    Role Advanced Technology - Resolve Inherent Dichotomy In High Strain Dynamic Testing

    By Achyut Kumar Allady, Praveen Arumughan

    NCHRP Synthesis 418 (2011) entitled, “Developing Production Pile Driving Criteria from Test Pile Data” details the occurrence of dichotomy between pile Skin resistance and pile Tip resistance mobiliza

    May 1, 2022

  • DFI
    Steel H-Section Piles Support 2,120-Foot Long Cable Stayed Bridge Verona Island And Prospect, Maine

    By James W. Weaver

    The 2,120-foot long cable stayed Penobscot Narrows Bridge that carries US Route 1 over the Penobscot River between Verona Island and Prospect, Maine is supported on four foundation units, one below ea

    Jan 1, 2011

  • DFI
    Drilled Pier Foundation with Ground Improvement Using Cement Deep Soil Mixing for Highway Bridges

    By Shahriar Vahdani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles of highway, including seven bridges, three cut-and-cover tunnels, and an undercrossing connecting the Golden Gate Bridge to the C

    Jan 1, 2014

  • DFI
  • DFI
    PPP Contract Delivery System- Contractual Risks and Ethical Issues Regarding Deep Foundation Subcontractors

    By Alexander Filotti, Richard Kalson

    "1. INTRODUCTION- WHAT IS P3 OR PPP ?The Public Private Partnership (PPP or 3P) is a project delivery scheme based on the government providing land and/or a concession agreement, and on a private enti

    Jan 1, 2017

  • DFI
    Load and Resistance Factor Design – Past, Present and Future

    By Silas C. Nichols, Jennifer E. Nicks

    "Limit states design (LSD), or load and resistance factor design (LRFD), is a method to account for the uncertainty in loads and resistance through a reliability calibration that requires all applicab

    Jan 1, 2015

  • DFI
  • DFI
    Foundation Reuse: Overcoming Resistance

    By Sara Anderson, Rachel Nicholls, Tim Chapman, Janice Windle

    "In city center sites around the world, and in particular in London, foundation reuse is becoming increasingly widespread as the ground is filled with detritus from previous developments. This paper s

    Jan 1, 2005

  • DFI
    Bay Park Conveyance Project: SOE for 14 Shafts on a Microtunnel Alignment

    By Renee Fippin

    Several projects are underway in Nassau County, New York, to improve water quality in the Western Bays of Long Island. A major piece in accomp­lishing this is the Bay Park Conveyance Project. When com

    Feb 1, 2024

  • DFI
    Outstanding Issues In Understanding The Behaviour Of Thermally-Activated Pile Foundations

    By Teresa M. Bodas Freitas, Arianna Lupattelli, Peter J. Bourne-Webb, Diana Salciarini, Martina Zito, Donatella Sterpi

    The thermomechanical response of thermally-activated (TA) piles under monotonic thermal loads is quite well understood and the remaining uncertainties relate to the effect of long-term, cyclic loading

    May 1, 2022

  • DFI
  • DFI
    Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)

    By Anne Lemnitzer

    Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group

    Jan 1, 2010

  • DFI
    Jet Grouting Soft Clays for Tunnelling & Deep Excavations Design & Construction Issues

    By Marcelo Chuaqui

    We certainly have the data to back calculate it. I must admit that I haven't, at the moment my priority is not on what is the stiffness of the jet grout but is making sure that the jet grout is r

    Feb 10, 2003

  • DFI
    Axial Pile Displacement Evaluations From Seismic Piezocone Data And Back-Analysis Of Load Tests

    By Fawad S. Niazi

    Ever since the use of the cone penetration test (CPT) in geotechnical practice, attempts have been made to correlate CPT parameters with pile capacity components of unit end bearing (qb) and unit shaf

    Jan 1, 2011

  • DFI
    Statnamic Pile Testing Case Studies

    By Michael J. Brown

    It is often necessary to undertake some form of pile testing to verify design calculations. Historically this has been limited to static and dynamic tests. Newer rapid testing methods such as Statnami

    Jan 1, 2006

  • DFI
    A New Method of Quality Control for Construction Joints in Diaphragm Walls

    By Nikolaus Schneider

    "Abstract: The combination of failure in joints of diaphragm walls and their exposure to water pressure may have far reaching effects ranging from water leakage to the risk of catastrophic loss of sta

    Jan 1, 2014

  • DFI
    Evaluation of Existing T-Z Models for Caliche Based on Numerical Analysis of Bi-Directional Load Tests Using NVShaft

    By Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan, Joseph Toth

    The difficulty in material characterization and the erratic response of cemented soil layers, such as caliche in the Las Vegas valley, creates challenges for practicing engineers to reliably predict t

    Sep 8, 2021

  • DFI
    Non-Destructive Testing Methods For Drilled Shaft And Acip Piles

    By George Piscsalko

    There are numerous methods currently available to assess the integrity of drilled shaft and ACIP piles. Each method has its advantages and limitations. This paper will compare the various available me

    Jan 1, 2011

  • DFI
    Capacity Of Driven Piles In Sand

    By Mohab Sabry

    Pile foundations are used extensively around the world to support both inland and offshore structures, including important structures such as nuclear plants and oil drilling platforms. The limit of th

    Jan 1, 2006

  • DFI
    Deep Foundations for the Bangkok MRT Chaloem Ratchamongkhon Line Metro Project

    By Peter A. Thompson, Richard E. Prust

    "The Bangkok Mass Rapid Transit (MRT} Chaleom Ratchamongkhon Line project is the first underground subway to be completed in Thailand. It consists of 22 km (14 miles) of twin-bored tunnels and 18 cut

    Jan 1, 2005