    New Possibilities for Quality Assurance of Diaphragm Wall Joints

    By Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider

    "Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc

    Jan 1, 2014

  • DFI
    Influence of Presence of Overlaying Sand on Rock Socket Length of Bored Pile

    By Priyadharshini M. R., Premalatha K

    "Abstract With the development in the construction of heavily loaded structures, the necessity of pile foundations has increased. For the transfer of heavy loads, it is mandatory that the piles need t

    Jan 1, 2014

  • DFI
    Old Sewer, Big Risks: Managing Risks During The Design And Construction Of A 21-Story Building Adjacent To A Critical 100-Year-Old Sewer Structure

    By Damian R. Siebert

    Risk-reduction measures implemented during the design and construction of a 21-story pile-supported building adjacent to a below-grade 100-year-old sewer structure were keys to a successful foundation

    Jan 1, 2011

  • DFI
    Bell Bottom Cast-In-Place Piling By Reverse Circulation Drill ? Synopsis

    By T. Soejima

    In recent years, there has been a tendency in the field of foundation piling works to utilize piles of greater bearing capacity in order to meet increasing height and weight of modern building as a me

    Jan 1, 2010

  • DFI
    Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? Introduction

    By Daniel L. Hanson

    This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently

    Jan 1, 1994

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2002

  • DFI
    Soil Grouting to Arrest Foundation Settlement

    By Anuj K. Singh, Shuvranshu Rout, Manos De

    "Foundation for tracks of coke transfer car and dust extraction pipe was designed as series of isolated foundations spaced at 11.0m along length of coke oven battery resting on soil at depth of 2.5m.

    Jan 1, 2017

  • DFI
    Development Of Design Practice For Piles In Stiff Glacial Till

    By Kenneth Gavin

    Design practice for piles installed in Irish glacial till has developed in an ad-hoc manner, based on the results of un-instrumented load tests. This had led to designers using similar design paramete

    Jan 1, 2009

  • DFI
    Amsterdam North South Line Metro - Construction Of Deep Diaphragm Walls For Three Underground Stations.

    By Theo. A. M. Salet

    The historic centre of one of the most beautiful cities in Northern Europe -Amsterdam - is being excavated to accommodate the new North/South metro line. This new line is due for completion in 2012, a

    Jan 1, 2006

  • DFI
    Simulation of Brittle Failure of Cement Treated Soil Using Smoothed Particle Hydrodynamics

    By Tomohide Takeyama, Yuki Yoshida, Masaki Kitazume

    "Abstract A series of centrifuge model tests was conducted to investigate the failure pattern and stability of cement treated clay ground having an unsupported vertical slope. The model ground was sub

    Jan 1, 2014

  • DFI
    General Reports - Session 1 - General Report- Deep Excavations "He Who Pays The Piper Calls The Tune"

    By Tim Chapman

    This general report considers what promoters of deep basement projects want from their teams and whether they get it often enough. Most large projects are based on complex financial models where the f

    Jan 1, 2006

  • DFI
    New Technology For An Old Seawall: Micropile Installation At Ellis Island National Park In New York Harbor

    By Helen D. Robinson

    The seawalls that surround Ellis Island were constructed in the early 1900s and now show varying degrees of deterioration. An innovative approach to the structural repair of the seawalls was develope

    Jan 1, 2008

  • DFI
    Micropiles At The Transformation Ago Project

    By Jim Bruce

    The Transformation AGO project, constructed between 2005 and 2008, featured a foundation trade contract that included design of pile caps and grade beams and construction of 138 permanent micropiles.

    Jan 1, 2011

  • DFI
    Innovative European Technologies To Accelerate Construction Of Embankment Foundations - Part I: GEC, AUGEO & CFA

    By Ali Porbaha

    In today's fast-track construction environment, owners are searching for non-conventional technologies to build their projects faster and safer while maintaining traffic flow during construction.

    Jan 1, 2002

  • DFI
    Construction Of Long Tubular Column Foundations Under Deep Water ? Synopsis

    By C. L. Liao

    The chief experiences for constructing deep tubular columns foundation under deep water are as follows: 1. P.C. tubular columns were sunk inside the caisson. 2. P.O. tubular columns of 3.6 M. diameter

    Jan 1, 2010

  • DFI
    Urban Legends: Two Case Studies That Redefine "Impossible"

    By Grant R. J. Bearss

    Due to environmental concerns in urban construction, many typically simple projects become very complex or feasibly impossible. The introduction of relatively new concepts has redefined "impossible",

    Jan 1, 2002

  • DFI
    Methods Of Constructing Concrete Piles On Heavily Contaminated Sites

    By N. C. Matheson

    The West's Shell Pile has been used on sites with very soft ground conditions for over 60 years. Fibre reinforced precast concrete shells 900mm long are threadled onto an internal mandrel which c

    Jan 1, 1989

  • DFI
    Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? Introduction

    By Brian R. Zuckerman

    The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State

    Jan 1, 2002

  • DFI
    Driven Pile Cost Comparison For Two Large Wisconsin Dot Bridge Projects

    By Van E. Komurka

    This paper presents a cost comparison of the driven pile foundations for two large Wisconsin Department of Transportation (?WisDOT?) projects in Milwaukee, Wisconsin: the Marquette Interchange South L