    Recent Developments In Secant Bored Pile Wall Construction

    By D. E. Sherwood

    Recent developments in high torque hydraulic rotary rigs has lead to the construction of secant bored pile walls by rotary drilling methods in circumstances where earlier methods were difficult and in

    Jan 1, 1989

  • DFI
    Regulations Of Construction Vibrations

    By Mark R. Svinkin

    Regulations are needed to keep construction vibrations in tolerable limits. The existing regulations were developed for low-rise residential structures, but they are incorrectly used for different sup

    Jan 1, 2006

  • DFI
    Complex Piling Works At London Blackfriars Station

    By Jamie D. McEwan

    To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui

    Jan 1, 2011

  • DFI
    Secant Pile Walls - Design, Construction And Case History

    By Ketan H. Trivedi

    This paper describes the method of analyses used for the design of temporary and permanent Secant Pile Walls, describes various aspects of construction including, guide walls, sequence of pile install

    Jan 1, 2006

  • DFI
    Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)

    By David B. Paul

    "ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class

    Jan 1, 2014

  • DFI
    Value Engineering – Design Risk and Reward at Major Sport Arena Projects

    By Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli

    Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw

    Jan 1, 2018

  • DFI
    Computation Of The Load/Settlement Behaviour Of HP-Bearing Piles - 1. Introduction

    By E. E. De Beer

    This paper describes a method for the determination of the settlement of an individual H-bearing pile, based on the results of CPT-tests. As implied by the nature of the problem, no analysis perform

    Jan 1, 1987

  • DFI
    Overcoming Grouting Difficulties During Retaining Wall Stabilization

    By Jared M. Green

    This paper presents the wall stabilization design and implementation for a 541 linear ft masonry and concrete gravity-type retaining wall flanking the west perimeter of a 7.37 acre parcel in Bronx, Ne

    Jan 1, 2011

  • DFI
    The Synergy Between Theory And Practice In Geo-Engineering

    By Bas R. Hemmen

    GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper

    Jan 1, 2006

  • DFI
    Parking Garage Supported on Re-Used Caissons and Composite Caisson Micropiles

    By Seth Robertson, Alex Ciccone, Lawrence Johnsen, James Davis

    The most sustainable foundation is the one that is already in place. That doesn’t mean it is the easiest to RE-use. This was realized when replacing a multi‑story hospital parking garage in Hart

    Oct 7, 2024

  • DFI
    Prediction Of Jet Grout Column Diameter In Cohesive Soil

    By Chu E. Ho

    Current methods of determining jet grout column diameters are highly empirical and site specific, and do not take into account the jet hydrodynamics and soil parameters explicitly. A theoretical model

    Jan 1, 2006

  • DFI
    Sand Compaction Piles ? Synopsis

    By A. Holeyman

    The displacement compaction piles described in the paper are installed using a heavy casing or tube and an internal drop hammer. The casing which initially is closed at the bottom by a sand plug displ

    Jan 1, 2010

  • DFI
    Application Of Neurofuzzy Approach To Estimate Duration And Evaluate Delay For Diaphragm Wall And Barrette Construction

    By Thoedtida Thipparat

    The diaphragm walls and barrettes are very important to the constructions of multi-storeyed buildings, elevated expressways, subway railway stations, etc. Uncertainties particularly increase in accord

    Jan 1, 2006

  • DFI
    Safe Execution Of Special Foundation Works Analysis - Concept - Implementation

    By Walter Ensinger

    Special foundation works is one of the most innovative sectors in civil engineering and construction. Both engineering techniques and construction machinery are undergoing continu­ous further developm

    Jan 1, 2002

  • DFI
    Comparison of Static Lateral Behavior of Vertical and Battered Pile Groups of the I-10 Twin Span Bridge Using Finite Element Simulation

    By Ahmad F. Souri, Murad Abu-Farsakh

    "In this study, the static lateral resistance of vertical and battered pile groups was analyzed using 3D finite element analysis. The battered pile group finite element model was verified using the re

    Jan 1, 2017

  • DFI
    Model Specification Helical Anchor Foundations Tension Applications

    "This model specification includes sample text shown in normal font with commentary in italics. The commentary is intended to highlight project-specific items the specification writer should consider

    Jan 1, 2016

  • DFI
    Design Of Sheet Piling For The Prague Metro Line C

    By Jan Pru?ka

    This paper describes the sheet pile design for the Line C extension from Ládví station to the North of Prague. The first part of the paper describes the geological conditions and structural configurat

    Jan 1, 2011

  • DFI
    Berminghammer II 25 Vertical Travel Lead System: Innovative Technology For Deep Foundation Soil Mixing - 0.0 Introduction

    By Andy Schroeder

    Located in Hamilton, Ontario Canada, Berminghammer Foundation Equipment, is a manufacturer of advanced foundation equipment with 30 years of experience. The company is represented in more than 20 coun

    Jan 1, 1997

  • DFI
    Instrumentation And Interpretation ? Introduction

    By H. Mori

    The session chairman, Dr. H. Mori, welcomed the delegates to Discussion Session 8. AUTHORS PRESENTATIONS 1 . G. Price, Building Research Establishment. UK Mr. Price expanded on the content

    Jan 1, 1991

  • DFI
    Recent Advances In Large Diameter Diaphragm Wall Shafts

    By Benoit Virollet

    Over the last 10 years the diameter of unbraced, unlined and unanchored circular shafts has grown dramatically in many parts of the world. This progress has taken place through improvements in: constr