  • ISEE
    Explosive Energy Concept for Drill Productivity & Higher Overall Productivity at Reduced Excavation Costs

    By Satish R. Kate

    Explosive is a chemical energy, which on detonation is released instantaneously with extremely high speed and under high pressure. It is used to meet the basic requirement for breaking of rocks. The p

    Jan 1, 1998

  • ISEE
    Charleroi Locks and Dam - Old River Wall Explosive Demolition - Final Stage - Phase 2

    By David Harrison, Brian Harrison

    The Army Corps of Engineers completed the Charleroi Lock and Dam in 1932. It is located on the Monongahela river approximately 22 miles (35k) south of Pittsburgh in Charleroi, Pennsylvania. It is comp

    Jan 1, 2018

  • ISEE
    Vertical Retreat Mining of Drop Shafts Saves Time and Money on Atlanta’s West End CSO Tunnel Project

    By Adam Stremcha, John MacGregor

    Initial planning called for 3 separate drop shafts and 3 separate vent shafts to be pulled back from the excavated tunnel with a large diameter raise bore machine. With time constraints and the raise

    Jan 1, 2010

  • ISEE
    Traffic Tunnels in Rock - Guide Levels for Blast-Induced Vibrations

    By Sven-Erik Johansson, Gosta Rundqvist, Donald Jonson

    In Stockholm a new road traffic system called Södra Länken (Southern Link) will be in operation in late 2004. The total length of the road system is 6 kilometres of which 4,5 kilometres run through tu

    Jan 1, 2004

  • ISEE
    Technical Review of Safe Blasting Design at Limited Distance

    By Agus Setiabudi

    East Pit Wira II Project in South Kalimantan, Indonesia with a radius of <500 meters (1,640 ft) from residential has about 454,168 tonnes of coal reserves, with a total remaining reserves of 3,369,383

    Jan 1, 2014

  • ISEE
    Cumberland Gap Tunnels; Controlled Excavation With Complex Geology

    By Tom Short

    The contract to drive twin 4,100 foot (1250.5m) long tunnels under the existing Cumberland Gap highway was awarded to a Joint Venture of S.A. Healy of Chicago, Illinois and Lodigiani USA of Fairfax, V

    Jan 1, 1993

  • ISEE
    Blasting Optimization using 3D Photogrammetry in a South Brazilian Quarry

    By L. O. Souza, J. F. Gewher, M. P. Scussiatto, C. S. Mendonca, R. A. McClure, B. T. Kuckartz, J. Kloeckner

    Blasting is the most effective and economical tool available to fragment and move rock for most applications. If properly executed, it can improve down-stream operations such as loading, hauling and c

    Jan 1, 2013

  • ISEE
    Fragmentation Mill Throughput Improvement Through a Dual-Salt Sodium Nitrate Emulsion Product

    By Khushaal Popli, Vanessa Roeland, Brian Hall, Carl Diederichs

    Highland Valley Copper (HVC) has embraced an integrated Mine to Mill approach to comminution since the late 1990s. Previous blasting optimization was carried out through adjustments to blast pattern g

    Feb 6, 2023

  • ISEE
    Journal: 100 Years / As you can see above, the title of these articles includes the words “More or Less.” In this issue I’m going to take advantage of that, and print a few things that I’d never be able to share if I adhered strictly to the “100

    By Robert Hopler

    GEO. M. MOWBRAY’S REFRIGERATOR CAR FOR THE SAFE CONVEYANCE OF EXPLOSIVES. It is a fact well known to all miners who have used nitro-glycerin, or any of its adulterations, commonly known as dynamite, r

    Jan 1, 2011

  • ISEE
    Cross Sectional Shape Effects on Small Explosives Driven Shock Tubes

    By Ethan Steward, Robert Eades, Kyle Perry

    Shock tubes, either gas or explosively driven, are often used for physical modeling of free field explosions or arena testing. The use of shock tubes often requires less setup time of subjects and sma

    Jan 1, 2018

  • ISEE
    Full-Face Blast Rounds in Shaft Sinking with Electronic Delay Detonators - a Critical Appraisal

    By B Mohanty

    Full-face blasting rounds have been used to excavate a 4.6-mdiameter shaft at Atomic Energy of Canada Limited's Underground Research Laboratory near Pinawa, Manitoba. Both standard pyrotechnic delay d

    Jan 1, 1990

  • ISEE
    Underwater Plug Blast at Manic-C Hydro-Electric Project

    By P Albert

    A wedge-shaped underwater rock plug has to be blasted in order to tap the reservoir and furnish water to a new underground powerhouse at Manicouagan-5. The paper deals with the design and engineering

    Jan 1, 1984

  • ISEE
    Reducing Eyebrow Break Caused by Rock Blasting in Malmberget Mine (86e4ad65-d689-43b3-b42e-a83837151808)

    By Z X. Zhang

    In sublevel caving mines, eyebrow break usually gives rise to lower ore recovery and worse safety in the field. Eyebrow break is caused mainly by two tensile stress waves: one from the front surface o

    Jan 1, 2011

  • ISEE
    Deep Water Blasting on the River Nile in Southern Egypt

    By Rob Grant, Manuel Lopez Cano, Mike Briggs, Ken Fletcher

    The scorched desert sands and life giving waters of the River Nile in Egypt have been the back drop to awe inspiring engineering feats for over 4,700 years. The latest engineering marvel to grace the

    Jan 1, 2004

  • ISEE
    Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" Dam

    By Jennifer Williams, Donald J. Berger

    Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of

    Jan 1, 2014

  • ISEE
    Journal: You Be the Judge - A Study on Ethics

    The following situation was submitted as an ethics case study for inclusion in the Journal. To the best of our knowledge, they are based on actual circumstances encountered in the field. Blowing the W

    Jan 1, 2007

  • ISEE
    Design of a Passive Underwater Pressure Gauge

    By S. Lim, G. Walsh, V. Romero

    The cable television show, Mythbusters, contacted the New Mexico Institute of Mining and Technology requesting a pressure gauge to be used in underwater testing. The requirements for the gauge were: i

    Jan 1, 2009

  • ISEE
    Pitfalls of Residential Blasting—Experiences of a Field Blaster

    By Chuck Kliche, Bill Clements

    This paper relates some of the experiences, good and bad, of blasting adjacent to residences of the primary author during his 15+ years of field blasting in the Northern Great Plains region. During th

    Jan 1, 2009

  • ISEE
    Estimating Underground Mine Damage Produced by Blasting

    By Thomas E. Ricketts

    An important part of underground mine planning and operations involves the reclamation of working areas after blasting before the mining cycle can continue. This is especially true for mining that mus

    Jan 1, 1988

  • ISEE
    2000 Blasting in the New Millennium - Timely Claims Reporting Can Make A Big Difference

    By Steve Dillingham

    A blast site incident has just occurred. Tensions are high, and, as the blaster, you’re in charge of the crisis at hand. Your mind is reeling, your thoughts frantic. The main areas of concern for you