  • DFI
    Resonant Pile Driving - Part I - The Promise & The Reality - Part II - Soldier Pile Installation - Light Rail Transit - Buffalo, New York - 1. Historic Background.

    By D. R. Dance

    The Resonant, or as it has more commonly come to be known the 'Sonic' Pile Driver, dates back to the early 1960's, when prototypes were produced by Charlie Guild, of Providence, Rhode I

    Jan 1, 1987

  • DFI
    Application Of The Dynamic Increasing Energy Test (DIET) In Load Transfer Analysis Of Precast Piles Driven In Soft Clay Formation

    By Jean Balech

    This paper presents some results of dynamic loading tests performed on concrete piles driven in soft clay formation. The load transfer mechanism, measured in the dynamic increasing energy test (DIET),

    Jan 1, 2002

  • DFI
    Analysis Of Piles Reinforced By Jet-Grouting Method

    By JO Choi

    Jet-grouting method is a useful technique to reinforce foundations on relatively soft or vulnerable soil layers such as fractured zone and stratum with cavities. Although jet-grouting has been widely

    Jan 1, 2006

  • DFI
    Jet Grouting And Safety Of Tuttle Creek Dam

    By Timothy D. Stark

    Jet grouting has increasingly become a ground improvement technology used to address seepage concerns and provide strength improvement to soils underlying dams. The technique of jet grouting uses high

    Jan 1, 2012

  • DFI
    Impact Of Environmental Regulations On Pile Foundation Design And Construction Using Diesel Hammers

    By R. D. Short

    Environmental regulations for noise and air pollution are directly affecting the type of equipment and construction techniques being utilized for pile driving construction using diesel hammers in Cali

    Jan 1, 1989

  • DFI
    Reducing Downdrag Loads With Bitumen

    By J. -L. Briaud

    This presentation shows the results of laboratory and field tests to date for the NCHRP project entitled "Downdrag on Bitumen-coated Piles". This project required to test a variety of bitumens in the

    Jan 1, 1991

  • DFI
    Wave Equation Technique For Estimating Driven Pile Capacity

    By Luo Yang

    A one-dimensional wave equation based algorithm for estimation of shaft and toe resistance of driven piles using High Strain Testing (HST) data is presented. The pile is represented by a uniform elast

    Jan 1, 2006

  • DFI
    Session 22 "Compaction Grouting and Limited Mobility Grouting"

    By Allen Cadden

    The type of soil we had was a silty fine sand. It had been placed by hydraulic methods in 1904 so it was quite clean I would say less than 10% silt the rest of it was very loose sand. That I'm n

    Feb 10, 2003

  • DFI
    Nonlinear Spring Functions For 3-D Seismic Responses Of Structures On Piles

    By Nien-Yin Chang

    The contemporary seismic response analysis of structures using a finite element analysis code requires six elastic spring constants to address the six degrees of freedom ground/foundation contribution

    Jan 1, 2007

  • DFI
    Bacteria Help Civil Engineers; Report Of A Pilot Project

    By John W. M. Lambert

    This paper describes the execution and the results of a new method to seal off leaks in water retaining constructions. The new method, called BioSealing is based on activating the bacteries, present i

    Jan 1, 2006

  • DFI
    Resonance Test On Piles - Synopsis

    By Y. Z. Xu

    This paper presents a new dynamic method called Resonant Pile Test (HPT) for evaluating bearing capacity of pile. The basic conception of RPT is given in brief and the measuring system is also introdu

    Jan 1, 2010

  • DFI
    Wharf Damage Due To Settlement Of Deep Soft Subsoil ? Synopsis

    By Z. Y. Ding

    This paper emphasize two points in piled wharf design which are important than structure calculation. First, during design of piled wharf on soft stratum, the bank slope stability is the first importa

    Jan 1, 1991

  • DFI
    Construction Technique Used To Build The Drilled Shafts For The Victory Bridge

    By T. Jason Hardell

    The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin

    Jan 1, 2005

  • DFI
    Design Optimization - Drilled Shafts Installed In Sand, Gravel And Cobble Formation

    By Emad Farouz

    The resistance of very dense glacial outwash formations consisting of sand, gravel and cobble formations can be quite high, and techniques for measuring the strength and deformation properties often c

    Jan 1, 2006

  • DFI
    Arctic Emergency Operation: Deception Bay Rehabilitation

    By Jeff Starchuck, Harald Kullmann

    "In 2005, an inspection showed that the Deception Bay Wharf in the Canadian Arctic was at the end of its service life. Although Deception Bay is closed with landfast ice up to 5 ft thick, shipping ope

    Jan 1, 2009

  • DFI
    Piled Raft Design For High Rise Buildings In East London, UK

    By D. P. Nicholson

    The current phase of office development at Canary Wharf in the London Docklands includes twelve multi-storey buildings varying from eighteen to forty stories in height. The area of Canary Wharf South

    Jan 1, 2002

  • DFI
    Reliability of the Bearing Capacity of Axial Piles Using In Situ Tests

    By António A. Henriques, António Gomes Correia, Ana Teixeira

    "Abstract Pile foundations are often used for important structures, and thus, reliability evaluation is an important aspect of the design. Reliability methods have become increasingly important as dec

    Jan 1, 2014

  • DFI
    Evaluation Of Achievable Column Diameter In Jet Grouting

    By Chu E. Ho

    Key variables that govern the jet cutting process are examined based on fundamental theories of jet hydrodynamics and soil mechanics. Under normal conditions of jet grouting operations, lift speed and

    Jan 1, 2006

  • DFI
    Drilled Shaft Inspector's Manual - 1.0 General - 1.1 Scope And Limitations

    The intent of this manual is to provide guidelines for inspectors of drilled shaft construction otherwise referred to as drilled piers, caissons or bored piles. It should also be helpful to train begi

    Jan 1, 2004

  • DFI
    Drilled Pier Foundations for Mercedes-Benz Stadium

    By Jean Wehbe, Daniel C. Brahana

    "The new Mercedes-Benz Stadium (MBS), home of the Atlanta Falcons, is part of a new era of stadium construction in the U.S. These new-age stadiums are larger and have more amenities than their predece

    Jan 1, 2016