Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Non-Destructive Testing Method for Determining the Characteristic Length and Initial Axial Bolt Load and Its Application

    By Houquan Zhang, Yu Wu, Yanlong Chen, Zhenfu Luo, Aihong Lu

    "A non-destructive detection scheme for bolt installation quality was designed by adopting the method of non-destructive detection on bolt installation quality. Based on the field measurements, a rand

    Jan 1, 2016

  • SME-ICGCM
    Determination Of Plate Size Effect On Ultimate Bearing Capacity Of Weak Floor In Underground Coal Mines Using A Boundary Integral Approach

    By Zhanjing Yu

    In this paper, an equation is developed to characterize the relationship between the UBC and plate size using a boundary integral approach. The equation was validated by the results from mo& than seve

    Jan 1, 1993

  • SME-ICGCM
    Analysis on the Dynamics of Mining Subsidence in Range of a Product Transmission Overhead Line

    By Axel Preusse

    A high advance rate of the longwall face increases inevitably the mining dynamics within the rock and on the surface. Measures to limit the mining dynamics are the adjustment of the face advance rate

    Jan 1, 2003

  • SME-ICGCM
    Advances in Remote Sensing Techniques for Monitoring Rock Falls and Slope Failures (17th CONFERENCE ON GROUND CONTROL IN MINING)

    By J. M. Girard

    Ground control problems at surface mining operations can occur for a variety of reasons. Stress, gravity loading, rock strength, geology, pore pressure, weather effects, underground workings, and many

    Jan 1, 1998

  • SME-ICGCM
    Topography and Coal Seam Initial Stress Estimation: a Sensitivity Study

    By Jeffrey K. Whyatt

    Estimation of the initial vertical stress carried in a coal seam is an important first step in virtually all methods of evaluating the required size of pillars in coal mines. Such estimates are a triv

    Jan 1, 2011

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    Proposed Criteria for Assessing Subsidence Damage to Surface Structures

    By Swapan Bhattacharya

    Section 516 of Public Law (PL) 95-87, commonly known as the Surface Mining Control and Reclamation Act of 1977 (SMCRA), requires that underground coal mine operators must 'adopt measures consiste

    Jan 1, 1984

  • SME-ICGCM
    Laboratory and Field Testing of Bolting Systems Subjected to Highly Corrosive Environments

    By Stephen C. Tadolini, John Bolton, Bre-Anne Sainsbury, Tom Meikle

    "The capacity of ground support components which have been affected by corrosion is reduced and may ultimately lead to dynamic failure of the component and the strata. In order to maintain an effectiv

    Jan 1, 2016

  • SME-ICGCM
    Geo-Mechanical Property And Failures Of Weak Roof Shales In Coal Mines

    By Yunqing Zhang

    Weak shales refer to those with lower strength, thinly- laminated structure, sensitivity to moisture and weathering as well as significant time dependent behavior. It has been said that many future co

    Jan 1, 2004

  • SME-ICGCM
    Influence Of Support Capacity And Geometry On Tailgate Support

    By E. Hosca

    Alternative tailgate loading conditions due to conventional and conventional/yield pillar combinations were evaluated to define roof loading. In order to isolate different loading situations, the tail

    Jan 1, 1994

  • SME-ICGCM
    3D FEM Simulation For Fully Grouted Bolts

    By Khaled Morsy

    Most of the available numerical codes simulating the reinforcing effect of fully grouted bolt are accomplished by a series of bar elements which are connected along their length to the host rock by sh

    Jan 1, 2004

  • SME-ICGCM
    Stable Entry Design In A Multi-Seam Environment

    The challenge of planning to minimize interaction effects in multi-seam mining is compounded by the difficulties inherent in extrapolating essential geological and spatial data between sampling points

    Jan 1, 1994

  • SME-ICGCM
    Mapping Hazards With Microseismic Technology To Anticipate Roof Falls - A Case Study (ac4523c6-7bdb-4660-a1cb-20433a65c0ed)

    By Anthony Iannacchione

    As the amount of new fractured surfaces or "damaged rock layers" within roof rock increases, the stability of the rock mass decreases. While direct measurements of this phenomenon are not easily made,

    Jan 1, 2004

  • SME-ICGCM
    Structure, Strength And Relaxation Of Interbuden For Input Into Highwall Mining Design In The Baralaba Coal Measures Of Queensland, Australia

    By Bret E. Leisemann

    The geomechanical environment in which highwall mining must operate represents a hybrid between surface and underground operations. Mine design must take into consideration the complexities associated

    Jan 1, 1993

  • SME-ICGCM
    Prediction Of Shearer Cutting Performance (2d8ef98a-f84a-4c60-8ac8-2edff3e8f14f)

    By D. L. Price

    This paper presents a method of measuring field power consumption of shearers and deriving specific energy consumption versus shearer haulage speed performance curves. A description of a computer prog

    Jan 1, 1992

  • SME-ICGCM
    Application of Microseismic Monitoring to Longwall Geomechanics and Safety in Australia

    By Xun Luo

    In this paper we report on the use of microseismic monitoring techniques to investigate the fracturing process associated with longwall mining. The study was carried out at three mines in Australia an

    Jan 1, 1998

  • SME-ICGCM
    RYBAD Empirical Field Model For Prediction Of Maximum Land Subsidence Associated With Longwall Coal Mining

    By Thomas Rymer

    Mathematical modelling of mine subsidence measured at 21 locations in Pennsylvania and northern West Virginia allows for the refinement of current methods of predicting maximum land subsidence associa

    Jan 1, 1988

  • SME-ICGCM
    Roof Control With Polyurethane For Recovery Of Kitt Energy?s 1000-Foot Longwall

    By J. G. Stewart

    Polyurethane injection for the consolidation and control of broken strata is a common practice in the deep mines in Europe. The technology has gained wide acceptance in the coal mines of America since

    Jan 1, 1984

  • SME-ICGCM
    Site Characterization For Ultra-Close Multi-Seam Mining

    By Yingxin Zhou

    Data from these field studies and previous case study data have been combined to define ultra-dose seam mining environments and relate them to observed failure conditions. A rating system for ultra-cl

    Jan 1, 1990

  • SME-ICGCM
    Jointing Effects On Pillar Strength

    By Gabriel Esterhuizen

    When designing pillars in coal and hard rock mines it is necessary to determine the strength of the rock mass forming the pillars. Empirical strength equations, based on rock mass classification techn

    Jan 1, 2000