Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Design and Management of Wide Roadways in Australian Coal Mines

    By Rob Thomas

    "In Australia, a wide roadway is commonly defined as any roadway that is driven to a width greater than 5.5 m (18 ft). These roadways are typically required to enable the installation of longwall equi

    Jan 1, 2010

  • SME-ICGCM
    The NIOSH Shield Hydraulics Inspection and Evaluation of Leg Data (Shield) Computer Program (7f22bea3-620b-4bd0-a4b9-04ee2b01eea7)

    By Thomas Barczak

    Longwall shields provide essential ground control in Iongwall mining, yet a high percentage of shields are operating at less than peak capacity and many at well below the rated support capacity due to

    Jan 1, 2002

  • SME-ICGCM
    Comparison of the Mark-Bieniawski and Wilson Pillar Equations Using Site Specific Data

    By Vincent Scovazzo

    This paper compares the two most common pillar design equations used worldwide by John T. Boyd Company; the Mark-Bieniawski Equation, an empirical approach, and the Wilson Equation, an analytical appr

    Jan 1, 2008

  • SME-ICGCM
    Behavior of Welded Wire Mesh Used for Skin Control in Underground Coal Mines

    By Murali M. Gadde

    Welded wire mesh is the most commonly used skin control technique in the United States underground coal mines. Currently, selection of the mesh is based on trial and error rather than any rigorous des

    Jan 1, 2006

  • SME-ICGCM
    Updating the NlOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design Features

    By Thomas M. Barczak

    The initial Support Technology Optimization Program (STOP), Version 1.0, was released at the 19th Gmund Control Conference. This original program has since been updated to Version 2.3 which was releas

    Jan 1, 2001

  • SME-ICGCM
    Evaluation Of Support Performance In A Highly Stressed Mine

    By Hamid Maleki

    The U.S. Bureau of Mines implemented a monitoring program in a western U.S. coal mine for the evaluation of both conventional and alternative support systems. The conventional support consisted of 2.5

    Jan 1, 1994

  • SME-ICGCM
    Prediction Of Subsurface Subsidence For Longwall Mining Operations

    By Yi Luo

    Subsurface strata movements and deformations associated with underground mining activities could cause problems to subsurface structures and water bodies. By incorporating the methods for surface subs

    Jan 1, 2000

  • SME-ICGCM
    Violent Coal Pillar Collapse -A Case Study

    By André Zingano

    Pillar collapses have been studied for several years and can be classified into two types: nonviolent squeeze or violent pillar collapse, i.e., controlled or uncontrolled pillar collapse. Underground

    Jan 1, 2004

  • SME-ICGCM
    An Investigation Into The Effectiveness Of Support Systems Combining Steel Supports And Rock Bolts Within Coal Mine Roadways

    By D. Reddish

    The combination of free standing steel supports, such as arches, and rock bolts (mixed support) has Frequently been in used in UK coal mine roadways when it is considered that the strata and/or enviro

    Jan 1, 2004

  • SME-ICGCM
    Optimun Mining Plan for Multiple Seam Mining

    By Wen H. Su

    Multiple seam mining and its associated problems are very serious in Southern West Virginia where poor planning or lack of knowledge in seam interaction often results in complete loss of coal propert

    Jan 1, 1984

  • SME-ICGCM
    Subsidence Prediction In Illinois Coal Basin

    By Ed D. Doney

    Based on the subsidence data collected through a comprehensive subsidence monitoring program con: ducted over two longwall panels in an Illinois coal mine, mathematical models have been proposed for p

    Jan 1, 1990

  • SME-ICGCM
    Support Resistance And Roof Behaviour Of A Longwall Face With 4-Leg Shields

    By S. S. Peng

    The hydraulic powered supports have been employed in U. S. longwall mining for the past two decades. Yet the sciences of roof control at the powered supported faces remain largely unknown. In order to

    Jan 1, 1982

  • SME-ICGCM
    25 Years of Progressive in Numerical Modeling for Ground Control ? What Have We Accomplished and Where Do We Go Next?

    By Keith A. Heasley

    Exactly 25 years ago this month (August 12, 1981), IBM introduced the ?Personnel Computer? with a 16 bit operating system called MS-DOS 1.0. Since then, Moore?s Law, which essentially states that

    Jan 1, 2006

  • SME-ICGCM
    Longwall Moves At Twentymile Recovery Mesh System

    By Michael A. Berdine

    In early 1997, Twentymile Coal Company took a dramatic departure from traditional longwall recovery methods. Previously, Twentymile's standard longwall meshing procedure included the use of chain

    Jan 1, 2001

  • SME-ICGCM
    Seismic Tomography, an Ideal but Immature Tool for Coal Bump Prediction

    By Erik Westman

    Coal bumps remain one of the industry?s most devastating but least understood phenomena. If changes to the internal conditions of the rock mass could be observed there is hope that bumps could be fo

    Jan 1, 2008

  • SME-ICGCM
    The Origin and History of U.S. Mine Resin

    By Carl Tom Blevins

    Resin was first introduced to U. S. mines in 1971 and first produced in 1973. The original polyester roof bolt resin was very expensive and limited to a single cartridge size and a single slow gel ti

    Jan 1, 2006

  • SME-ICGCM
    Study on Environmental Management of Mining Subsidence Areas

    By Weijia Guo

    With the exploitation of coal resources, a large area of land had been affected by surface subsidence, causing conflicts between man and land to become more conspicuous by the day, affecting the life

    Jan 1, 2006

  • SME-ICGCM
    Ground Control In Multiple Seam Mining

    By Robert A. Stansbury

    The No. 14 Mine of United States Steel Corp- oration is located at Munson, West Virginia, in &Dowell County. The mine was originally assigned 7,530 acres of Pocahontas 3, 4 and 5 Seams. Production beg

    Jan 1, 1981

  • SME-ICGCM
    Numerical Modeling of Stress Distribution of Gateroads Subjected to Dynamic Pressure of Longwall Mining in the Immediate Overlying Seam, a Case Study

    By Ximeng Li

    The entries that are subjected to dynamic pressure are much more difficult to maintain due to repeated disturbance. A case study of an entry stress distribution was performed using the FLAC3D program.

    Jan 1, 2013

  • SME-ICGCM
    Roof-Pillar Interface Affecting the Pillar Behavior

    By Andre Cezar Zingano

    "The empirical approach for pillar design assumes that geological conditions should be perfect, such as horizontal seams, and that pillar strength and behavior will only depend on the coal seam streng

    Jan 1, 2016