Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Explosives Selection to Minimize the Risk of Dust Explosions in Underground Mines

    By Q Liu, P D. Katsabanis

    Dust explosions in underground sulphide and oil shale mines result from the detonation of explosives in the blasting operations. Explosive composition, oxygen balance, priming and ideality of detonati

    Jan 1, 1991

  • ISEE
    Dead-pressing Phenomenon in Emulsion Explosives

    By Shulin Nie

    The dead-pressing phenomenon in emulsion explosives is wellknown. Research work on this subject has been carried out at the Swedish Detonic Research Foundation for the last few years. Several experime

    Jan 1, 1993

  • ISEE
    ANFO’S Behavior in Height-To-Detonation and other Thermal Stimulus Tests

    By E. Contestabile, B. von Rosen, P. Lightfoot

    As part of an accident investigation ANFO was subjected to various abusive tests. A tractor-trailer carrying 18,000 kg of blasting explosives, caught fire, burned for approximately 30 minutes, and the

    Jan 1, 2001

  • ISEE
    Changing Borehole Length to Improve Breakage: a Case History

    By Norman S. Smith, Richard L. Ash

    Many factors affect rock fragmentation from blasting. One variable seldom considered when designing blasts, however, is the borehole length. An example is described of how the length was adjusted to g

    Jan 1, 1976

  • ISEE
    In-situ Fracture Stimulation: A State of the Art Review

    By Mario Karfakis, G. Langlois

    Well stimulation is the process by which any production well, whether for production (extraction), storage (injection) or deep interaction (remediation, monitoring, etc) can be made or stimulated to f

    Jan 1, 2009

  • ISEE
    Blast Damage Control During Underground Mining

    Tracer blasting is commonly used in Canadian underground mines for overbreak control. It involves tracing a column of ANFO with a low strength detonating cord. In order to investigate the effectivenes

    Jan 1, 1994

  • ISEE
    Large Diameter and Deep Hole Presplitting Techniques for Safe Wall Stability (702d8f82-2979-48dc-9390-2e853856733d)

    By Tom McDonald, Rodney Burke

    As mining progresses in the West, the depth of material has increased, making highwall stability a major factor in safety and production. The Jim Bridger Coal Mine has made highwall stability a priori

    Jan 1, 1997

  • ISEE
    Dri-Gel Explosives

    By Mike Zimmermann

    With the steady decline in the production of dynamites throughout the world, a gap appeared in the market which could only be adequately filled by rigid paper packaged explosives. To fill this need, t

    Jan 1, 1998

  • ISEE
    Effect of Blast Preconditioning on Communition for Selected Rock Types

    Current research in comminution includes efforts to increase the efficiency of mineral processing systems and reduce the amount of electrical energy needed for size reduction. In most mining operation

    Jan 1, 1996

  • ISEE
    A History of Explosives Use by the Forest Service Rocky Mountain Region

    By Raymond V. Adolphson

    Use of explosives effectively and safely has come a long way since its discovery and early stages of development. The need to objectively and functionally train personnel in the safe and effective use

    Jan 1, 1978

  • ISEE
    Attenuation of Blasting Vibration in South Florida

    By Greg Mclellan, Mark Johnson, John Pepper

    Several large quarrying projects recently occurred in Miramar, Florida. These were closely monitored by the Seismologist of Record and Broward County in accordance with County and City regulations. In

    Jan 1, 2000

  • ISEE
    Precision-Scale High-Explosive Water Shock Experiments

    By Charles E. Joachim, Christo V. Lunderman, Charles R. Wdch

    The U.S. Army Engineer Waterways Experiment Station (WES) recently conducted a series of precision-scale water shock experiments which consisted of the detonation of several 8-gram, 10-gram, and 12-gr

    Jan 1, 1998

  • ISEE
    Prediction of Dynamic Response of Ground due to Blast Loading

    By Chang-Ha Ryu, Hyung Yang, Hyung-Sik Yang

    Ground vibration by rock blasting causes many environmental problems to adjacent structures and human bodies. Growing concerns have been given to the effects of dynamic loading induced by blasting wor

    Jan 1, 2001

  • ISEE
    The Approval and Use of Explosives in Coal Mines

    By Joseph L. Uraco, Harry C. Verakis

    The use of explosives in underground coal mines presents a potential risk for serious injuries and death to miners. Widespread disasters have occurred from the explosion of methane and/or coal dust in

    Jan 1, 1992

  • ISEE
    The Demolition of the 900-Foot Multiflue Matla Stack in South Africa

    By James H. Redyke

    In August, 1980, while finishing construction of the new stack, one of the flues mysteriously collapsed, killing three people and injuring several others. Several months later a British international

    Jan 1, 1982

  • ISEE
    Public Perception of Blasting at Rock Quarries in Expanding Urban Environments - St. Charles County, MO

    By Paul Worsey, Braden Lusk

    Differences exist between public perception of construction blasting and quarry blasting. In general, people are able to tolerate short term inconveniences much better than long term ones. The paper f

    Jan 1, 2005

  • ISEE
    Marine Drilling and Blasting the Central Artery / Third Harbor Tunnel Project Boston, Massachusetts

    By Gerard O'Brien, Douglas Comstock

    "The construction of the Third Harbor Tunnel is the first major portion of the Central ArteryProject. The tunnel is designed to connect South Boston to East Boston to alleviateautomobile congestion th

    Jan 1, 1993

  • ISEE
    Oil & Gas Well Perforating the Other Explosive Industry

    By Richard Arsenault

    The production of oil & gas from wells requires method of flow from the producing formation into the well bore. Once the well is drilled it will have casing pipe installed to protect the integrity of

    Jan 1, 2007

  • ISEE
    Inaccurate Blasthole Drilling

    By Alan R. Cameron, William W. Forsyth, Tom H. Kleine

    In the production environment, the current limits of blasting are most often defined by the ability of the operator to drill blastholes from a planned collar location to the required toe location. Man

    Jan 1, 1995

  • ISEE
    Careful Blasting in Greenland A Case Story of 4 Major Blasting Projects 1986-88

    By Erik K. Lauritzen, Jorgen Schneider, Niels Madsen

    From 1986 to 1988 Kalaallit Tunisassiorfiat (KTU)/Gronlands Hjemmestyres Produktionsvirksomhed (the part of Greenland's own governing body which is in charge of production activities) has been respons

    Jan 1, 1989