan 1, 2014
-
Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of IraqBy H. Meseck
The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm a
Jan 1, 1989
-
Slurry Wall Design For Hong Kong StationBy Stephen T. Young
The construction of Phase 2 of Hong Kong Station, its retail podium and International Finance Centre Two, the tallest building in Hong Kong, will be completed in the middle of 2003. This paper describ
Jan 1, 2003
-
Measurement And Analysis On The Bearing Behaviour And Driving Effects Of Piles In Shanghai RegionBy Gao Dazhao
This paper presents some research results of pile foundation performance. Measurements on the bearing behaviour and driving effects of piles have been carried out during pile testing and pile driving.
Jan 1, 1991
-
CPT - Guided Installation Of Pressure-Grouted Displacement PilesBy Mark M. Petersen
As part of the addition of eight new combined cycle generating units at the Florida Power & Light Sanford Plant, 2,129 piles were to be installed. The existing plant elements were supported on driven
Jan 1, 2002
-
Design-Build Support Of Excavation For Block 76, Salt Lake City, UtahBy Rick Deschamps
The Block 76 project includes the demolition and redevelopment of an entire city block for mixed use retail, office and residential properties directly adjacent to Historic Temple Square in Salt Lake
Jan 1, 2009
-
Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile SystemBy Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer
"The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of
Jan 1, 2017
-
Cyclic Axial Loading Of Offshore Piles - An Issue Of Concern?By Paul Doherty
Expansion of the global piling industry has been coupled with significant research efforts investigating the mechanisms controlling pile capacity. Static pile design has transitioned from total stress
Jan 1, 2009
-
Pin Piles For Seismic Rehabilitation Of BridgesSince the 1989 Loma Prieta Earthquake in the San Francisco Bay Area, the California Department of Transportation (CALTRANS) has accelerated seismic upgrading of their bridges. Many structures can be i
Jan 1, 1993
-
Deep Diaphragm Wall Activities At Randstadrail Project In Rotterdam, The NetherlandsBy Klaus Pöllath
The Netherlands RandstadRail project makes use of a large range of sophisticated geotechnical techniques to allow a shield driven tunnel to approach the central station of Rotterdam. This paper descri
Jan 1, 2006
-
Bored Piles With Base Preloading By Grouting - The Polish ExperienceBy Bolestaw A. Ktosihski
Preloading of bored pile bases by grouting is an effective way of reducing foundation costs. The bearing performance of a pile may be considerably improved. Various techniques and devices are used. Pr
Jan 1, 2006
-
The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. LouisBy Dan A. Brown
The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia
Jan 1, 2011
-
In-Situ Permeability Testing For Cement-Bentonite Cutoff Wall ? Lessons LearnedBy François G. Bernardeau
Cement-bentonite (C-B) slurry walls have been used for ground water cutoff in deep excavations, contamination containment, and other applications. Hydraulic conductivity is of great concern for cement
Jan 1, 2008
-
Design Of Cooper River Bridge FoundationsBy Osama Safaqah
The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town
Jan 1, 2005
-
Quality Assurance In Jet Grouting For A Deep Seated Slab In AmsterdamBy Thomas Passlick
By means of further developed machines and techniques and with growing experiences in jet grouting, the challenge of this building method becomes more and more complex. To keep the concerning risks as
Jan 1, 2006
-
Rehabilitation Of Existing Foundation Piles Of Marine Structures In New York City Harbor, USABy P. B. Kelleher
Most of the piers and other pile-supported marine structures in the New York City Harbor area were constructed prior to the widespread use of currently available pile protective systems. As a result,
Jan 1, 1989
-
Pile Design, Testing, And Installation For A Gated Dam ? SynopsisBy B. H. Moore
The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori
Jan 1, 2010
-
Mitigating Settlement with Pile-Supported Approach SlabsBy Reda M. Bakeer
"An approach slab is the roadway segment that immediately follows a bridge intended to provide a smooth transition between the two elements. Some approach slabs have developed rough rideability with t
Jan 1, 2017
-
Approach Wall Foundations Olmsted Locks And Dam Project ? SummaryBy Jeffrey A. Schaefer
The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe
Jan 1, 2001
-
Ground Improvement By Cement Grouting Combines With Pipe Piles In Bridge Construction - SummaryBy Peter White
A bridge reconstruction project involved driving pipe piles for the new foundations. Disturbances within soil layers at depth caused sinkholes to open up within the construction site. After a near fat
Jan 1, 1997